ABC Wastewater Collection Class II study materials
ABC Wastewater Collection Class II study resources

ABC Wastewater Collection Class II study plan

ABC Wastewater Collection Class II · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Collection System Operations and Maintenance & Safety and Confined Space Entry

  • List the major components of a gravity collection system (mains, manholes, service laterals, cleanouts) and state the function of each from memory

  • Describe the standard sequence of confined-space entry (permit, atmospheric testing, ventilation, attendant, retrieval) without notes

  • Identify the four atmospheric hazards tested before entry and state the order in which they are tested

  • Match each of the four hazard categories (oxygen deficiency, flammable gas, toxic gas, engulfment) to a control measure

Your checkpoint

A one-page handwritten system-component diagram plus a completed sample confined-space entry permit with every field explained

Week 2

Collection System Operations and Maintenance & Sewers, Lift Stations, and Pumping Equipment

  • Explain the purpose and operating principle of each lift station component: wet well, dry well, pumps, check valve, isolation valve, level controls, and odor control

  • Compare centrifugal, positive-displacement, and submersible pump applications in collection systems

  • Outline a preventive maintenance schedule for lift station pumps, valves, and controls by interval

  • Describe the steps to respond to a high-level alarm or pump failure at a lift station

Your checkpoint

A lift station PM checklist covering at least 12 items with frequency and acceptance criteria for each

Week 3

Collection System Operations and Maintenance & Sewers, Lift Stations, and Pumping Equipment & Wastewater Flow, Hydraulics, and Capacity

  • Calculate flow velocity in a gravity sewer given slope, pipe diameter, and roughness using the Manning equation

  • Convert between flow rates (gpm, mgd, cfs) and compute detention time in a wet well

  • Explain how infiltration and inflow affect capacity and describe two methods to quantify each

  • Describe common gravity sewer defects (roots, grease, offset joints, sags, cracks) and the O&M response to each

  • Distinguish between cleaning methods (rodding, jetting, bucket machines) and state when each is appropriate

Your checkpoint

A worked problem set of 10 hydraulic calculations (velocity, flow conversion, wet-well detention time) with correct units shown

Week 4

Safety and Confined Space Entry & Wastewater Flow, Hydraulics, and Capacity

  • Perform and document a complete hazard assessment for a manhole entry scenario, including traffic control and lockout/tagout

  • Explain the role and responsibilities of the entrant, attendant, and entry supervisor

  • Calculate the volume of a wet well and the pump-out time at a given pumping rate

  • Interpret a pump curve to identify shutoff head, operating point, and runout

Your checkpoint

A written hazard assessment and rescue plan for a hypothetical 20-foot-deep manhole entry, including atmospheric test thresholds

Week 5

Inspection, Testing, and Rehabilitation & Regulations, Permits, and Reporting

  • Describe the purpose and limitations of CCTV inspection and list the defect coding categories used in reporting

  • Explain smoke testing and dye testing procedures and what each is designed to detect

  • Compare rehabilitation methods (cured-in-place pipe, pipe bursting, slip lining, point repair) by application and limitation

  • Identify the main permit and reporting obligations for a collection system (discharge permits, SSO notification, bypass reporting) and the timelines involved

  • Describe the components of a sanitary sewer overflow response and reporting sequence

Your checkpoint

A rehabilitation method comparison table (at least four methods, columns for application, limitation, and typical use) plus a one-page SSO reporting timeline

Week 6

Regulations, Permits, and Reporting & Math and Calculations & Pretreatment, Grease, and Odor Control

  • Solve unit-conversion problems involving flow, volume, concentration, and loading (lbs/day, mg/L, mgd)

  • Calculate grease interceptor sizing or detention time given dimensions and flow

  • Explain the sources of grease and odor in collection systems and describe two control strategies for each

  • Describe how industrial pretreatment requirements affect collection system operations and sampling

  • Compute population equivalent loading and average daily flow from given data

Your checkpoint

A 15-problem calculation worksheet covering loading, detention time, and flow conversions, with at least 90% accuracy self-scored

Week 7

Math and Calculations & Recordkeeping, Asset Management, and Public Relations & Inspection, Testing, and Rehabilitation

  • Build and interpret a simple asset register with attributes for condition, age, and criticality

  • Explain how work order history supports preventive versus corrective maintenance decisions

  • Describe the elements of a public notification and customer communication plan for a planned or emergency shutdown

  • Calculate a simple capacity or condition index score from given asset data

  • Identify the records a collection system operator must maintain and the retention considerations for each

Your checkpoint

A sample asset register of 10 assets with condition scores and a prioritized replacement list justified in one paragraph

Week 8

Collection System Operations and Maintenance & Sewers, Lift Stations, and Pumping Equipment & Safety and Confined Space Entry & Wastewater Flow, Hydraulics, and Capacity & Inspection, Testing, and Rehabilitation & Regulations, Permits, and Reporting & Math and Calculations & Pretreatment, Grease, and Odor Control & Recordkeeping, Asset Management, and Public Relations

  • Complete a timed 60-question practice exam spanning all nine domains and record the score by domain

  • Review every missed question and write the correct concept in your own words

  • Re-drill the two weakest domains with targeted practice problems

  • Recite the confined-space entry sequence and SSO reporting steps from memory without notes

Your checkpoint

A practice exam score report by domain with a written remediation list for each domain scoring below 80%

Milestones

Week 2: Can describe lift station components and a PM schedule from memory without notes

Week 4: Scores at least 80% on a self-made 10-question quiz covering domains 1, 2, 3, and 4, and can complete a hazard assessment unaided

Week 6: Scores at least 90% on the calculation worksheet and can state SSO reporting timelines accurately

Week 8: Scores at least 80% overall on the timed practice exam with no domain below 70%