Shift crane inspection
Visual and functional examination performed before each shift covering controls, wire rope, hooks, safety devices, and fluid levels; deficiencies must be corrected before the crane is used.
Anti two-block device
Safety device that stops the hoist when the load block approaches the boom tip sheave, preventing wire rope damage, rope slack, and loss of the load.
Broken wire removal criteria
Running wire rope is removed from service at six randomly distributed broken wires in one lay, or three broken wires in one strand of one lay.
Load moment indicator
Instrument that computes load weight multiplied by radius and warns or stops operation before the crane exceeds its rated load moment or capacity.
Annual crane inspection
Comprehensive, documented inspection of the entire crane required at least yearly, covering structural members, braking systems, and safety devices beyond shift and monthly checks.
Power line minimum clearance
For energized lines, keep at least 20 feet away up to 350 kV and 50 feet above 350 kV unless the utility confirms the line is de-energized and grounded.
Hoist brake holding requirement
Hoisting brakes must hold at least 125 percent of the rated load and must be tested after any repair or adjustment before the crane returns to service.
Crane cab fire extinguisher
A fire extinguisher rated at least 5 BC must be accessible in the cab or on the crane at all times while the equipment is in operation.
Sling angle factor
Multiplier applied to the load carried per leg: about 1.155 at 60 degrees, 1.414 at 45 degrees, and 2.0 at 30 degrees measured from horizontal.
Bridle sling leg tension
Per-leg tension equals half the total load divided by the sine of the horizontal angle; steeper legs carry less tension than shallow legs.
Net crane capacity
Chart capacity minus the weight of the hook block or ball, jib, slings, shackles, spreader beam, and all other below-the-hook lifting attachments.
Wire rope sling design factor
Wire rope slings are rated at a 5 to 1 ratio, so the working load limit is one fifth of the sling's published breaking strength.
Chain sling design factor
Chain slings use a 4 to 1 design factor, so working load limit equals breaking strength divided by four, reduced further for choke and basket hitches.
Critical lift criteria
A lift exceeding 75 percent of chart capacity, using multiple cranes, lifting personnel, or traveling over occupied areas or hazardous materials.
Load moment
The product of load weight and radius measured from the crane's rotation center; it must never exceed the crane's rated load moment.
Choker hitch capacity loss
A choker hitch reduces sling capacity to roughly 75 to 80 percent of its vertical rating because the sling is compressed against itself at the choke.
Emergency stop hand signal
Arms extended horizontally with palms down, moved back and forth; any person on the site may give this signal to halt crane operations immediately.
Swing radius barricade
A barrier enclosing the rotating superstructure and counterweight that keeps workers out of the tail-swing area where they could be struck or crushed.
Personnel platform lifting limit
When lifting personnel in an approved platform, the total load must not exceed 50 percent of the crane's rated capacity at that radius.
Ground bearing pressure
The pressure outriggers or tracks impose on soil; mats and blocking spread the load so pressure stays below the soil's bearing capacity.
Power line contact response
The operator stays in the cab and warns others away; if escape is required, jump clear without touching the machine and shuffle away.
Pre lift meeting
Briefing of the operator, riggers, signal person, and crew that covers the lift plan, roles, hazards, and communication method before a critical lift.
Designated signal person
One qualified individual directing the operator by standard hand, voice, or radio signals; the operator obeys only that person except for emergency stops.
Wind speed lift limit
The manufacturer's maximum wind speed for lifting; operations stop when wind exceeds it or when the load's sail area makes the load unmanageable.
Rhode Island hoisting license
Credential issued by the Rhode Island Department of Labor and Training under RIGL chapter 28-26 authorizing operation of specified classes of hoisting equipment.
RIDLT licensing authority
The Rhode Island Department of Labor and Training administers hoisting engineer examinations, issues licenses, and enforces licensing requirements throughout the state.
Unlicensed operation penalty
Operating hoisting equipment in Rhode Island without a valid license is a violation subject to fines and enforcement action against the operator and employer.
License class endorsement
The class shown on a Rhode Island hoisting license limits the holder to specific equipment types and capacities; operating outside that scope is a violation.
Carry license on site
A hoisting engineer must keep the Rhode Island license available for inspection by the Department of Labor and Training or law enforcement while operating.
License renewal requirement
Rhode Island hoisting licenses expire and must be renewed through RIDLT; operating after the expiration date is treated as unlicensed operation.
OSHA operator certification
Federal crane rules enforced in Rhode Island require operators to be certified by an accredited body for the crane type they operate.
Rhode Island Dig Safe call
State law requires calling 811 so underground utilities are marked before excavating or placing outriggers, anchors, and mats at a job site.