SE Exam study materials
SE Exam study resources

SE Exam study plan

SE Exam · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Vertical Forces

  • Compute tributary and influence areas for a column grid, a joist bay, and a two-way slab panel without reference notes

  • Assemble complete gravity load paths from roof to foundation for a three-story steel-framed building

  • Apply ASCE 7 dead, live, roof live, snow, and rain load provisions to build unfactored and factored combinations

  • Distinguish ASD versus LRFD combination sets and identify which one a given problem statement requires

Your checkpoint

One-page load-path sketch and a 25-problem gravity-loading set scored at 80% or better, with every miss corrected in writing

Week 2

Vertical Forces

  • Analyze simply supported, cantilever, and continuous beams for shear, moment, and deflection under gravity loads

  • Size a steel or wood beam for flexure, shear, and deflection limit states and justify the controlling criterion

  • Evaluate column axial capacity including effective length and slenderness effects

  • Check a slab or deck system against code deflection and vibration criteria

Your checkpoint

Two fully worked beam and column designs (one steel, one wood) with all limit-state checks shown and a written one-paragraph controlling-limit summary

Week 3

Lateral Forces

  • Derive wind pressure profiles on a rigid building envelope, including exposure, gust, and topographic factors

  • Compute seismic base shear using the equivalent lateral force procedure, including period and seismic weight

  • Compare wind and seismic demand for the same building and identify which governs each direction

  • Assemble lateral load combinations and verify overstrength and redundancy factors are applied where required

Your checkpoint

A wind-versus-seismic comparison sheet for one mid-rise building showing base shear, story shear, and a governing-load statement for both principal directions

Week 4

Lateral Forces

  • Distribute lateral story forces through a diaphragm to vertical elements of the lateral force resisting system

  • Quantify accidental and inherent torsional eccentricity and compute resulting shear amplification

  • Calculate story drift and check against allowable drift limits

  • Classify a given structure as regular or irregular and explain the code consequence of each irregularity

Your checkpoint

A lateral force distribution table for a five-story building with torsional amplification, drift ratios, and an explicit pass or fail against the drift limit

Week 5

Vertical Forces

  • Perform gravity member checks in at least three materials: reinforced concrete, structural steel, and timber

  • Design a simple shear connection and a bearing connection, showing all required limit states

  • Resolve foundation bearing and settlement demand from column reactions

  • Identify common detailing and constructability failures related to gravity framing

Your checkpoint

A multi-material gravity design packet with three member checks, two connection checks, and one footing sizing, all with clear code citations

Week 6

Lateral Forces

  • Compare braced frame, moment frame, shear wall, and dual system behavior under lateral load

  • Compute the stiffness contribution of each lateral element and distribute story shear by relative stiffness

  • Check diaphragm shear, chord force, and collector force for a flexible or rigid diaphragm assumption

  • Trace lateral forces into the foundation and identify overturning and uplift demand

Your checkpoint

A lateral system selection memo plus a worked stiffness-based shear distribution and overturning check for a braced frame and a shear wall option

Week 7

Vertical Forces & Lateral Forces

  • Solve combined gravity-plus-lateral problems where vertical loads interact with drift and P-delta effects

  • Apply P-delta amplification and determine when a second-order analysis is required

  • Evaluate a full load combination set to locate the governing case for a given member in a given direction

  • Complete mixed-topic problems under a strict per-problem time cap

Your checkpoint

A timed 40-problem mixed set (50 percent vertical, 50 percent lateral) completed at 70% or better with a categorized error log

Week 8

Vertical Forces & Lateral Forces

  • Execute two full-length timed mock exams under exam-day conditions

  • Diagnose the top three recurring error patterns from the mock exams and re-drill them

  • Reduce reliance on notes by condensing weak topics into a single review sheet

  • Assemble and index a final reference binder organized by code section and problem type

Your checkpoint

Two completed mock exams with scored results, a ranked weakness list with remediation actions, and a finished indexed reference binder

Milestones

Week 2: Completed every vertical-forces load and member check without notes, and scored 80% or better on the week 1 and week 2 problem sets

Week 4: Produced a wind-versus-seismic base shear comparison and a lateral distribution with drift check for one building, and can explain which load governs in each direction

Week 6: Can select a lateral system, justify it in writing, and carry a story shear through stiffness distribution, diaphragm, and overturning checks unaided

Week 8: Scored 70% or better on both timed mock exams and hold a completed weakness ranking with a written remediation action for each of the top three gaps