Quick reference

Engineering Fundamentals and Applied Mathematics

  • Stress σ = F/A; strain ε = ΔL/L; elastic modulus E = σ/ε within the proportional limit.

  • Beam bending: σ = My/I, with maximum stress at the greatest distance y from the neutral axis.

  • Bernoulli (steady, incompressible, frictionless): p/γ + v²/2g + z = constant along a streamline.

  • Reynolds number Re = ρvD/μ; pipe flow is generally laminar below Re ≈ 2000 and turbulent above ≈ 4000.

  • Thermal expansion: ΔL = α·L·ΔT; linear α is roughly 12×10⁻⁶ /°C for steel and 23×10⁻⁶ /°C for aluminium.

  • Ohm's law V = IR; three-phase real power P = √3·V_L·I_L·cos φ.

  • Unit conversions: 1 bar = 100 kPa, 1 kgf ≈ 9.81 N, 1 kWh = 3.6 MJ, 1 hp ≈ 0.746 kW.

  • Quadratic roots: x = [−b ± √(b² − 4ac)] / 2a; the discriminant b² − 4ac gives the number of real roots.

Quick reference

Discipline-Specific Technical Knowledge

  • Concrete characteristic strength fck is the 28-day cube strength exceeded by 95% of test results; design strength = 0.85·fck/γc in many codes.

  • Steel reinforcement: yield strength fy typically 420–500 MPa for deformed bars; minimum concrete cover depends on exposure class.

  • Transformer efficiency peaks when copper (I²R) losses equal core (iron) losses.

  • For a centrifugal pump, flow varies with speed N, head with N², and power with N³ (affinity laws).

  • HVAC sensible heat Q_s = 1.2 × airflow (m³/s) × ΔT (°C) in kW; latent heat depends on moisture difference.

  • Diesel/gas engine ideal cycle is the dual cycle; Otto cycle efficiency η = 1 − 1/r^(γ−1) with compression ratio r.

  • Corrosion control: cathodic protection, protective coatings, and material selection by galvanic series (avoid coupling dissimilar metals).

  • Circuit breakers are rated by interrupting capacity and trip curve; discrimination ensures only the nearest device trips.

Quick reference

Engineering Design and Analysis

  • Design factor (safety factor) = failure strength / allowable stress; allowable stress = strength / design factor.

  • Load combinations in limit-state design apply factored dead, live, wind, and seismic loads with separate factors and combinations.

  • Fatigue design uses S-N curves; endurance limit applies for steels below about 10⁶ cycles.

  • Finite element analysis: refine mesh where stress gradients are high; check convergence of results with mesh size.

  • Tolerance stack-up: worst-case = sum of tolerances; statistical (RSS) = √(sum of squared tolerances).

  • Buckling of a column: Euler load P_cr = π²EI/(KL)², where K depends on end conditions.

  • Reliability: system in series R = ΠRᵢ; parallel (redundant) system R = 1 − Π(1 − Rᵢ).

  • Design review stages: conceptual, preliminary, detailed, and verification/validation against requirements.

Quick reference

Codes, Standards, and Regulatory Compliance

  • Codes set minimum requirements; standards are consensus technical documents; specifications are project-specific.

  • Common structural codes: ACI 318 (concrete), AISC 360 (steel), ASCE 7 (loads); Eurocodes EN 1990–1999 are the European equivalents.

  • Fire safety: NFPA 101 (Life Safety Code) and NFPA 13 (sprinklers); building codes classify occupancy and construction type.

  • Pressure equipment: ASME Boiler and Pressure Vessel Code; piping ASME B31 series.

  • Electrical installations: IEC 60364 / NEC NFPA 70; hazardous areas use IEC 60079 zone classification.

  • Compliance requires documented traceability from requirement to verification evidence (test reports, certificates).

  • Local authority having jurisdiction (AHJ) permits and inspections are legally required before occupancy.

  • Standards are updated periodically; always confirm the edition referenced by the contract.

Quick reference

Health, Safety, and Environmental Practice

  • Hierarchy of controls: elimination, substitution, engineering controls, administrative controls, then PPE.

  • Risk score = likelihood × severity; residual risk is assessed after controls are applied.

  • Confined space entry requires atmospheric testing (O₂ 19.5–23.5%), permit, attendant, and rescue plan.

  • Lockout/tagout (LOTO) isolates hazardous energy before maintenance; verify zero energy state.

  • Hazardous waste: cradle-to-grave responsibility; manifests track transport and disposal.

  • Noise exposure limit commonly 85 dBA over 8 hours; use hearing protection above the action level.

  • Environmental impact assessment (EIA) identifies significant impacts and mitigation before project approval.

  • Incident investigation (root cause analysis) aims at system causes, not blame; report near-misses too.

Quick reference

Project Management and Engineering Economics

  • Present worth: PW = F/(1+i)ⁿ; annuity factor (P/A, i, n) = [(1+i)ⁿ − 1]/[i(1+i)ⁿ].

  • Net present value (NPV) > 0 means the project earns more than the discount rate; choose the highest NPV among alternatives.

  • Internal rate of return (IRR) is the discount rate at which NPV = 0; accept if IRR exceeds the hurdle rate.

  • Payback period = initial investment / annual net cash flow (simple, ignores time value).

  • Depreciation: straight-line = (cost − salvage)/life; declining balance applies a fixed rate to book value.

  • Critical path method (CPM): the critical path has zero total float; any delay there delays the project.

  • Earned value: CV = EV − AC, SV = EV − PV; CPI = EV/AC, SPI = EV/PV.

  • Break-even quantity = fixed costs / (unit price − unit variable cost).

Quick reference

Professional Ethics and Engineering Responsibility

  • Paramount obligation: protect public health, safety, and welfare above employer or client interests.

  • Competence rule: accept work only within one's competence; disclose limitations and seek specialist input.

  • Conflict of interest must be disclosed in writing; avoid accepting gifts that could influence judgment.

  • Confidentiality applies to client information; exceptions exist for legal requirements or public safety.

  • Sign and seal only work you prepared or directly supervised; do not seal work of others without review.

  • Report known violations to the appropriate authority when safety is at risk; retaliation protections vary by jurisdiction.

  • Sustainable development: minimize environmental impact and consider life-cycle consequences in design decisions.

  • Bribery and facilitation payments are prohibited; maintain accurate and truthful records and reports.