AACE PSP key terms
AACE PSP · Get comfortable with the vocabulary.
- Work Breakdown Structure (WBS)
- Related: Activity, Control Account, Schedule Baseline
A hierarchical decomposition of the total scope of work into manageable, deliverable-oriented components. It provides the framework for defining activities, assigning responsibility, and rolling up cost and schedule data for reporting.
- Activity
- Related: Duration, Logic Relationship, Work Breakdown Structure (WBS)
A distinct, definable unit of work performed during a project that consumes time and usually resources. Activities are the building blocks of a schedule network and are assigned durations, logic ties, and progress status.
- Duration
- Related: Activity, Calendar, Critical Path Method (CPM)
The number of work periods, expressed in calendar or working units, required to complete an activity or project phase. Duration differs from elapsed time when non-working periods such as weekends or holidays intervene.
- Logic Relationship
- Related: Lag, Lead, Network Diagram
A dependency linking two activities that constrains when the successor may start or finish relative to the predecessor. Common types include finish-to-start, start-to-start, finish-to-finish, and start-to-finish, each optionally carrying a lag.
- Lag
- Related: Lead, Logic Relationship, Duration
A deliberate, positive time interval inserted between the finish or start of a predecessor and the start or finish of its successor. Lag models waiting periods such as cure time or approval delays within the logic network.
- Lead
- Related: Lag, Logic Relationship, Schedule Compression
A negative time interval applied to a logic relationship that allows a successor to begin or finish before its predecessor reaches the linked milestone. Lead accelerates work but can create unintended schedule compression risk.
- Network Diagram
- Related: Logic Relationship, Critical Path Method (CPM), Float
A graphical representation of activities and their logical relationships, typically drawn as nodes connected by arrows. It forms the model from which forward and backward passes calculate early and late dates.
- Critical Path Method (CPM)
- Related: Forward Pass, Backward Pass, Total Float
A deterministic scheduling technique that calculates early and late dates through forward and backward passes, identifying the longest path through the network. Activities on that path have zero or minimum total float and drive project completion.
- Forward Pass
- Related: Backward Pass, Early Start, Critical Path Method (CPM)
A calculation that moves from project start to finish, assigning each activity its earliest possible start and finish based on predecessor logic and durations. It establishes the shortest achievable project duration given the network.
- Backward Pass
- Related: Forward Pass, Late Finish, Total Float
A calculation that moves from project finish back to start, assigning each activity its latest permissible start and finish without delaying the project. Comparing late dates to early dates yields total float.
- Total Float
- Related: Free Float, Critical Path Method (CPM), Float Consumption
The amount of time an activity can be delayed from its early start without delaying the project finish date. Total float is shared along a path and is computed as late finish minus early finish or late start minus early start.
- Free Float
- Related: Total Float, Logic Relationship, Float Consumption
The amount of time an activity can be delayed without delaying the early start of any immediate successor. Unlike total float, free float belongs to a single activity and is not shared with downstream work.
- Schedule Baseline
- Related: Performance Measurement Baseline, Schedule Variance, Change Control
The approved, time-fixed version of the project schedule against which actual progress and performance are measured. Changes to it require formal change control and a reissued baseline for variance analysis.
- Resource Leveling
- Related: Resource Smoothing, Critical Path Method (CPM), Total Float
A scheduling technique that adjusts activity start and finish dates to resolve resource over-allocation or to smooth demand within imposed limits. Leveling may extend the project duration and alter the critical path.
- Resource Smoothing
- Related: Resource Leveling, Total Float, Float Consumption
A technique that shifts activities within their available float to reduce peaks and valleys in resource demand without changing the project finish date. Unlike leveling, smoothing never extends the critical path.
- Schedule Compression
- Related: Crashing, Fast Tracking, Lead
A set of techniques applied to shorten the schedule without reducing scope, chiefly crashing and fast tracking. Compression typically raises cost, risk, or both and must be evaluated against project objectives.
- Crashing
- Related: Schedule Compression, Fast Tracking, Critical Path Method (CPM)
A schedule compression technique that shortens duration by adding resources or working overtime, usually at increased cost. It targets critical-path activities where the cost per unit of time saved is lowest.
- Fast Tracking
- Related: Schedule Compression, Crashing, Lag
A schedule compression technique that overlaps activities normally performed in sequence, often by converting finish-to-start logic to start-to-start with lag. It shortens duration but increases rework and coordination risk.
- Calendar
- Related: Duration, Activity, Schedule Maintenance
A defined pattern of working and non-working periods that governs how durations convert into dates. Project, resource, and activity calendars interact, and mismatches between them are a frequent source of schedule error.
