CIE cheat sheet
CIE · Keep the key ideas within reach.
Work Design and Methods Engineering
Therbligs are the 18 fundamental motion elements (e.g., reach, grasp, move, position, release); effective therbligs advance work, ineffective ones (search, select, hold, rest) add no value.
Principles of motion economy: use both hands simultaneously, keep motions symmetrical and in opposite directions, prefer continuous curved motions over straight-line with sharp reversals, and locate tools and materials within the normal work area.
Normal and maximum work areas: normal area is swept by the forearm pivoting at the elbow; maximum area is swept by the extended arm pivoting at the shoulder.
Two-handed process chart records left- and right-hand motions on a common time scale to expose idle hand time and balance.
Flow process chart symbols: operation (circle), transport (arrow), inspection (square), delay (D-shape), storage (triangle).
Worker-machine chart distinguishes independent worker time, machine time, and combined time to identify interference and idle capacity.
Micromotion study uses film/video and therblig analysis for short-cycle, highly repetitive work; cyclegraph and chronocyclegraph trace motion paths via light trails.
Job enlargement adds tasks at the same level (horizontal loading); job enrichment adds planning and control responsibility (vertical loading).
Work Measurement and Time Standards
Standard time = Normal time × (1 + allowance fraction); Normal time = Observed time × Performance Rating (rating factor).
Number of cycles to observe: n = (z·s / (k·x̄))², where s is sample standard deviation, x̄ the sample mean, k the desired precision fraction, and z the normal deviate for the confidence level (z = 1.645 for 90%, 1.96 for 95%).
Allowance types: PFD (personal, fatigue, delay) is added to normal time; the allowance fraction is applied on top of normal time, not on observed time.
Time study element breakdown should be small enough to rate but large enough to time; break at natural divisions and separate manual from machine-controlled elements.
Predetermined time systems (MTM-1, MOST, MODAPTS) build standards from basic motion times and are valid only for the motions and conditions they cover.
Work sampling: proportion estimate p, required observations n = z²·p(1-p)/e²; accuracy is on the proportion, not on individual observations.
Continuous (cumulative) timing records running elapsed time and subtracts successive readings; snapback timing resets to zero each element.
Standard data and elemental time formulas let standards be set without direct study for families of similar parts.
Operations Research and Quantitative Methods
Linear programming: optimum of an LP occurs at a vertex of the feasible region; the simplex method moves between basic feasible solutions improving the objective.
Duality: primal max problem's dual is a min problem; dual prices (shadow prices) give the marginal change in the objective per unit increase in a binding right-hand side.
Transportation problem: initial solutions by northwest corner, least cost, or Vogel's approximation; optimality tested by MODI/stepping-stone (u_i + v_j = c_ij for used cells).
Assignment problem is solved by the Hungarian method; it is a special transportation problem with unit supplies and demands.
EOQ = sqrt(2DS/H) for deterministic demand D, order cost S, holding cost H per unit per period.
Queueing: for M/M/1, utilization ρ = λ/μ, L = ρ/(1-ρ), Lq = ρ²/(1-ρ), W = 1/(μ-λ); stability requires λ < μ.
PERT: expected activity time te = (a + 4m + b)/6, variance = ((b-a)/6)²; critical path is the longest expected-time path with zero slack.
Decision analysis: EMV = Σ(probability × payoff); expected value of perfect information = EV with PI − EV without PI.
Production Planning and Inventory Control
MRP logic: Gross requirements − scheduled receipts − projected on-hand + safety stock = net requirements; planned order release = planned order receipt offset by lead time.
MRP II extends MRP with capacity planning, shop floor control, and financial integration; ERP extends MRP II across the enterprise.
Aggregate planning strategies: chase (vary workforce/output), level (constant output with inventory/backlog), and mixed; cost trade-offs compare hiring, layoff, inventory, and stockout costs.
Inventory costs: holding (carrying) cost per unit per period, ordering/setup cost per order, and shortage cost; total cost minimum occurs where ordering cost equals holding cost under EOQ assumptions.
Safety stock for a given service level = z·σ_d·sqrt(L) when demand variability dominates and lead time is constant.
ABC classification: A items are few high-value (tight control), C items are many low-value (loose control); Pareto logic, roughly 80/20 value split.
Capacity: rated (demonstrated) capacity, required capacity from load = standard time × planned quantity; load profile compares required against available hours by work center.
Kanban/pull sizing relates to replenishment lead time and demand rate; a two-bin system reorders when the reserve bin is opened.
Facilities Planning and Material Handling
Systematic Layout Planning (SLP): relationship (from-to) chart, activity relationship chart, and space requirements drive block layout; closeness ratings A, E, I, O, U, X.
From-to chart counts material flow between departments; a load-distance score = Σ(flow_ij × distance_ij) is minimized for good layouts.
Flow patterns: straight line (product layout), U-shape (reduces travel and improves supervision), and L or S shapes for building constraints.
Process (job shop) layout groups similar equipment; product (flow line) layout arranges by operation sequence; cellular layout groups part families into manufacturing cells (group technology).
Assembly line balancing: cycle time = available time / required output; theoretical minimum stations = Σ task times / cycle time; balance delay = 1 − efficiency.
