Quick reference

Planning, Layout, and Site Preparation

  • Panel weight in pounds = panel area in square feet × thickness in feet × concrete unit weight in pounds per cubic foot; normal-weight concrete is about 150 lb/ft³.

  • Panel layout is set from project control points; equal diagonal measurements between opposite corners confirm squareness before forms are fixed.

  • The casting slab must be clean, level, and free of standing water; local high or low spots change panel thickness and finished elevation.

  • Crane pick radius, outrigger positions, and access routes are fixed before casting because insert locations and panel orientation depend on the lift plan.

  • Panel identification marks are placed on the casting surface or form so each panel matches its erection drawing, location, and orientation.

  • Openings, blockouts, and edge reveals are laid out from the same control lines as the panel perimeter to prevent cumulative dimensional error.

  • Casting-area drainage is set so water flows away from forms; ponding at forms can alter the water-cement ratio at panel edges.

  • A casting bed must support formwork and fresh concrete without settlement; differential settlement can crack panels before lifting.

Quick reference

Forming and Panel Construction

  • Formwork resists fresh concrete lateral pressure; pressure increases with placement rate, concrete temperature, and depth of the concrete lift.

  • Form joints and corners are sealed to prevent grout loss; grout loss creates voids, honeycomb, and dimensional variation.

  • Form release agent is applied in a thin uniform film; puddling or overspray on reinforcement and inserts can reduce bond or contaminate surfaces.

  • Chamfer strips at panel edges form a bevel that reduces edge chipping during lifting and handling.

  • Blockouts and reveals are anchored to forms or the casting surface so they cannot float or shift during concrete placement.

  • Form line and grade are checked after staking and again before concrete placement; form movement after set affects panel geometry.

  • Forms are removed only when concrete has gained enough strength to resist damage and carry handling stresses.

  • Form dimensions are verified against panel drawings, including thickness, opening size, and insert locations, before reinforcing steel is placed.

Quick reference

Reinforcement, Embeds, and Inserts

  • Lift inserts are positioned at the lift points shown on the panel drawings and oriented to match the rigging hardware.

  • Reinforcement chairs maintain specified cover between steel and the casting surface; displaced chairs reduce cover and durability.

  • Embed plates and weld plates are fixed to forms or supporting steel so their face, elevation, and alignment match erection tolerances.

  • Field cutting of reinforcement is prohibited unless approved by the engineer; cut bars change panel strength and load path.

  • Insert capacity must exceed the load imposed by the panel, rigging angle, and dynamic lift effects.

  • Rebar must not bear directly on lift inserts or embed anchors in a way that blocks concrete flow around the anchor.

  • Sleeves and blockouts are coordinated with reinforcement to avoid cutting bars or moving inserts from their design location.

  • Concrete cover requirements depend on exposure and member type; cover is measured from the concrete surface to the nearest reinforcement.

Quick reference

Concrete Placement, Finishing, and Curing

  • Concrete is placed continuously between planned joints; delay that allows initial set creates a cold joint with reduced bond.

  • Internal vibration consolidates concrete around reinforcement and inserts; over-vibration causes segregation and can displace embeds.

  • Bleed water is allowed to disappear before troweling or floating; finishing while bleed water is present leads to weak, blistered surfaces.

  • Screeding sets panel thickness and surface elevation; screed rails and grade stakes are checked before and during placement.

  • Curing begins after finishing and keeps moisture in concrete; curing compound must cover the full exposed surface at the specified rate.

  • Concrete test cylinders are sampled from the delivered concrete and cured under controlled conditions before strength testing.

  • Hot-weather placement increases evaporation and early strength gain; wind, temperature, and humidity affect curing needs.

  • Finishing tools and sequences are matched to the specified surface texture; excess troweling can produce a slick, low-friction surface.

Quick reference

Lifting, Rigging, Erection, and Jobsite Safety

  • Panel weight for lifting equals volume × concrete unit weight; normal-weight concrete is approximately 150 lb/ft³.

  • For two symmetric slings, tension per sling = panel weight ÷ (2 × cos θ), where θ is the sling angle from vertical.

  • The lifting plan identifies crane capacity at the required radius, rigging configuration, panel weight, and center of gravity.

  • A pre-lift inspection verifies inserts, rigging hardware, crane setup, and panel condition before the panel is raised.

  • The exclusion zone under and around the suspended panel is kept clear of personnel during lifting and erection.

  • Temporary bracing is installed immediately after the panel is set and remains until permanent connections can carry the design loads.

  • Rigging hardware is selected by rated capacity; shackles, slings, and hooks are inspected for damage before use.

  • Lifting stops when wind, visibility, ground conditions, or crane signals make the lift unsafe.