AZ ROC A (KA) Dual Engineering flashcards
AZ ROC A (KA) Dual Engineering · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Arizona contractor license classifications
- The ROC issues A (general engineering), B (general building), and C (specialty) licenses. A dual A/B license permits both engineering and building scope on a single license.
- Mechanics' lien recording deadline
- In Arizona, a mechanics' lien must be recorded within 120 days after completion of the project. Parties without a direct contract with the owner must first serve a 20-day preliminary notice.
- Arizona retainage limit
- On private construction projects in Arizona, retainage is capped at 10 percent of amounts due and must be released within 60 days after substantial completion of the work.
- Swell factor
- Swell factor equals (loose volume minus bank volume) divided by bank volume. It converts bank cubic yards of undisturbed soil to the larger loose volume after excavation.
- OSHA soil types
- Type A soil has unconfined compressive strength of 1.5 tsf or more; Type B is 0.5 to 1.5 tsf; Type C is less than 0.5 tsf or is granular, submerged, or previously disturbed.
- Trench spoil setback
- Excavated spoil must be placed at least 2 feet back from the edge of a trench to avoid surcharge loading that can cause wall collapse and to keep material from falling in.
- Modified Proctor compaction
- ASTM D1557 test that determines maximum dry density and optimum moisture content. Most structural fills specify 95 percent compaction relative to modified Proctor maximum density.
- Water-cement ratio
- The ratio of water weight to cement weight in a concrete mix. Lower ratios yield higher strength and durability; typical structural concrete uses 0.40 to 0.50.
- ACI minimum concrete cover
- Required cover over reinforcement: 3 inches when cast against earth, 1.5 inches for beams and slabs exposed to weather, and 0.75 inch for interior slabs not exposed.
- Concrete cylinder test
- Standard 6-inch by 12-inch cylinder cured and tested in compression at 28 days. The average of two cylinders must meet or exceed the specified compressive strength f'c.
- Concrete curing duration
- Moist curing for at least 7 days is required for Type I cement concrete to reach design strength. Cold weather below 40°F requires insulated forms or heated enclosures.
- Ohm's law and power
- V equals I times R; power P equals V times I, which also equals I squared times R. These formulas size conductors and calculate electrical loads on branch circuits.
- Three-phase power formula
- Kilowatts equal the square root of 3 times line voltage times line current times power factor, divided by 1000. Line-to-line voltage is used in this calculation.
- Voltage drop limits
- Branch circuit voltage drop should not exceed 3 percent of the source voltage. Combined feeder plus branch circuit drop should not exceed 5 percent total.
- Refrigeration ton
- One ton of refrigeration equals 12,000 BTU per hour of heat removal. Airflow rule of thumb for comfort cooling is about 400 CFM per ton of capacity.
- GFCI and AFCI requirements
- GFCI protection is required in bathrooms, kitchens, outdoors, and within 6 feet of sinks. AFCI protection is required in dwelling bedrooms and living areas per NEC.
- Horizontal drain slope
- Drain pipe 2½ inches and smaller must slope 1/4 inch per foot. Pipe 3 inches and larger may slope 1/8 inch per foot to maintain self-cleaning velocity.
- Water closet fixture units
- A private water closet counts as 3 fixture units and a lavatory as 1 fixture unit. Total fixture units determine required drain and water supply pipe sizes.
- Vent stack roof termination
- A vent stack must extend at least 6 inches above the roof surface and at least 12 inches above any window or opening located within 10 feet of the vent.
- Backflow air gap
- An air gap is the only backflow protection acceptable against a health hazard. Reduced-pressure zone (RPZ) assemblies protect against cross-connections to potable water.
- Bolt hole diameter
- Standard holes are 1/16 inch larger than the bolt diameter for bolts up to 1 inch, and 1/8 inch larger for bolts over 1 inch, per AISC requirements.
- Fillet weld throat
- The effective throat of a fillet weld equals 0.707 times the weld size. Capacity equals throat times weld length times allowable shear stress.
- E70XX electrode strength
- In the AWS electrode classification, the first two digits give minimum tensile strength in ksi. E70 electrodes have a minimum tensile strength of 70,000 psi.
- Steel density
- Structural steel weighs 490 pounds per cubic foot. W-shape designations give weight per linear foot, so a W14×90 weighs 90 pounds per foot of length.
- CSI MasterFormat divisions
- MasterFormat organizes specifications into 50 divisions. Division 01 is General Requirements, Division 02 is Existing Conditions, and Division 03 is Concrete.
- Document precedence order
- Written specifications govern over drawings, large-scale drawings govern over small-scale, and written dimensions govern over measurements obtained by scaling a drawing.
- Critical path method
- The critical path is the longest-duration sequence of dependent activities through the network. Any delay on the critical path delays the project completion date.
- Estimate contingency
- A contingency allowance of 5 to 10 percent is typical for design-bid-build estimates. Conceptual budgets use 10 to 20 percent for undefined scope.
- OSHA fall protection threshold
- Construction workers must be protected from falls at 6 feet or more above a lower level using guardrails, safety nets, or a personal fall arrest system.
- Scaffold rail dimensions
- Scaffold top rails are installed between 38 and 45 inches above the platform. Midrails are about 21 inches high and toe boards are 3½ inches tall.
- SWPPP requirement
- A Stormwater Pollution Prevention Plan under the NPDES Construction General Permit is required for construction sites that disturb 1 acre or more of soil.
- Hazard Communication program
- Employers must maintain a written HazCom program, keep safety data sheets accessible on site, and train every employee exposed to hazardous chemicals.