Material handling principles include unit load, shortest distance, gravity flow, and mechanization matched to volume; 10 material handling principles guide selection.
Conveyors suit high-volume fixed paths; industrial trucks (forklifts) suit variable paths and lower volume; AGVs and AS/RS automate repetitive moves and storage.
Warehouse layout: dedicated vs. random storage; cube utilization and slotting by popularity (ABC) reduce pick travel time.
Quality Engineering and Statistical Process Control
Control chart limits use ±3 sigma of the plotted statistic; for X̄-R charts, UCL_X̄ = X̄̄ + A2·R̄, LCL_X̄ = X̄̄ − A2·R̄, UCL_R = D4·R̄, LCL_R = D3·R̄.
For p-charts: center line p̄, limits p̄ ± 3·sqrt(p̄(1−p̄)/n); for c-charts: c̄ ± 3·sqrt(c̄).
Process capability: Cp = (USL − LSL)/(6σ); Cpk = min[(USL − μ), (μ − LSL)]/(3σ); Cpk < 1 means the process is not capable of meeting specifications.
Western Electric / Nelson rules detect nonrandom patterns: one point beyond 3σ, two of three beyond 2σ, runs of points on one side, trends, and excessive variation.
Type I error (α) is producer's risk (false alarm); Type II error (β) is consumer's risk (missed shift); OC curves plot probability of acceptance vs. fraction defective.
Acceptance sampling: AQL is the acceptable quality level, LTPD the lot tolerance percent defective; operating characteristic curve relates lot quality to probability of acceptance.
Gage R&R separates repeatability (equipment) and reproducibility (appraiser) variation; measurement system variation should be small relative to tolerance and process variation.
Six Sigma DMAIC: define, measure, analyze, improve, control; process sigma level relates DPMO to z-value (e.g., 3.4 DPMO ≈ 6σ with 1.5σ shift).
Engineering Economy and Cost Analysis
Time value: F = P(1+i)^n; P = F(1+i)^−n; (1+i)^n is the compound amount factor (F/P, i, n).
Uniform series: A = P·[i(1+i)^n / ((1+i)^n − 1)] (capital recovery factor); P = A·[((1+i)^n − 1)/(i(1+i)^n)] (P/A factor).
Sinking fund factor: A = F·[i/((1+i)^n − 1)]; used to accumulate a future amount from equal periodic deposits.
Net present value: discount all cash flows to present at the MARR; accept if NPV ≥ 0. IRR is the i that makes NPV = 0; accept if IRR ≥ MARR.
Payback period ignores time value beyond the recovery point; discounted payback accounts for it but still ignores cash flows after payback.
Depreciation: straight-line = (cost − salvage)/life; MACRS uses accelerated declining-balance with mid-year convention and half-year first/last-year rules.
Replacement analysis uses EUAC (equivalent uniform annual cost); retain the defender if its EUAC is lower than the challenger's minimum EUAC.
Benefit-cost ratio for public projects: B/C = PW(benefits)/PW(costs); accept if B/C ≥ 1.0 (using conventional or modified ratio consistently).
Human Factors and Ergonomics
NIOSH lifting equation: RWL = LC × HM × VM × DM × AM × FM × CM; the lifting index (LI) = load weight / RWL; LI > 1.0 indicates increased risk.
Anthropometric design: use the 5th percentile for reach and clearance, the 95th percentile for strength and clearance dimensions; design limits depend on whether the dimension is a constraint or a demand.
NIOSH multipliers: HM = 25/H (horizontal distance), VM = 1 − 0.003·|V − 75| (vertical location), with recommended limits for frequency and coupling.
Manual materials handling risk factors: load weight, horizontal distance, vertical location, asymmetry/twisting, frequency, and coupling quality.
Workstation design: elbows near 90°, wrists neutral, monitor top at or slightly below eye level, and keyboard height at seated elbow height.
Noise: 85 dBA is the common 8-hour exposure action level; noise dose doubles with every 3 dB increase (3 dB exchange rate) under OSHA.
Thermal and lighting: WBGT index combines dry-bulb, natural wet-bulb, and globe temperature; illuminance recommendations vary by task detail (e.g., general office ~300–500 lux).
Cognitive human factors: Fitts' law (movement time increases with distance and decreases with target width), Hick's law (decision time grows logarithmically with number of choices).
Lean Systems and Process Improvement
The seven wastes (TIMWOOD): transport, inventory, motion, waiting, overproduction, overprocessing, defects.
Value stream mapping distinguishes value-added, necessary non-value-added, and non-value-added steps; lead time = inventory / throughput (Little's law).
5S: sort, set in order, shine, standardize, sustain; it is a foundation for visual management and standardized work.
Pull systems (kanban) authorize production based on downstream consumption; push systems schedule based on forecasts.
SMED (single-minute exchange of dies) separates internal and external setup, converts internal to external, and streamlines remaining internal steps to cut changeover time.
TPM (total productive maintenance) targets overall equipment effectiveness: OEE = availability × performance × quality.
Kaizen is continuous incremental improvement; kaizen events (blitz) are focused short-duration improvement projects; PDCA (plan-do-check-act) is the underlying cycle.
Standardized work specifies takt time, work sequence, and standard in-process stock; takt time = available production time / customer demand.