AICP study materials
AICP study resources

AICP cheat sheet

AICP · Keep the key ideas within reach.

Quick reference

Research and Assessment Methods

  • Levels of measurement: nominal (unordered categories), ordinal (ranked, unequal intervals), interval (equal intervals, arbitrary zero), ratio (true zero). Mean suits interval/ratio; median suits ordinal or skewed data; mode suits nominal.

  • Margin of error for a simple random sample at 95% confidence is roughly 1/√n: about ±5% at n=400 and about ±3% at n=1,000.

  • Standard error of the mean = s/√n; it measures the precision of a sample estimate and shrinks as sample size increases.

  • Correlation coefficient r ranges from −1 to +1 and measures linear association only; correlation does not establish causation.

  • Coefficient of determination R² is the proportion of variance in the dependent variable explained by the model.

  • Cohort-component projection: next-period population = current population + births − deaths + net migration, tracked by age-sex cohorts.

  • Four-step travel demand model sequence: trip generation → trip distribution → mode split → route assignment.

  • Triangulation-combining multiple methods, data sources, or researchers-strengthens the validity of qualitative findings.

  • Doubling time in years ≈ 70 ÷ annual growth rate in percent.

Quick reference

Fundamental Planning Knowledge

  • Village of Euclid v. Ambler Realty (1926) upheld use-based, cumulative (Euclidean) zoning as a valid exercise of the police power.

  • Typical comprehensive plan elements: land use, transportation, housing, economic development, parks and open space, community facilities, and implementation.

  • Form-based codes regulate building form, frontage, and streetscape rather than separating uses; transect zones run from T1 (rural) to T6 (urban core).

  • Takings tests: Penn Central balancing weighs economic impact, investment-backed expectations, and character of the action; Nollan/Dolan require an essential nexus and rough proportionality for exactions.

  • Planning theory schools: rational-comprehensive, incremental (Lindblom), advocacy (Davidoff), and communicative/collaborative (Forester, Innes).

  • Zoning relief tools: variance (hardship), special or conditional use permit, nonconforming use status, planned unit development, and overlay district.

  • Smart growth principles: compact development, mixed use, walkability, transit orientation, infill, and preservation of open space and farmland.

  • Landmark references: 1909 Plan of Chicago (Burnham); 1920s Standard State Zoning Enabling Act; Berman v. Parker (1954) upholding blight condemnation.

Quick reference

Communication and Interaction

  • IAP2 public participation spectrum: inform → consult → involve → collaborate → empower, with public influence increasing at each level.

  • Arnstein's ladder of citizen participation has eight rungs, from manipulation and therapy up through partnership, delegated power, and citizen control.

  • A charrette is an intensive, multi-day collaborative workshop in which stakeholders and designers produce a plan or design together.

  • Delphi method: repeated anonymous questionnaires to experts with controlled feedback, iterated until views converge.

  • Stakeholder power/interest grid: high power and high interest = manage closely; high power and low interest = keep satisfied; low power and low interest = monitor.

  • Interest-based negotiation (Fisher and Ury): separate people from the problem, focus on interests, invent options for mutual gain, use objective criteria; BATNA is the fallback if talks fail.

  • Robert's Rules basics: quorum, motion, second, debate, vote; minutes record actions taken rather than verbatim discussion.

  • Active listening techniques: paraphrasing, open-ended questions, reflecting feelings, and summarizing to confirm understanding.

Quick reference

Plan and Policy Development

  • Plan process sequence: issue identification → vision and goals → data collection and analysis → alternatives → draft → adoption → implementation → monitoring and amendment.

  • Goals are broad desired outcomes; objectives are measurable. SMART objectives are specific, measurable, achievable, relevant, and time-bound.

  • An implementation matrix links each action to a responsible party, timeframe, funding source, and performance indicator.

  • SWOT analysis: internal strengths and weaknesses paired with external opportunities and threats.

  • The capital improvement plan schedules capital projects and funding over roughly five to six years and should be consistent with the comprehensive plan.

  • Policy analysis techniques: cost-benefit analysis, cost-effectiveness analysis, threshold analysis, and fiscal impact analysis.

  • Scenario planning tests policies against several plausible futures; visioning builds a shared picture of a desired future.

  • Vertical consistency means local plans align with state and regional plans; horizontal consistency means the plan aligns with zoning and the capital budget.

Quick reference

Plan Implementation

  • Core implementation tools: zoning, subdivision regulations, capital improvement programming, impact fees, exactions, tax increment financing, special districts, and tax abatements.

