32 cards. Read the term and the definition here. The deck at the top of this page is optional.

MPO designation threshold
Metropolitan planning organizations are required in urbanized areas with population above 50,000; urbanized areas above 200,000 are further designated transportation management areas with added requirements.
Transportation management area
A TMA is an urbanized area over 200,000 population; TMAs must run a congestion management process, certify their planning process, and make project-level conformity determinations.
Long-range plan horizon
Federal law requires the metropolitan transportation plan to cover at least a 20-year horizon and to be updated every four years in nonattainment areas, every five years otherwise.
Fiscal constraint requirement
Plans and TIPs may include only projects for which funding can reasonably be expected; revenue forecasts must be explicit and project costs shown in year-of-expenditure dollars.
Section 4(f) protection
Section 4(f) bars federal approval of a project using publicly owned parks, recreation areas, wildlife refuges, or historic sites unless no prudent alternative exists and impacts are minimized.
NEPA document classes
NEPA review yields an environmental impact statement for significant impacts, an environmental assessment leading to a finding of no significant impact, or a categorical exclusion for minor actions.
TIP minimum coverage
The transportation improvement program must cover at least four years, be updated at least every four years, and list projects prioritized and consistent with the long-range plan.
Transportation conformity test
In nonattainment areas, plans and TIPs must show conformity with the state implementation plan through a build/no-build emissions test and a fiscal budget test over the full horizon.
Four-step travel demand model
The classic sequence is trip generation, trip distribution, mode choice, and traffic assignment; output of each step becomes input to the next, often with feedback loops.
Gravity model formula
Trips between zones equal productions of origin i times attractions of destination j times a friction factor and adjustment factor, normalized by the sum across all destinations.
Peak hour factor
PHF equals peak hour volume divided by four times the busiest 15-minute volume in that hour; values near 1.0 indicate steady flow, lower values indicate peaking.
K and D factors
K is design hour volume as a percentage of AADT; D is the share of peak hour volume traveling in the heavier direction, used to size directional capacity.
Sample size for proportions
n equals z-squared times p times one minus p divided by e-squared; at 95 percent confidence with p of 0.5 and plus or minus 5 percent error, n is about 384.
Buffer index definition
Buffer index is the 95th percentile travel time minus the mean travel time, divided by the mean; it expresses the extra time travelers must add for reliability.
GEH validation statistic
GEH compares modeled and observed link volumes using the square root of twice the squared difference over the sum; values below 5 indicate acceptable fit.
Travel demand elasticity
Elasticity is the percent change in demand divided by the percent change in price, travel time, or another factor; values below one in magnitude are inelastic.
Transportation control measures
TCMs are strategies written into a state implementation plan to reduce mobile source emissions, such as transit expansion, ridesharing programs, and employer trip reduction rules.
National performance measures
Federal rules set measures for safety (PM1), infrastructure condition (PM2), and system performance, congestion, and CMAQ emissions (PM3); states and MPOs must set targets.
Environmental justice executive order
Executive Order 12898 requires agencies to identify disproportionately high and adverse health or environmental effects on minority and low-income populations and ensure meaningful involvement.
Crash modification factor
A CMF is the ratio of crashes after a treatment to crashes before it, with other factors held constant; expected crashes equal predicted crashes multiplied by the CMF.
Vision Zero safe system
Vision Zero treats traffic deaths as preventable and targets zero fatalities, using a safe system approach with lower speeds, forgiving roadsides, and redundant protection.
SMART objective criteria
Objectives should be specific, measurable, achievable, relevant, and time-bound, so that progress toward broader goals can be tracked and reported to decision makers.
Complete Streets policy
A Complete Streets policy directs routine design, construction, and operation of roadways to serve pedestrians, bicyclists, transit riders, and drivers of all ages and abilities.
Congestion management process
TMAs must operate a congestion management process that identifies congested facilities, evaluates management and operations strategies, and links results to the plan and TIP.
Federal default match ratio
Most federal-aid highway and transit capital grants provide an 80 percent federal share; Interstate construction reaches 90 percent, and some safety or air quality programs differ.
Highway Trust Fund revenue
The Highway Trust Fund is financed mainly by federal fuel excise taxes of 18.4 cents per gallon on gasoline and 24.4 cents on diesel, plus truck-related taxes.
Congestion Mitigation Air Quality funds
CMAQ funds support projects that reduce emissions in nonattainment and maintenance areas and are flexible between highway and transit eligible purposes.
Net present value rule
Future benefits and costs are discounted to year zero at an approved real rate; a positive net present value and a benefit-cost ratio above 1.0 justify the investment.
Tax increment financing
TIF captures the growth in property tax revenue above a frozen base year within a defined district and uses it to repay infrastructure or redevelopment bonds.
Regression to the mean bias
Sites chosen for treatment because of unusually high crash counts tend to improve anyway; sound evaluations use comparison groups or empirical Bayes correction.
Transportation asset management plan
A TAMP documents condition targets, risk, and life-cycle investment strategies for pavements and bridges; states must prepare one under federal asset management rules.
Obligation authority
Contract authority lets states commit federal funds, but annual obligation limitation, distributed as formula obligation authority, caps how much can actually be obligated each year.