WV General Contractor study plan
WV General Contractor · Give each week a clear focus.
8 weeks · About 6 hours per week
Business and Project Management & Estimating and Bidding
Map the four exam domains and weight each by percentage to build a personal priority list
Define the key terms of project delivery methods (design-bid-build, design-build, construction management) in your own words
List the components of a complete bid package and explain the purpose of each
Draft a one-page glossary of business and estimating vocabulary you must own
Your checkpoint
A one-page domain-weighting chart plus a 25-term glossary covering business and estimating vocabulary
Estimating and Bidding
Compute quantity takeoffs for concrete, framing, and finishes from written dimensions
Apply waste factors and unit conversions to convert takeoffs into order quantities
Build a labor-and-material cost estimate for a small residential scope using a stated productivity rate
Distinguish direct costs, indirect costs, overhead, and markup in a written estimate
Your checkpoint
A complete worked estimate for a single-room renovation showing takeoff, waste, labor, overhead, and markup
Estimating and Bidding & Business and Project Management
Calculate markup, gross margin, and break-even on a bid using provided numbers
Explain the difference between a bid bond, performance bond, and payment bond and when each applies
Identify the common causes of bid errors and describe a pre-submission checklist to prevent them
Compare lump-sum, unit-price, and cost-plus contract structures in writing
Your checkpoint
A bid-review checklist plus three solved pricing problems (markup, margin, break-even)
Business and Project Management
Sequence a sample project schedule and identify the critical path from a written task list
Describe how change orders, submittals, and RFIs flow through a project
Outline the records a contractor must keep for payment applications and lien protection
Explain the roles of owner, architect/engineer, general contractor, and subcontractor in a written summary
Your checkpoint
A sample 20-task schedule with critical path identified and a one-page change-order/RFI process map
Construction Methods and Materials
Match structural systems (wood frame, steel, concrete, masonry) to their typical applications and limits
Describe proper installation sequence for foundations, framing, roofing, and exterior finishes
Identify the correct material or assembly for a given written scenario involving moisture, load, or fire separation
Explain how codes and manufacturer instructions govern material selection
Your checkpoint
A materials-and-methods reference sheet covering five assemblies with installation sequence and common failure points
Construction Methods and Materials & Safety and Regulatory Compliance
Interpret written code requirements for egress, stairs, guards, and fire separation
Select the correct PPE and fall-protection method for described site conditions
Identify excavation, scaffolding, and electrical hazard controls from written scenarios
Describe the purpose of permits, inspections, and the contractor licensing requirements
Your checkpoint
A safety-and-code quick-reference card covering fall protection, egress, and inspection triggers
Safety and Regulatory Compliance & Business and Project Management
Explain OSHA employer duties for hazard communication, recordkeeping, and training
Outline a site-specific safety plan for a small commercial job in writing
Describe environmental controls for erosion, dust, and waste on a described site
Summarize West Virginia contractor licensing, lien, and contract requirements at a high level
Your checkpoint
A one-page site-specific safety plan plus a regulatory compliance checklist
Business and Project Management & Estimating and Bidding & Construction Methods and Materials & Safety and Regulatory Compliance
Complete a full-length timed practice exam under test conditions
Review every missed item and write the rule or concept behind it
Re-drill the two weakest domains with focused problem sets
Confirm exam-day logistics, allowed materials, and scheduling
Your checkpoint
A scored practice exam with a written error log and a final two-page summary of weak-area rules
Milestones
Week 2: Produce a full estimate from takeoff to final price without referring to notes
Week 4: Score at least 70% on a self-made quiz covering business and estimating fundamentals
Week 6: Explain five construction assemblies and their code-driven safety requirements from memory
Week 8: Score at least 75% on a timed full-length practice exam and show a completed error log