Lift Station Wet Well Level Control Failure
You are the operator of a lift station with two 50-hp pumps (one duty, one standby) and a wet well with a 10-foot diameter. The pumps are controlled by float switches: lead pump on at 6 feet, lag pump on at 7 feet, both off at 3 feet. The station has a high-level alarm at 8 feet. On your rounds, you notice the wet well level is at 7.5 feet and rising, and both pumps are running. The lead pump is drawing normal amps, but the lag pump is drawing low amps and the discharge pressure is lower than normal. The alarm has not yet triggered. The station serves a hospital and a nursing home.
1. What is your immediate course of action?
Read the worked answer
- Safety: Ensure you follow lockout/tagout if you need to work on the pump. 2. Assess: The lag pump is running but drawing low amps and low discharge pressure, indicating it may be air-bound, cavitating, or have a closed valve/blockage. The lead pump is running normally but cannot keep up alone. 3. Immediate actions: Attempt to prime the lag pump or check for closed valves. If the lag pump cannot be restored quickly, call for emergency assistance (vacuum truck, portable pump) to prevent overflow. Notify the hospital and nursing home of potential service interruption. 4. Monitor: Continuously monitor the wet well level. If it reaches 8 feet, the high-level alarm will trigger; be prepared to implement emergency overflow procedures. 5. Investigate: After stabilizing, diagnose the lag pump issue (e.g., clogged impeller, worn wear rings, air leak in suction). 6. Document: Record all actions and notifications.
2. What are the potential consequences of a sewage overflow at this location, and how would you mitigate them?
Read the worked answer
Consequences: Environmental contamination, public health risk (especially for hospital/nursing home patients), regulatory fines, and reputational damage. Mitigation: (a) Prevent overflow by bringing in emergency pumping capacity; (b) If overflow occurs, contain and disinfect, notify regulators and affected parties; (c) Implement a bypass pumping plan; (d) After the event, review the station's alarm and response procedures, and consider adding redundant level sensing or remote monitoring.