- Milestone
- Related: Activity, Schedule Baseline, Look-Ahead Schedule
A significant point or event in the project with zero duration, used to mark completion of a phase, delivery of a deliverable, or a contractual obligation. Milestones carry no work but anchor reporting and payment triggers.
- Schedule Maintenance
- Related: Percent Complete, Remaining Duration, Schedule Baseline
The routine process of updating the schedule model with actual dates, remaining durations, and revised logic to keep it a valid representation of the plan. It includes status updates, data checks, and reissuing controlled versions.
- Percent Complete
- Related: Remaining Duration, Earned Value Management (EVM), Schedule Variance
A measure of work accomplished on an activity or project, expressed as a proportion of the total. It may be based on duration, physical units, or cost and must be paired with remaining duration for accurate forecasting.
- Remaining Duration
- Related: Percent Complete, Schedule Maintenance, Forecast Finish Date
The estimated work periods still needed to finish an activity from the status date, independent of time already spent. Correct remaining durations, not percent complete alone, drive reliable forecast dates in an updated schedule.
- Data Date
- Related: Schedule Maintenance, Percent Complete, Out-of-Sequence Progress
The point in time at which schedule progress is recorded and the schedule is updated, also called the status date. Work after the data date is forecast; work before it is historical and should reflect actuals.
- Out-of-Sequence Progress
- Related: Logic Relationship, Schedule Maintenance, Data Date
A condition where actual execution violates the planned logic, such as a successor starting before its predecessor finishes. It can distort float and critical path calculations unless the logic is corrected or progress is properly retained.
- Earned Value Management (EVM)
- Related: Schedule Variance, Schedule Performance Index (SPI), Percent Complete
An integrated performance method comparing planned value, earned value, and actual cost to measure scope, schedule, and cost performance. Schedule performance indicators derived from EVM complement network-based schedule analysis.
- Schedule Variance
- Related: Earned Value Management (EVM), Schedule Performance Index (SPI), Forecast Finish Date
A performance measure of schedule achievement, typically earned value minus planned value in cost terms. A negative value indicates work is behind plan; it signals schedule slippage but not necessarily delay to the finish date.
- Schedule Performance Index (SPI)
- Related: Schedule Variance, Earned Value Management (EVM), Forecast Finish Date
The ratio of earned value to planned value, indicating how efficiently schedule work is being accomplished. Values below one signal slower-than-planned progress; SPI trends support forecasting of completion dates.
- Forecast Finish Date
- Related: Remaining Duration, Schedule Baseline, Schedule Variance
The projected completion date of an activity or the project derived from current progress, remaining durations, and logic. It is compared with the baseline finish to quantify expected delay and support recovery planning.
- Look-Ahead Schedule
- Related: Milestone, Schedule Maintenance, Activity
A short-interval, rolling extract of upcoming work, often covering two to six weeks, used to coordinate crews and identify constraints. It translates the master schedule into actionable near-term commitments for field execution.
- Change Control
- Related: Schedule Baseline, Performance Measurement Baseline, Schedule Maintenance
A formal process for submitting, evaluating, approving, and documenting modifications to the schedule baseline or project plan. Approved changes are incorporated into a revised baseline so that performance comparisons remain meaningful.
- Performance Measurement Baseline
- Related: Schedule Baseline, Earned Value Management (EVM), Change Control
The integrated, time-phased scope, schedule, and cost baseline against which project execution is measured. It comprises the schedule baseline plus budgeted cost and is the reference for earned value analysis.
- Float Consumption
- Related: Total Float, Free Float, Schedule Maintenance
The reduction of available total or free float as activities slip or are resequenced during updates. Tracking float consumption reveals eroding schedule flexibility and warns of emerging criticality before dates actually slip.
- Critical Path
- Related: Critical Path Method (CPM), Total Float, Near-Critical Path
The longest continuous chain of dependent activities through the network, which determines the shortest possible project duration. Any delay on this path delays project completion unless float or logic is adjusted.
- Near-Critical Path
- Related: Critical Path, Total Float, Float Consumption
A path whose total float is very small, often defined by a threshold such as less than a reporting period. Monitoring near-critical paths provides early warning of activities likely to become critical after minor slippage.
- Schedule Risk Analysis
- Related: Critical Path, Total Float, Forecast Finish Date
A quantitative method, often using Monte Carlo simulation, that models uncertainty in durations and logic to produce probabilistic completion dates. It identifies activities with high sensitivity and informs contingency reserves.
- Control Account
- Related: Work Breakdown Structure (WBS), Performance Measurement Baseline, Earned Value Management (EVM)
A management point within the WBS where scope, schedule, and cost are integrated and performance is measured. Control accounts align schedule activities with budgets and are the building blocks of earned value reporting.