ACI Tilt-Up Technician study materials
ACI Tilt-Up Technician study resources

ACI Tilt-Up Technician study plan

ACI Tilt-Up Technician · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Reinforcement, Embeds, and Inserts

  • Diagram reinforcement layouts for walls, pilasters, and openings, labeling bar sizes, spacing, and required clear cover

  • Match bar support types (chairs, bolsters, tie wire) to spacing that holds steel at the correct elevation during placement

  • Classify embeds and inserts - lift inserts, cast-in plates, weld plates, coil inserts, conduit - by function and load path

  • Calculate embed edge distance and pull-out capacity for a supplied panel geometry and flag inadequate layouts

Your checkpoint

A two-page embed/insert and reinforcement checklist per panel type, plus a 25-item self-written quiz scored at 80% or higher

Week 2

Lifting, Rigging, Erection, and Jobsите Safety

  • Identify rigging hardware (shackles, slings, spreader beams, lift links) and state inspection and rejection criteria for each

  • Sequence a complete tilt-up lift: pre-lift meeting, trial lift, hover check, travel, set-down, and bracing

  • Apply crane, rigger-qualification, signal-person, and exclusion-zone rules to a described lift scenario

  • Compute required crane capacity from panel weight, rigging weight, and safety factor for three sample panels

Your checkpoint

A written lift plan for a 30,000-lb panel that includes rigging selection, capacity math, and an exclusion-zone sketch, self-scored against a 10-point rubric

Week 3

Lifting, Rigging, Erection, and Jobsите Safety

  • Explain temporary bracing fundamentals: brace angle, spacing, embed capacity, and the conditions for brace removal

  • Apply fall-protection, ladder, and scaffold requirements to tasks performed at height during bracing and panel release

  • Detect wind, soil-bearing, and panel-stability hazards and define hold points that stop the lift

  • Draft a jobsite safety orientation outline addressing struck-by, caught-between, and crane swing hazards

Your checkpoint

A panel bracing and stability checklist plus a 15-question safety quiz scored at 80% or higher

Week 4

Forming and Panel Construction

  • Set edge forms and bulkheads to specified panel dimensions, tolerances, and chamfer or reveal details

  • Select and apply form release agents appropriate to the casting surface and the intended finish

  • Frame openings, reveals, and blockouts so they resist lift-induced cracking and stay in tolerance

  • Sequence casting-bed preparation: slab cleanliness, bond breaker, and stack-casting considerations

Your checkpoint

Dimensioned form and layout plan for three representative panels with openings; zero errors on a 10-point tolerance checklist

Week 5

Concrete Placement, Finishing, and Curing

  • Select slump, aggregate size, and admixtures suited to tilt-up mixes, then place concrete without segregation

  • Describe consolidation, screeding, and finishing steps and predict their effect on lift-surface quality

  • Apply curing methods and durations needed to reach release strength, and interpret cylinder break results

  • Diagnose common surface defects such as bug holes, laitance, and plastic cracking, and prescribe corrections

Your checkpoint

A placement, finishing, and curing procedure sheet with a strength-gain timeline and a 20-question release-strength quiz scored at 80% or higher

Week 6

Planning, Layout, and Site Preparation

  • Read site plans and panel layout drawings to verify gridlines, elevations, and panel mark numbering

  • Sequence site preparation steps: subgrade, casting slab, bond breaker, control lines, and utility coordination

  • Plan crane access, casting order, and laydown staging so they match the planned erection sequence

  • Assemble a pre-construction checklist covering permits, inspections, and weather contingencies

Your checkpoint

A site logistics and casting-sequence plan for a hypothetical 12-panel building, including a plan view and sequence table

Week 7

Reinforcement, Embeds, and Inserts & Lifting, Rigging, Erection, and Jobsите Safety & Forming and Panel Construction

  • Re-test weak objectives identified in weeks 1 through 6 and correct every missed item to a written explanation

  • Rehearse lift-plan and bracing decisions against timed scenario questions from Domains 5 and 3

  • Re-derive form, embed, and tolerance requirements from memory, then verify against notes

Your checkpoint

A corrected error log of at least 40 missed items, each rewritten with the correct answer and a one-line reason

Week 8

Planning, Layout, and Site Preparation & Concrete Placement, Finishing, and Curing & Lifting, Rigging, Erection, and Jobsите Safety

  • Complete two full-length timed practice exams covering all five domains and record domain-level scores

  • Re-drill the two lowest-scoring domains until each reaches 85% or higher

  • Summarize safety hold points and release criteria on a single reference sheet for final review

Your checkpoint

Two completed practice exams with scores recorded by domain and a one-page final reference sheet

Milestones

Week 2: Lift plan complete and reviewed; a 20-question rigging and crane-safety quiz is passed at 80% or higher

Week 4: A 40-question mixed quiz covering Domains 2, 3, and 5 is passed at 80% or higher, and the embed and form checklists are finished

Week 6: All five domain study sheets are complete and a 50-question cumulative quiz is passed at 80% or higher

Week 8: Both timed practice exams average 85% or higher with no single domain below 80%