- Therblig
- One of 18 basic motion elements used in micromotion analysis; effective therbligs advance work while ineffective ones such as search, select, and hold add no value.
- Principles of motion economy
- Rules for efficient motion: use both hands, keep motions symmetrical and smooth, place tools within the normal work area, and minimize eye travel and holding.
- Two-handed process chart
- A chart recording left- and right-hand motions on a shared time scale, used to reveal idle hand time and rebalance work between hands.
- Standard time formula
- Standard time equals normal time times one plus the allowance fraction, where normal time equals observed time multiplied by the performance rating factor.
- Sample size for time study
- Required cycles n = (z·s/(k·x̄))², using sample standard deviation s, mean x̄, desired precision fraction k, and normal deviate z for the confidence level.
- Work sampling formula
- Required observations n = z²·p(1−p)/e² for estimating a proportion p within absolute error e; accuracy applies to the proportion estimate.
- Predetermined time systems
- Systems such as MTM-1 and MOST that assign standard times to basic motions; valid only for the motions and conditions covered by the system tables.
- Shadow price
- The dual value of a binding constraint in a linear program, giving the marginal change in the objective per unit increase in that constraint's right-hand side.
- Hungarian method
- An algorithm for solving assignment problems by reducing rows and columns and covering zeros; it is a special case of the transportation problem.
- PERT expected time
- te = (a + 4m + b)/6 for optimistic, most likely, and pessimistic estimates; variance is ((b−a)/6)² and the critical path is the longest expected-time path.
- M/M/1 queue metrics
- For arrival rate λ and service rate μ with λ<μ: utilization ρ=λ/μ, average number in system L=ρ/(1−ρ), and average wait in queue Lq=ρ²/(1−ρ).
- Economic order quantity
- EOQ = sqrt(2DS/H) for deterministic demand D, fixed order cost S, and holding cost H per unit per period; ordering cost equals holding cost at the optimum.
- MRP net requirements
- Net requirements equal gross requirements minus scheduled receipts minus projected on-hand plus safety stock; planned order releases are offset by lead time.
- ABC inventory classification
- Pareto-based grouping where A items are few and high-value requiring tight control, and C items are many and low-value allowing loose control.
- Safety stock formula
- With constant lead time L and demand standard deviation σ_d, safety stock equals z·σ_d·sqrt(L), where z corresponds to the target cycle service level.
- Aggregate planning strategies
- Chase strategy varies output and workforce to match demand; level strategy holds output constant using inventory and backlog; mixed strategies combine both to minimize total cost.
- Assembly line balancing
- Cycle time equals available time divided by required output; minimum stations equal total task time divided by cycle time; balance delay equals one minus line efficiency.
- Load-distance score
- A layout metric summing flow between department pairs multiplied by the distance between them; lower scores indicate better layouts for the given flows.
- Systematic Layout Planning
- A procedure using relationship charts and closeness ratings (A, E, I, O, U, X) plus space requirements to develop and evaluate block layouts.
- Cellular layout
- A layout grouping dissimilar machines into cells that produce part families, combining the flexibility of job shops with some flow-line efficiency.
- Process capability Cpk
- Cpk = min[(USL−μ), (μ−LSL)]/(3σ); a value below 1.0 indicates the process mean or spread cannot meet specifications.
- X-bar and R limits
- Control limits are X̄̄ ± A2·R̄ for the mean chart and D4·R̄ and D3·R̄ for the range chart, using constants keyed to subgroup size.
- Producer's and consumer's risk
- Producer's risk (α) is the probability of rejecting a good lot (Type I error); consumer's risk (β) is accepting a bad lot (Type II error).
- Gage R&R
- A measurement system study separating repeatability (equipment variation) from reproducibility (appraiser variation) and comparing total gage variation to tolerance and process variation.
- Capital recovery factor
- A = P·[i(1+i)^n/((1+i)^n−1)] converts a present amount to an equivalent equal annual payment over n periods at interest rate i.
- Internal rate of return
- The interest rate that makes net present value of a project's cash flows equal zero; a project is acceptable when IRR is at least the MARR.
- MACRS depreciation
- Accelerated depreciation using declining-balance rates with the half-year convention, applying half-year depreciation in the first and last recovery years.
- Equivalent uniform annual cost
- EUAC converts a project's cash flows to an equal annual cost; in replacement analysis, keep the defender if its EUAC is below the challenger's minimum EUAC.
- NIOSH lifting equation
- RWL = LC·HM·VM·DM·AM·FM·CM; the lifting index equals load weight divided by RWL, and values above 1.0 indicate elevated injury risk.
- Anthropometric percentile selection
- Use the 5th percentile for reach and clearance demands and the 95th percentile for strength and clearance constraints so most users are accommodated.
- Fitts' and Hick's laws
- Fitts' law: movement time rises with distance and falls with target width. Hick's law: choice reaction time grows logarithmically with the number of alternatives.
- Overall equipment effectiveness
- OEE = availability × performance × quality; it measures how effectively equipment is used relative to its theoretical maximum output.
- Takt time
- Takt time equals available production time divided by customer demand; it sets the pace at which a process must complete one unit to meet demand.
- SMED
- Single-minute exchange of dies reduces changeover time by separating internal from external setup, converting internal steps to external, and streamlining remaining internal steps.