RI Hoisting Engineer study materials
RI Hoisting Engineer study resources

RI Hoisting Engineer: Hoisting Equipment Operation and Inspection

RI Hoisting Engineer · Work through your exam, one topic at a time.

All guide sections

Hoisting Equipment Operation and Inspection

Three inspection clocks, not one

A hoisting engineer works under layered inspection duties. Before every shift, the operator (or a competent person assigned to the task) performs a shift-level inspection covering controls, brakes, wire rope, hooks and latches, sheaves, drum spooling, outriggers and floats, level indicators, the load moment indicator, the anti-two-block device, and warning devices. Monthly and annual inspections are more thorough, must be documented, and under the crane standard Rhode Island adopts are performed by a qualified inspector; the annual inspection is the comprehensive one. Post-assembly and post-repair inspections apply whenever the crane is erected or a critical component is replaced.

What takes a component out of service

Questions love removal criteria. A running wire rope is rejected for 12 randomly distributed broken wires in one lay, 4 broken wires in one strand in one lay, severe corrosion, kinking, bird-caging, core protrusion, or diameter loss beyond the manufacturer's limit. Hooks come out of service for throat opening growth, wear past the maker's limit, cracks, or a missing or deformed latch. Brakes must hold the rated load without drift.

Traps

  • Assuming any worker can sign off the monthly inspection.
  • Treating the anti-two-block device or LMI as optional add-ons.
  • Trusting a green tag with no date, signature, or inspector name.

Worked example

A 6x19 running rope shows 5 broken wires in a single strand within one lay. Five exceeds the four-wire strand rule, so the rope is removed regardless of the total wire count.