  • Tax increment financing captures growth in property tax revenue within a district to fund redevelopment, diverting revenue from overlapping taxing jurisdictions.

  • Impact fees are one-time charges on new development for off-site capital costs and must satisfy rational nexus and rough proportionality tests.

  • An adequate public facilities ordinance ties development approval to concurrency: roads, schools, water, and sewer must have capacity when impacts occur.

  • Transfer of development rights shifts development potential from sending areas preserved as open space to receiving areas designated for growth.

  • Cluster zoning concentrates density on part of a site to preserve open space; overlay zones add regulations on top of the underlying base zone.

  • Growth management techniques: urban growth boundaries (Portland), tiered growth systems, growth caps, and adequate public facilities requirements.

  • Development review sequence: pre-application conference, site plan review, subdivision plat, permits, inspections, and certificate of occupancy.

Quick reference

Administration and Management

  • Budget formats: line-item, performance, program, and zero-based; capital budgets are presented separately from operating budgets.

  • Fund accounting separates resources by purpose and restriction; enterprise funds cover self-supporting services such as water and sewer.

  • Performance measures: inputs (resources used), outputs (units produced), outcomes (results achieved), efficiency (output ÷ input), and effectiveness (outcome ÷ goal).

  • Span of control is the number of subordinates reporting directly to a supervisor; wide spans flatten an organization, narrow spans create tall hierarchies.

  • Gantt charts display task timing; the critical path method identifies the longest chain of dependent tasks, which sets the minimum project duration.

  • Procurement: an RFP solicits proposals against evaluation criteria, an RFQ seeks qualifications or price quotes, and an IFB takes sealed bids.

  • Public records and sunshine laws require open meetings, public notice, and accessible records, subject only to narrow statutory exceptions.

Quick reference

Leadership

  • Transactional leadership exchanges rewards for performance; transformational leadership inspires through vision, intellectual stimulation, and individual consideration.

  • Tuckman team development stages: forming, storming, norming, performing, adjourning.

  • Thomas-Kilmann conflict modes: competing, collaborating, compromising, avoiding, accommodating; selection depends on issue importance and relationship value.

  • Kotter's eight change steps: urgency, coalition, vision, communication, empowerment, short-term wins, consolidation, anchoring in culture.

  • Situational leadership matches directive and supportive behaviors to follower competence and commitment levels.

  • Goleman's emotional intelligence components: self-awareness, self-regulation, motivation, empathy, and social skill.

  • Effective delegation requires clear authority, adequate resources, defined expectations, and retained accountability for results.

Quick reference

Areas of Practice

  • Housing affordability standard: housing cost at or below 30 percent of gross household income; eligibility tiers are set as percentages of area median income (e.g., 60%, 80%, 120% AMI).

  • Transportation metrics: level of service grades A–F by delay, complete streets design for all users, and vehicle miles traveled (VMT) as a demand measure.

  • NEPA requires an environmental assessment or environmental impact statement for major federal actions significantly affecting the environment.

  • Section 106 of the National Historic Preservation Act requires review when federally funded, licensed, or permitted projects may affect historic properties.

  • Economic development tools: business improvement districts, tax abatements, revolving loan funds, cluster strategies, and opportunity zones.

  • Brownfields are previously developed sites with actual or perceived contamination that have redevelopment potential.

  • An MPO (metropolitan planning organization) is required for federal transportation funds in urbanized areas; a rural planning organization serves rural regions.

  • CPTED principles: natural surveillance, access control, territorial reinforcement, and maintenance.

Quick reference

AICP Code of Ethics and Professional Conduct

  • The AICP Code has three parts: aspirational principles, rules of conduct (enforceable), and procedural provisions governing enforcement.

  • The planner's primary obligation is to serve the public interest; conflicts of interest must be disclosed and positions may not be used for personal gain.

  • Rules of conduct prohibit misrepresentation, gifts or favors intended to influence decisions, and undisclosed conflicts; sanctions include censure, suspension, and revocation.

  • The Ethics Committee interprets the Code, investigates charges, conducts hearings, and recommends sanctions to the AICP Commission.

  • A planner should not accept work where a conflict exists unless the conflict is fully disclosed and all affected parties consent.

  • Procedural provisions set out how a charge is filed, investigated, heard, decided, and appealed.

  • Ethical duties run to clients, employers, colleagues, and the profession, but the public interest takes precedence when duties conflict.