C&G 2391-52 study plan
C&G 2391-52 · Give each week a clear focus.
8 weeks · About 6 hours per week
Statutory and non-statutory requirements, BS 7671 and associated guidance & Safe isolation, preparation for inspection and testing, safe working practices
Map every stage of the verification and periodic process to its legal and standard source (HSWA, EAWR, BS 7671 Parts 6 and 7, associated guidance notes) in a single reference table you write yourself
Write out and rehearse a full safe isolation procedure from origin to final circuit, including identifying the point of isolation, locking off, proving the voltage indicator on a known source before and after the test, and applying a warning notice
List the documents and information you must obtain and check before starting work (previous certificates, schedules, extent and limitations, authorisation to isolate) and state who authorises isolation and re-energisation
Distinguish, with three worked examples, what falls inside initial verification versus periodic inspection, and where the boundary of a periodic scope can legitimately stop
Your checkpoint
A one-page safe isolation procedure plus a completed isolation record and tester-proving log for a simulated single-phase board change
Inspection (initial verification and periodic inspection)
Work through every heading of the schedule of inspections and state the specific checks required under each for a domestic consumer unit replacement
Order the inspection activities so that all dead inspection is completed before any live testing begins, and justify each ordering decision
Identify the 10 most common non-compliances found on a domestic installation and state where each is cited in BS 7671
Decide, for eight given site findings, whether each is a departure, a non-compliance, or acceptable, and write the reason in one sentence
Your checkpoint
A completed schedule of inspections for a sample installation with every item marked inspected/not applicable and a written note on each limitation
Continuity and resistance testing of protective and bonding conductors & Insulation resistance testing
Carry out and record the continuity tests: protective conductor continuity, main and supplementary protective bonding continuity, ring final circuit continuity (all three steps), and radial r1 and r2
Calculate expected R1+R2 from conductor resistance tables before measuring, then compare the calculated and measured values and explain any difference greater than 0.05 ohm
Perform insulation resistance tests at 500 V DC on a whole installation and on a single circuit, applying the correct procedure where SPDs, surge protection or voltage-sensitive equipment are present
Judge insulation resistance results against the 1 megohm minimum and the permitted reduced test voltage case, recording test voltage, duration and any disconnections
Your checkpoint
A completed continuity and insulation resistance section of a schedule of test results for a sample installation, with all expected values calculated and shown alongside measured values
Earth fault loop impedance and earth electrode resistance testing & RCD testing and functional verification
Determine earth fault loop impedance by direct measurement and by calculation from Ze plus R1+R2, and reconcile the two figures
Measure or establish Ze and earth electrode resistance, selecting the correct method (three-point, clamp, or calculated) for the electrode arrangement given
Verify measured or calculated Zs against the disconnection times in the relevant tables for the protective device fitted, including the 0.8 rule for conductor operating temperature
Carry out a full RCD test sequence on a 30 mA Type A device: half rated current, rated current, five times rated current, and the correct test for DC sensitivity, then record every operating time and pass/fail verdict
Confirm the functional test of the RCD test button and state what it does and does not prove
Your checkpoint
A results table comparing measured and calculated Zs for six circuits, plus a complete RCD test schedule showing operating times at each multiplier with pass/fail against BS 7671 limits
Periodic inspection, sampling and condition reporting (EICR) & Inspection (initial verification and periodic inspection)
Justify a sample size for a periodic inspection of a given multi-board premises using the applicable sampling guidance, and state what you would do if the sample reveals a widespread defect
Write an extent of works and limitations statement for a periodic inspection where no previous records exist and some areas are inaccessible
Assign C1, C2, C3 or FI to fifteen given observations with a written justification for each code
Re-run the schedule of inspections against an existing installation with no prior certification and note where the checks differ from a new installation
Your checkpoint
A complete draft condition report for a sample premises, including extent and limitations, summary of condition, and a justified coded observations list
Certification, schedules and reporting documentation & Interpretation of test results, defect classification and client communication
Complete a full electrical installation certificate, a minor works certificate and a schedule of test results for a sample job, with no section left blank or marked not applicable without reason
Cross-check recorded results against expected values and flag every anomaly that would require re-testing before the certificate is issued
Classify ten supplied observations into codes and rank them into a prioritised remedial action list with indicative timescales
Write a plain-English client letter explaining a C2 observation, the danger it presents, and the required remedial action, without jargon
Your checkpoint
A completed electrical installation certificate and schedule of test results for one sample job, plus a one-page client-facing summary letter
Continuity and resistance testing of protective and bonding conductors & Earth fault loop impedance and earth electrode resistance testing & RCD testing and functional verification & Periodic inspection, sampling and condition reporting (EICR)
Sit a full-length timed mock covering the four highest-weighted testing and reporting domains and mark it against the answers
Re-study every question missed, writing the correct reasoning in your own words rather than copying the answer
Re-perform, on the rig or in simulation, the two test procedures you scored lowest on in the mock
Build a personal one-page formula and limits sheet for Zs, RCD times and insulation resistance values and check it against source text
Your checkpoint
A marked mock paper scoring at least 80 percent, plus a written remediation log listing every missed question with the corrected reasoning
Statutory and non-statutory requirements, BS 7671 and associated guidance & Safe isolation, preparation for inspection and testing, safe working practices & Certification, schedules and reporting documentation & Interpretation of test results, defect classification and client communication
Sit a second full-length timed mock under exam conditions and compare the score profile against week 7
Rehearse the safe isolation sequence and the inspection-before-test sequence from memory, out loud, without prompts
Complete two full certificates from blank templates within a strict time limit
List your five weakest remaining topics and write a one-paragraph accurate summary of each from memory
Your checkpoint
A final mock scoring at least 85 percent and two timed, fully completed certificates produced without reference material
Milestones
Week 2: You can state the legal and BS 7671 basis for each test you perform, and you have produced a signed-off safe isolation record and a complete schedule of inspections for a sample installation
Week 4: You have produced complete continuity, insulation resistance, loop impedance and RCD result sheets, and you can justify every measured value against a calculated expectation without notes
Week 6: You have issued a complete condition report with correctly coded observations and a full installation certificate, and a mock paper on domains 1 to 10 scores at least 75 percent
Week 8: Two timed full-length mocks both score at least 85 percent, and you can complete an installation certificate and a condition report from blank templates within the exam time allowance