AACE CEP Certified Estimating Professional flashcards
AACE CEP Certified Estimating Professional · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Estimate Accuracy
- The degree to which an estimate's predicted cost matches actual cost. Accuracy ranges narrow as project definition improves, from wide conceptual ranges to narrow definitive ranges.
- Estimate Precision
- The level of detail and rounding in an estimate. High precision does not guarantee accuracy; a very detailed estimate can still be far from actual cost.
- AACE Estimate Class 5
- The least mature estimate class, typically 0-2% project definition, using order-of-magnitude methods with the widest accuracy range for concept screening.
- AACE Estimate Class 1
- The most mature estimate class, typically 65-100% project definition, using detailed deterministic methods with the narrowest accuracy range for final control.
- Basis of Estimate
- Document recording scope, methodology, assumptions, exclusions, pricing basis, accuracy range, and risks. It makes the estimate auditable and interpretable by reviewers.
- Direct versus Indirect Cost
- Direct costs attach to specific work items (e.g., pipe, steel); indirect costs are shared across the project (e.g., supervision, temporary facilities, home office support).
- Six-Tenths Rule
- Capacity scaling formula C2 = C1 × (Q2/Q1)^n with exponent n near 0.6. It estimates cost of a new capacity from a known similar facility.
- Lang Factor
- A multiplier applied to delivered equipment cost to estimate total plant cost. Factors differ by plant type (solids, fluids, mixed) and include installation and indirects.
- Parametric Estimating
- Method using statistical relationships between cost and measurable drivers such as cost per kW or per square meter. Reliability depends on calibrated historical data.
- Bottom-Up Estimating
- Deterministic method building total cost from detailed quantity takeoff times unit rates, rolled up through the WBS. Requires mature scope definition.
- Factored Estimating
- Technique applying multipliers to a known base cost, such as piping as a ratio of equipment cost. Accuracy is intermediate between conceptual and detailed methods.
- Unit-Rate Estimating
- Method pricing defined quantities at rates composed of labor, material, equipment, and indirect components. Requires quantities and applicable rates.
- Monte Carlo Simulation
- Probabilistic technique sampling cost distributions repeatedly to produce a total cost probability distribution, supporting contingency sizing at chosen confidence levels.
- Cost versus Price Analysis
- Cost analysis examines reasonableness of individual cost elements; price analysis judges total price reasonableness without examining elements, often via competitive comparison.
- Learning Curve
- Model where each doubling of cumulative production reduces unit labor hours by a constant percentage (e.g., 80% curve). Y = aX^b with b = log(rate)/log 2.
- Cost Index Escalation
- Adjusting historical cost to a new time base using C2 = C1 × (I2/I1), where indices such as CEPCI or ENR reflect price change over time.
- Location Factor
- Multiplier adjusting cost from a base location to another, reflecting differences in labor rates, material costs, and productivity across regions.
- Should-Cost Analysis
- Cost analysis technique building an independent model of what a product or service should cost from its elements, then comparing to the proposed price.
- Estimate Plan
- Document defining estimate class, method, WBS, coding, schedule basis, review cycle, and roles before estimating begins, ensuring consistent execution.
- Quantity Takeoff
- Process converting design documents into measurable quantities (e.g., meters of pipe, cubic meters of concrete) that are then priced with unit rates.
- Estimate Reconciliation
- Comparison of successive estimate versions documenting the causes of change between them, separating scope, quantity, rate, and methodology effects.
- Estimate Coding Structure
- Use of WBS, cost breakdown structure, and cost codes to enable roll-up, benchmarking, and integration of the estimate with cost control and accounting.
- Estimate Review
- Structured validation of an estimate's completeness, methodology, and reasonableness - including check estimates and peer or gate reviews - before approval.
- Contingency
- Allowance in the estimate for known-unknowns: identified risks and estimating uncertainty within defined scope. It excludes scope changes and unforeseeable events.
- Management Reserve
- Allowance for unknown-unknowns and scope changes, typically held outside the project estimate and controlled above the project manager.
- Expected Value
- Risk metric computed as probability times impact. Summing expected values of identified risks supports risk-adjusted estimating.
- P80 Cost Estimate
- Cost value at the 80th percentile of a simulated distribution, meaning an 80% probability the actual cost will not exceed it. Commonly used for contingency targets.
- Escalation
- Anticipated price change over time due to inflation or market conditions, distinct from contingency and currency effects. Computed via rates or published indices.
- Risk Register
- Log of identified risks with probability, impact, owners, and response strategies. It feeds risk-adjusted estimating and contingency sizing.
- Estimate Version Control
- Document management practice ensuring the current approved estimate is traceable, auditable, and distinguishable from superseded versions.
- Benchmarking
- Comparing estimate metrics such as cost per unit capacity or factor ratios against historical projects to validate reasonableness and identify outliers.
- Historical Cost Database
- Repository of normalized actual costs used to calibrate future estimates, parametric models, and factors. Its quality directly drives estimate accuracy.