IIQ Engineer study materials
IIQ Engineer study resources

IIQ Engineer study plan

IIQ Engineer · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Installation, Upgrade, and System Configuration

  • Stand up a working sandbox instance and complete first-run system configuration (identity sources, email, password policy, logging)

  • Diagram the platform architecture and label each component you configured, noting where data is stored and processed

  • Execute a version upgrade on the sandbox and record the pre-upgrade checklist, backup steps, and post-upgrade verification steps

  • Build a reusable installation and configuration checklist you can apply to a fresh environment

Your checkpoint

A written sandbox runbook covering install, baseline configuration, and one completed upgrade with verification results

Week 2

Application Onboarding and Connector Configuration

  • Connect at least one authoritative source system and complete account and group aggregation successfully

  • Map source attributes to identity attributes and justify each mapping decision

  • Configure a second connector type with different authentication and schema characteristics

  • Capture the aggregation error log and resolve at least two defects found during onboarding

Your checkpoint

Two working connectors with aggregation evidence and an attribute mapping table

Week 3

Application Onboarding and Connector Configuration & Installation, Upgrade, and System Configuration

  • Onboard a target system for provisioning and confirm account creation works end to end

  • Configure connector-level settings that depend on system configuration (timeouts, correlation, account filters)

  • Troubleshoot and document three common onboarding failures with root cause and fix

  • Write a repeatable connector onboarding checklist derived from your three builds

Your checkpoint

A connector onboarding checklist plus a troubleshooting log of three resolved failures

Week 4

Identity Lifecycle Management and Provisioning

  • Configure joiner, mover, and leaver lifecycle events for your test population

  • Run a full joiner-to-leaver scenario and verify each provisioning action against the target systems

  • Define and apply identity correlation and account correlation rules, then test edge cases such as duplicate or orphan accounts

  • Identify and document where manual intervention is still required in your lifecycle design

Your checkpoint

An end-to-end lifecycle test report showing one complete joiner-mover-leaver cycle with per-step evidence

Week 5

Roles, Entitlements, and Role Modeling

  • Inventory entitlements across your connected systems and classify them by risk and owner

  • Build a role model that bundles entitlements, including at least one business role and one technical role

  • Detect and resolve conflicting or over-permissioned entitlement combinations in your model

  • Apply a role-mining or role-assignment approach to a sample user population and measure coverage

Your checkpoint

A role model artifact with entitlement-to-role mapping and a coverage/conflict summary

Week 6

Certifications, Policies, and Compliance Governance & Rules, Workflows, and Platform Customization

  • Design and launch a certification campaign, then complete reviewer actions and close the campaign

  • Write two policies (for example, separation of duties and access request) and attach enforcement points

  • Build a rule or transform that drives a real decision in your sandbox and test it with pass and fail cases

  • Configure a workflow that automates one manual step from your week-4 lifecycle design

Your checkpoint

A closed certification campaign with results plus two tested policies and one automated workflow

Week 7

Rules, Workflows, and Platform Customization & Troubleshooting, Maintenance, and Performance

  • Extend your workflow to include an approval step and a notification, then verify both paths

  • Instrument the environment for troubleshooting: review task results, logs, and audit trails to locate a seeded fault

  • Measure and improve performance on a slow aggregation or provisioning task

  • Document a triage procedure that maps symptoms to likely causes across connectors, rules, and workflows

Your checkpoint

A triage runbook containing at least three seeded faults, root causes, and fixes, plus one performance improvement measurement

Week 8

Installation, Upgrade, and System Configuration & Application Onboarding and Connector Configuration & Identity Lifecycle Management and Provisioning & Roles, Entitlements, and Role Modeling & Certifications, Policies, and Compliance Governance & Rules, Workflows, and Platform Customization & Troubleshooting, Maintenance, and Performance

  • Re-audit your weakest two domains and close the gaps with targeted hands-on repetition

  • Complete timed mixed-domain practice sets and review every missed item to root cause

  • Re-run your full lifecycle, certification, and workflow scenarios in a single clean pass to confirm integration

  • Finalize a one-page reference sheet of commands, settings, and decision points you will use on the job

Your checkpoint

A timed full-scope practice score with a gap-closure log and a finished one-page reference sheet

Milestones

Week 2: Two connectors aggregating successfully with mapped attributes and a clean error review

Week 4: A complete joiner-mover-leaver cycle executed and evidenced across source and target systems

Week 6: Role model documented and a certification campaign closed with enforcement policies and one automated workflow in place

Week 8: Timed mixed-domain practice completed with all misses traced to a root cause and re-tested