AACE CEP Certified Estimating Professional · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Estimating Fundamentals and Concepts

  • Define each cost-estimating life-cycle phase and classify real project activities into the correct phase

  • Distinguish cost versus price and identify which estimating outputs feed each

  • Build a one-page glossary of 25 core estimating terms with your own examples

  • Explain the role of the estimator within project controls and how estimates feed scheduling and cost control

Your checkpoint

A one-page estimating life-cycle map plus a 25-term personal glossary with original examples

Week 2

Estimating Fundamentals and Concepts & Estimating Methods and Techniques

  • Compare bottom-up, analogous, parametric, and factor-based methods and state when each is appropriate

  • Apply a parametric cost-estimating relationship to a worked example and check its sensitivity to the driving variable

  • Practice unit-rate and quantity takeoff logic on a small scoped example

  • Diagnose common causes of estimate inaccuracy and map each to a mitigating method

Your checkpoint

A method-selection decision table with three worked mini-examples (one per major method)

Week 3

Estimating Methods and Techniques

  • Construct a work breakdown structure for a sample project down to a work-package level suitable for estimating

  • Build a bottom-up estimate from the WBS and reconcile it against an analogous top-down check

  • Identify and justify basis-of-estimate assumptions for each work package

  • Convert a labor-hour estimate into a fully burdened cost using stated rates and productivity factors

Your checkpoint

A WBS-linked bottom-up estimate sheet reconciled against a top-down sanity check

Week 4

Cost and Price Analysis

  • Distinguish cost analysis from price analysis and select the right technique for a given procurement scenario

  • Perform a should-cost buildup and compare it to a quoted price to isolate the variance drivers

  • Compute and interpret simple cost indices and unit-cost comparisons

  • Identify unbalanced, front-loaded, or otherwise problematic pricing structures in a bid comparison

Your checkpoint

A cost-versus-price analysis worksheet showing should-cost buildup, variance drivers, and a bid-comparison conclusion

Week 5

Cost and Price Analysis & Estimating Processes and Deliverables

  • Assemble a complete estimate package: basis of estimate, assumptions, exclusions, and supporting detail

  • Write basis-of-estimate narrative sections that a reviewer can audit without asking follow-up questions

  • Design a review checklist that catches scope omissions, unit errors, and missing escalation

  • Map estimate deliverables to the stage-gate or decision they support

Your checkpoint

A full basis-of-estimate document (assumptions, exclusions, methodology, review checklist) for the week-3 estimate

Week 6

Risk, Contingency, and Escalation

  • Distinguish contingency, management reserve, and escalation and assign each to the correct owner

  • Apply a range-estimating or three-point technique to derive a contingency allowance for a sample estimate

  • Build an escalation calculation using stated indices and time-phasing assumptions

  • Run a qualitative risk register that ties identified risks to quantified cost impacts

  • Explain how estimate accuracy ranges narrow across project phases

Your checkpoint

A risk-and-contingency register with quantified contingency and escalation applied to the sample estimate

Week 7

Risk, Contingency, and Escalation & Estimating Management and Integration

  • Design a change-control process that keeps the estimate baseline current and traceable

  • Define estimate review and validation checkpoints and who signs off at each

  • Practice a peer review of an estimate and document findings against a standard checklist

  • Identify integration points between estimating, scheduling, and cost engineering and describe the data each needs from the others

Your checkpoint

A one-page estimate management and review plan covering change control, sign-offs, and integration data flows

Week 8

Estimating Fundamentals and Concepts & Estimating Methods and Techniques & Cost and Price Analysis & Estimating Processes and Deliverables & Risk, Contingency, and Escalation & Estimating Management and Integration

  • Complete a timed full-length practice set and score each domain separately

  • Re-teach your two weakest domains from your own notes without referring to source material

  • Consolidate all deliverables into an indexed study binder for final review

  • Build a 30-minute pre-exam review sheet of formulas, definitions, and decision rules

Your checkpoint

A scored practice-exam report by domain plus a one-page pre-exam review sheet

Milestones

Week 2: Can explain and select among the four major estimating methods with a worked example for each, scoring at least 80% on a self-made method-selection quiz

Week 4: Can perform a should-cost buildup and explain the price variance without notes; completed estimate reconciles within a stated tolerance of the top-down check

Week 6: Contingency and escalation calculations on the sample estimate are reproducible from the written assumptions alone

Week 8: Practice-exam score at or above 75% overall with no domain below 65%, and all six deliverables present in the indexed binder