SE Exam study materials
SE Exam study resources

Tile Floor and a Plumber's Notch in 2×10 Joists

SE Exam · Put your knowledge to work in context.

All case studies

Tile Floor and a Plumber's Notch in 2×10 Joists

A 1970s two-story wood-frame apartment building has 2×10 Douglas Fir–Larch No. 2 floor joists at 16 in on center, simply spanning 14 ft between bearing walls, with a ¾ in subfloor and carpet. Properties: E = 1.6×10⁶ psi, I = 98.9 in⁴, S = 21.4 in³, Fb = 875 psi with the repetitive member factor permitted. A remodel replaces the carpet with a bonded mortar bed and ceramic tile, adding about 15 psf dead load. Existing dead load (subfloor, ceiling, MEP, finishes) is 12 psf; live load is 40 psf. The plumber also wants a 3 in deep notch in the top edge of one joist at midspan to pass a new drain line.

1. Are the existing joists adequate for the tile floor? Check both bending and deflection.

Read the worked answer

Service loads per joist (tributary 16/12 = 1.333 ft):

  • Dead: (12 + 15) × 1.333 = 36 plf = 3.0 lb/in
  • Live: 40 × 1.333 = 53.3 plf = 4.44 lb/in

Bending:

  • M = wL²/8, L = 14 ft = 168 in
  • MD = 36 × 14²/8 = 882 ft-lb = 10,584 in-lb
  • ML = 53.3 × 14²/8 = 1,306 ft-lb = 15,672 in-lb
  • Total = 26,256 in-lb
  • Allowable: Fb′ × S = 875 × 1.15 × 21.4 = 21,530 in-lb

Overstressed by about 22%. Before the tile (12 psf dead) the total was 20,376 in-lb, i.e. just adequate - the mortar bed is what pushes the joists over.

Deflection (Δ = 5wL⁴/384EI, EI = 1.6×10⁶ × 98.9 = 1.58×10⁸ lb-in²):

  • Live only: 5 × 4.44 × 168⁴/(384 × 1.58×10⁸) = 0.29 in = L/577
  • Total: 5 × 7.44 × 168⁴/(384 × 1.58×10⁸) = 0.49 in = L/344

Ceramic tile over a bonded mortar bed generally needs the total-load deflection held to L/360, so L/344 misses. Both bending and total-load deflection fail; it would be wrong to report this as a deflection-only problem.

2. Is the proposed 3 in top-edge notch at midspan acceptable?

Read the worked answer

No. Three separate problems, and the location makes each of them worse:

  1. Depth limit. Top-edge notches in sawn joists are limited to D/4, i.e. 9.25/4 = 2.3 in. A 3 in notch exceeds it.
  2. Section loss at the worst place. A 3 in notch leaves 6.25 in of depth, so I drops to (6.25/9.25)³ ≈ 31% of the original - a 69% local loss of stiffness right where the moment is maximum. On a floor that already misses L/360 by a small margin, that is not a detail, it is a failure.
  3. The pipe will not fit anyway. A drain needs roughly 3½ in of clearance. A hole is limited to D/3 ≈ 3.1 in and must be kept at least 2 in clear of the edges, so a legal round hole does not exist either.

The correct answer is to route the drain below the joists in a soffit or chase, or to reframe: cut out the joist, header off to the neighbors on both sides with a doubled 2×10 header, and hang the drain in the resulting bay. Do not approve a notch here and do not accept 'it's only one joist' - that joist is also the one the tile bed will crack over.

3. What repair would you specify, and how do you confirm it works?

Read the worked answer

Two deficiencies to fix separately: strength and stiffness of the field, and the pipe routing.

Joists. Full-length 2×10 sisters, glued and screwed, on every joist in the tiled area:

  • S doubles to 42.8 in³ → capacity 43,000 in-lb against 26,256 in-lb, DCR 0.61.
  • I doubles to 1.98×10⁸ → total-load Δ = 0.245 in = L/686, comfortably inside L/360 for tile.
  • Verify that the sister bears fully at both walls; a sister that stops short of bearing adds stiffness but almost no strength, which is the classic field shortcut.

Alternative if sisters are impractical (plumbing, electrical): a midspan beam cutting the span to 7 ft reduces M and Δ by 4× and 16× respectively, but it needs a new footing and load path through the floor below - usually more intrusive in an occupied apartment.

Pipe. Relocate below the joists or reframe around a header; no notch, no hole larger than D/3.

Verification. Have the contractor confirm the sister bearing and the adhesive used (structural adhesive, not construction adhesive), and photograph before the subfloor goes down. Confirm the tile installer's L/360 requirement in writing so the deflection criterion is documented.