Pre-Shift Inspection

The visual and operational checks an operator performs on a crane before each work shift, covering fluid levels, wire rope, hooks, brakes, and safety devices. Any defect affecting safety must be corrected before use.

Related: Periodic Inspection, Wire Rope Lay
Periodic Inspection

A documented, more thorough examination of a crane's structures, mechanisms, and safety devices performed at defined intervals, commonly annually, by a qualified person, and kept in the equipment record.

Related: Pre-Shift Inspection, Qualified Person
Qualified Person

Someone who, by recognized degree, certificate, professional standing, or extensive knowledge, training, and experience, has demonstrated the ability to solve problems in the subject area, such as crane inspection or lift planning.

Related: Competent Person, Periodic Inspection
Load Moment Indicator

An instrument that senses boom length, boom angle, and load to calculate load moment, then warns the operator and often stops functions before the crane's rated capacity for the current configuration is exceeded.

Related: Rated Capacity Limiter, Load Chart
Rated Capacity Limiter

A control system that compares the crane's actual load and geometry with its load chart and limits or stops functions that would push the machine beyond rated capacity.

Related: Load Moment Indicator, Net Capacity
Anti-Two-Block Device

A sensing and limiting system that stops hoisting up or booming down when the hook block approaches the boom tip, preventing contact that can snap wire rope or damage crane components.

Related: Load Moment Indicator, Two-Blocking
Boom Angle Indicator

A gauge or digital readout positioned so the operator can see the angle of the boom above horizontal, one of the values needed to read the load chart.

Related: Load Chart, Operating Radius
Outrigger

A retractable beam with a vertical jack that stabilizes a crane and transfers its reactions into the ground away from the chassis. Outriggers must be fully extended and set per the manufacturer's instructions.

Related: Outrigger Pad, Ground Bearing Capacity
Outrigger Pad

A load-spreading block, float, or mat placed under an outrigger to enlarge the contact area and reduce pressure on the supporting surface.

Related: Outrigger, Ground Bearing Capacity
Wire Rope Lay

The pattern in which strands are wound around the rope core, either regular lay or lang lay. The lay affects abrasion resistance, fatigue behavior, and how the rope must be inspected.

Related: Pre-Shift Inspection, Periodic Inspection
Working Load Limit

The maximum mass or force a rigging component or sling is designed to support in a given configuration, assigned by its manufacturer after the design factor has been applied.

Related: Design Factor, Shackle
Design Factor

The ratio of a component's breaking strength to its working load limit. It supplies the reserve strength that covers wear, dynamic effects, and minor overload in service.

Related: Working Load Limit
Sling Angle

The angle measured between a sling leg and the horizontal. As the angle flattens, tension in each leg rises steeply, so a given load needs slings of higher rating.

Related: Basket Hitch, Working Load Limit
Choker Hitch

A sling arrangement in which the sling wraps around the load and passes through one eye so it tightens on itself. Choking reduces capacity below the sling's single-leg vertical rating.

Related: Basket Hitch, Working Load Limit
Basket Hitch

A sling passed under the load with both eyes on the hook. With vertical legs it can carry roughly twice the single-leg rating, but only if the load is balanced and cannot roll out.

Related: Sling Angle, Choker Hitch
Shackle

A U-shaped rated connector closed by a pin or bolt, used to join slings to hooks, eyes, or lifting points. The pin must be fully seated and the body must not be side-loaded.

Related: Working Load Limit
Center of Gravity

The point at which a load's weight is treated as concentrated. The hook must be placed over this point and the rigging arranged around it so the load hangs level and stable.

Related: Tag Line
Load Chart

A manufacturer-supplied table or curve giving the maximum allowable load for each combination of radius, boom length, boom angle, and configuration, including any required deductions.

Related: Operating Radius, Net Capacity, Load Moment Indicator
Operating Radius

The horizontal distance from the crane's center of rotation to the vertical line through the load's center of gravity. Allowable capacity falls as radius grows.

Related: Load Chart, Boom Angle Indicator
Net Capacity

The load a crane may actually lift after subtracting from the gross rated capacity the weight of the hook block, rigging, and any other attachments that travel with the load.

Related: Load Chart, Working Load Limit
Tag Line

A light rope fastened to the load and held by a worker standing outside the swing zone, used to control rotation and swinging while the load is hoisted and placed.

Related: Center of Gravity, Exclusion Zone
Two-Blocking

Contact between the hook block and the boom tip or upper sheave that removes the slack the anti-two-block device needs and can shock-load or break the hoist rope.

Related: Anti-Two-Block Device, Pre-Shift Inspection
Competent Person

Someone able to identify existing and predictable hazards in the surroundings or working conditions, and who is authorized to take prompt corrective measures to eliminate them.

Related: Qualified Person, Signal Person
Exclusion Zone

A barricaded or clearly marked area around a crane's swing radius and load path that only essential personnel may enter while the equipment is operating.

Related: Tag Line, Struck-By Hazard
Power Line Clearance

The minimum distance equipment must keep from energized overhead lines, set by table according to voltage, verified before work starts, with a spotter used when required.

Related: Signal Person, Exclusion Zone
Ground Bearing Capacity

The ability of soil or a structural surface to carry the pressure applied by outriggers, tracks, or wheels without excessive settlement or outright failure.

Related: Outrigger Pad, Outrigger
Signal Person

A qualified worker who directs the crane operator by hand, voice, or radio, and who must be used whenever the operator's view of the load or travel path is blocked.

Related: Hand Signals, Exclusion Zone
Hand Signals

Standardized arm and hand positions used to tell the operator to hoist, lower, stop, swing, or boom. Everyone on the crew must use and recognize the same signals.

Related: Signal Person
Wind Speed Limit

The maximum wind speed at which a crane may operate or a load may be handled, taken from the manufacturer's manual and adjusted for the sail area of the load.

Related: Load Chart
Struck-By Hazard

The danger of a worker being hit by a moving load, boom, counterweight, or falling rigging. It is controlled with exclusion zones, tag lines, and planned swing direction.

Related: Exclusion Zone, Tag Line
Hoisting Engineer License

A credential issued by the Rhode Island Department of Labor and Training that authorizes a person to operate hoisting equipment in the state. Operating without a valid license is prohibited.

Related: Scope of License, License Renewal
RIGL Chapter 28-26

The Rhode Island statute, the Hoisting Engineers law, that establishes the licensing requirement, exemptions, the department's authority, and penalties for hoisting equipment operation in the state.

Related: Hoisting Engineer License, Scope of License
Scope of License

The specific class or type of hoisting equipment a Rhode Island hoisting engineer license permits its holder to operate, together with the limits on that authority.

Related: Hoisting Engineer License, RIGL Chapter 28-26
License Renewal

The process a Rhode Island hoisting engineer follows to keep a license in force, involving an application, fee payment, and any required documentation before the expiration date.

Related: Hoisting Engineer License
Rhode Island Division of Occupational Safety

The state agency that enforces workplace safety and health standards for Rhode Island public-sector employers under a plan approved by federal OSHA.

Related: Competent Person, Hoisting Engineer License