Quick reference

Welder Performance Qualification

  • A welder performance qualification tests a welder's skill using a qualified WPS; it is separate from procedure qualification, which tests the procedure.

  • Essential variables for welder qualification commonly include process, position, base-metal thickness, filler-metal classification, backing, and vertical progression; changes beyond code limits require requalification.

  • AWS D1.1 position rule: a 3G vertical-groove qualification also qualifies 1G and 2G, but not 4G; a 4G qualification qualifies 1G, 2G, and 4G.

  • ASME IX: a groove-weld test qualifies the welder for groove and fillet welds within the qualified ranges; a fillet-only test qualifies only fillet welds.

  • Qualification validity: under common codes, a welder's qualification lapses after six months without welding with the qualified process; requalification or an approved extension is required.

  • Test coupon acceptance: visual examination and bend tests, or permitted radiographic examination, must meet code criteria; defects exceeding limits fail the test and may require retesting per code.

  • Records must show welder ID, process, position, thickness range, filler metal, code, test date, and results; production welding must stay within those limits.

Quick reference

Welding Procedure Qualification

  • A WPS is a written instruction; a PQR is the supporting test record. Production welding must use a WPS supported by a PQR or by prequalified status.

  • Procedure essential variables include process, base-metal P-number or group, thickness range, filler F-number or A-number, preheat, PWHT, position, and electrical characteristics; changes outside ranges require requalification.

  • ASME IX procedure qualification limits both base-metal thickness and deposited weld-metal thickness; the WPS range must reflect both limits, not just coupon thickness.

  • A tensile test specimen generally must reach the minimum specified tensile strength of the base metal; failure below that value is a qualification failure.

  • Bend tests evaluate ductility and soundness; side bends are commonly used for thick coupons, while face and root bends are used for thinner coupons.

  • AWS D1.1 prequalified WPSs are allowed only when all prequalified conditions are met; any deviation requires procedure qualification testing.

  • Impact qualification requires testing at the specified temperature with code-specified specimen location and acceptance energy; base metal, heat-affected zone, and weld metal may each be tested.

Quick reference

Welding Coordination and QA

  • Welding coordination ensures that qualified WPSs, qualified welders, approved filler metals, and correct inspection requirements are available before production begins.

  • Document control must prevent use of superseded WPS revisions or drawings; only approved documents should be at the work site.

  • Traceability links each joint to base-metal heat number, filler lot, WPS revision, welder ID, and inspection results.

  • Nonconformance reports record the requirement, the actual condition, disposition such as repair, rework, accept, or reject, and corrective action.

  • Low-hydrogen electrodes require holding ovens after opening and rebaking per manufacturer limits; exposure time and temperature must be controlled.

  • Preheat and interpass temperatures are measured with calibrated instruments at code- or procedure-specified locations and recorded.

  • Welding and inspection equipment must be within calibration; out-of-calibration instruments can invalidate test results and require rework of affected inspections.

Quick reference

Nondestructive Examination Coordination

  • NDT method selection matches the expected discontinuity, geometry, material, and code; no single method detects all discontinuities.

  • RT is suited to volumetric internal discontinuities; UT is suited to planar and internal discontinuities; PT and MT are surface or near-surface methods.

  • MT applies only to ferromagnetic materials; magnetization direction should be approximately perpendicular to the expected discontinuity orientation.

  • PT requires a nonporous, clean surface and controlled dwell and development times; it detects surface-breaking discontinuities only.

  • NDT personnel must be certified by method and level under the applicable scheme, such as ASNT SNT-TC-1A, CP-189, or ISO 9712.

  • NDT procedures specify technique, equipment, calibration, scanning, and acceptance criteria; the acceptance standard must match the construction code.

  • NDT reports should record method, procedure, equipment, calibration, examiner, locations, results, and acceptance standard.