USCG OIM flashcards
USCG OIM · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- BMEP formula
- Brake mean effective pressure = (brake power × 60) / (stroke × bore area × rpm × number of cylinders). It compares engine loading independent of size and speed.
- Mechanical efficiency
- The ratio of brake power to indicated power, expressed as a percentage. It falls when friction or pumping losses rise, indicating bearing, piston or valve problems.
- Specific fuel consumption
- Fuel mass flow per unit brake power, usually g/kWh. A slowly rising trend at constant load signals fouling, worn injectors, or restricted combustion air.
- Turbocharger surging
- Unstable airflow causing rapid pressure pulsations, often on rapid load increase or fouled air passages. Prevent by gradual loading and cleaning air cooler and scavenge spaces.
- Cylinder oil versus system oil
- Two-stroke crosshead engines use total-loss cylinder oil for liners and a separate circulating system oil for bearings. Four-stroke trunk engines use one sump oil for both.
- Boiler purge before ignition
- Forced-air purge of the furnace before lighting off clears unburnt fuel. Skipping purge risks a furnace explosion; flame failure trip must be tested first.
- Auxiliary boiler low-water trip
- Cuts the burner when drum level falls below a safe limit to protect tubes from overheating. It must be tested and proved before lighting off.
- Three-phase power formula
- Active power P = √3 × line voltage × line current × power factor. Apparent power S = √3 × V × I, and reactive power Q = √3 × V × I × sin φ.
- Generator paralleling conditions
- Before closing the breaker, voltage, frequency, phase sequence and phase angle must match the busbar. kW shares by governor droop; kVAr shares by excitation adjustment.
- Governor droop and load sharing
- Droop is the frequency fall from no load to full load. A generator with lower droop takes a larger share of kW load for the same frequency deviation.
- Insulation resistance minimum
- For a 440 V system, about 1 MΩ at 500 V DC test is the usual minimum. Lower readings indicate moisture, dirt, or cable damage and require investigation.
- Preferential trip
- An interlock that sheds non-essential loads such as HVAC or galley when a generator overloads or one generator is lost, protecting the remaining generator.
- 4-20 mA live-zero loop
- Analogue signal where 4 mA is zero and 20 mA full scale. A reading of 0 mA indicates a broken wire or failed transmitter, allowing fault detection.
- Insulated system earth fault
- On an IT distribution system a single earth fault does not trip but must be located and cleared. An insulation monitoring device alarms and indicates the faulted circuit.
- Lead-acid float voltage
- Float charge for lead-acid cells is about 2.25 V per cell; equalising charge about 2.4 V per cell. Overcharging causes gassing and water loss.
- PLC analogue input scaling
- A 4-20 mA signal is scaled in the PLC to engineering units, for example 4 mA = 0 bar and 20 mA = 10 bar. Verify scaling before trusting displayed values.
- Planned maintenance intervals
- Intervals are set by running hours, calendar time, or condition monitoring such as vibration and oil analysis. Deferral requires chief engineer authorisation and record.
- Oil analysis wear metals
- Iron indicates general wear, chromium rings or liners, sodium coolant ingress, and copper bearing wear. Rising trends trigger inspection before failure.
- ISO 10816 vibration zones
- Zones A to D classify machinery vibration severity. Zone C or D readings, or a rising trend, require investigation before continued running.
- Enclosed space entry test
- Test atmosphere before entry: oxygen about 20.9%, LEL below 1%, and H2S and CO within limits. Requires permit, ventilation and a standby man outside.
- Lockout tagout
- Isolate the energy source, prove dead, apply lock and tag, then test the isolation. The person working applies their own lock before starting work.
- Hydrostatic test pressure
- Piping is usually tested at 1.5 times design pressure hydrostatically unless the applicable code specifies otherwise. Relief valves are set and sealed to design pressure.
- Bearing clearance measurement
- Measured by bridge gauge or lead wire and compared with the maker's wear limit. Exceeding the limit requires renewal before reassembly.
- Torque tightening practice
- Follow the manual's tightening sequence and torque values using a calibrated torque wrench. Record the calibration date and the values applied.
- Hot work permit
- Requires gas-free certificate, removal of combustibles, fire watch, and checks of adjacent spaces before any welding, cutting or grinding is permitted.
- Oily water separator limit
- MARPOL Annex I allows overboard discharge only through a 15 ppm oily water separator with monitoring. All transfers and disposals are recorded in the oil record book.
- MARPOL Annex VI sulphur limits
- Global sulphur limit is 0.50% m/m and 0.10% m/m in emission control areas. Bunker delivery notes must be retained for three years.
- Emergency generator start time
- SOLAS requires the emergency generator to start and take load automatically within 45 seconds of a blackout, supplying emergency lighting, steering and radio.
- STCW watch handover
- The engineer on watch must be fit for duty and brief the relief on machinery status, abnormal readings and standing orders before handing over.
- Fixed CO2 release precautions
- Before release, evacuate the space, close boundaries, account for all persons, and confirm the fire is not re-ignitable by personnel. Release is a last resort.
- Garbage record book
- MARPOL Annex V requires recording discharges and incinerations. Plastics must never be discharged to sea; retention is typically two years.
- Oil record book entries
- Entries are made without delay for every transfer, disposal or discharge. Falsification is a criminal offence and the chief engineer is accountable.