Confined space definition
A space with limited entry/exit, not designed for continuous occupancy, and large enough for entry; examples include manholes, wet wells, and tanks.
Atmospheric testing order
Test oxygen first (19.5-23.5%), then flammables (<10% LEL), then toxics (H2S <10 ppm, CO <35 ppm) before and during confined space entry.
Entry permit
A document required for permit-required confined space entry that identifies hazards, atmospheric testing results, ventilation, PPE, and rescue plan.
Lockout/tagout
Procedure to isolate energy sources (pumps, mixers) before maintenance or entry; verify zero energy to prevent accidental startup.
Manning's equation
Q = (1.486/n) * A * R^(2/3) * S^(1/2) for open channel flow in English units; used to calculate flow in sewers.
Self-cleansing velocity
Minimum flow velocity of about 2 ft/s in sanitary sewers to prevent solids deposition; maximum velocity about 10 ft/s to avoid erosion.
Infiltration and inflow
Infiltration is groundwater entering sewers through defects; inflow is stormwater entering through direct connections; both increase flow and require rehabilitation.
Hydraulic grade line
The line representing the energy grade of flowing water; must be below manhole rim to prevent surcharging in gravity sewers.
CCTV inspection
Closed-circuit television camera used to inspect sewer interiors; identifies cracks, roots, offsets, and infiltration; record and code defects.
Smoke testing
Blows smoke into sewers to locate inflow sources; notify public and fire department beforehand to avoid false alarms.
CIPP rehabilitation
Cured-in-place pipe: a liner impregnated with resin is inserted and cured to form a new pipe within the old one; trenchless method.
NPDES permit
National Pollutant Discharge Elimination System permit required for wastewater discharges; includes effluent limits, monitoring, and reporting requirements.
SSO reporting
Sanitary sewer overflows must be reported to the state agency within a specified time (often 24 hours); include volume, location, and corrective actions.
Pretreatment program
Local program controlling industrial discharges to protect treatment plant, workers, and receiving waters; includes permits, monitoring, and enforcement.
Grease trap maintenance
Regular removal of fats, oils, and grease from interceptors prevents blockages and SSOs; frequency depends on use and size.
Odor control methods
Chemical addition (chlorine, hydrogen peroxide, ferrous salts), biofilters, and covers reduce odors from sewers and treatment plants.
Detention time formula
t = Volume / Flow; ensure consistent units (e.g., gallons and gallons per day) to calculate time in days.
Flow rate conversion
1 cubic foot per second (cfs) = 448.8 gallons per minute (gpm); 1 million gallons per day (MGD) = 1.547 cfs.
Pump horsepower formula
HP = (Q * H * SG) / (3960 * efficiency) for centrifugal pumps; Q in gpm, H in feet, SG = specific gravity.
Chemical dose formula
lbs = (concentration, mg/L) * (volume, MG) * 8.34; used to calculate chemical feed for treatment.
Lift station purpose
Lifts wastewater when gravity flow is not possible; includes wet well, pumps, controls, and emergency power.
Pump maintenance
Regular inspection of impellers, seals, bearings, and check valves; monitor vibration and temperature to prevent failures.
Wet well cleaning
Remove grit and debris to prevent pump clogging and reduce wear; schedule based on accumulation.
Emergency power testing
Test generators regularly and ensure automatic transfer switches function; critical for lift stations during power outages.
Preventive maintenance scheduling
Inspect and clean sewers on a frequency based on pipe material, age, slope, and history; ranges from monthly to every 5 years.
Root control
Use mechanical cutting or chemical foaming to remove roots from sewers; repeat as needed, especially near mature trees.
SSO emergency response
Have a plan for sanitary sewer overflows: contain, clean up, notify public and regulators, and document corrective actions.
Asset management
Inventory assets, assess condition, prioritize maintenance, and plan capital improvements to sustain collection system performance.
CMMS
Computerized maintenance management system: tracks work orders, inventory, and maintenance history for efficient operations.
Public notification
Inform public of SSOs, projects, or health hazards using door hangers, websites, social media, and public meetings.
Record retention
Retain monitoring records, maintenance logs, and inspection reports for at least 3 years or longer as required by permit.
Biosolids regulations
40 CFR Part 503 governs biosolids management, including pathogen reduction and vector attraction reduction requirements.