Sensible heat formula: Btu/h = 1.08 × CFM × ΔT for standard air (0.075 lb/ft³, 0.24 Btu/lb·°F).
Latent heat formula: Btu/h = 0.68 × CFM × Δgrains (grains of moisture removed per pound of dry air).
Total heat = sensible heat + latent heat; sensible heat ratio (SHR) = sensible/total, typically 0.70–0.80 for comfort cooling.
Standard air density is 0.075 lb/ft³ at 70°F sea level; density decreases roughly 3.5% per 1,000 ft of elevation.
1 ton of refrigeration = 12,000 Btu/h = 200 Btu/min = heat absorbed melting 1 ton of ice in 24 hours.
Atmospheric pressure drops about 0.5 psi per 1,000 ft; at 4,000 ft it is roughly 12.7 psia versus 14.7 psia at sea level.
1 CFM = 60 cubic feet per hour; 1 watt = 3.412 Btu/h; 1 boiler horsepower = 33,475 Btu/h.
Airflow rule of thumb: 400–450 CFM per ton for standard cooling coils; higher altitudes require more CFM for the same mass flow.
Heating Systems and Equipment
AFUE measures seasonal efficiency of furnaces and boilers; condensing units typically 90%+, non-condensing 80–83%.
Natural gas heating value is about 1,000–1,050 Btu per cubic foot; propane about 2,500 Btu per cubic foot.
Combustion air: 50 ft³ per 1,000 Btu/h input when using indoor air from an unconfined space.
A 1 psi pressure drop equals about 2.31 feet of water column head.
Hydronic system: Btu/h = 500 × GPM × ΔT (°F); 1 GPM = 8.33 lb/min of water.
Steam at sea level occupies about 1,600 times the volume of the water that produced it; at altitude the ratio increases.
Furnace temperature rise = supply air temp minus return air temp; must fall within the nameplate-rated rise range.
Draft hood or induced draft fan maintains negative pressure in the flue to prevent spillage of combustion products.
Ventilation and Air Distribution
ASHRAE 62.1 uses ventilation rate procedure: Vbz = Rp × Pz + Ra × Az (people component plus area component).
Velocity pressure VP = (V/4005)² in inches of water, where V is fpm and 4005 is the standard air constant.
Static pressure losses: supply ducts 0.1 in. w.c. per 100 ft is a common design target; fittings add equivalent length.
Return air paths must be sized equal to or larger than supply; undersized returns cause pressurization and noise.
Friction chart: round duct friction loss rises roughly with the square of velocity; doubling velocity quadruples friction.
Duct velocity guidelines: 600–900 fpm trunk supply, 400–700 fpm branch, 300–500 fpm return.
Alaska buildings often need balanced ventilation with heat recovery (HRV/ERV) because envelope tightness limits natural infiltration.
A 90° elbow has an equivalent length of roughly 30–60 ft of straight round duct depending on radius ratio.
Air Conditioning and Refrigeration
Superheat = actual suction temperature minus saturation temperature at suction pressure; target 8–12°F at evaporator outlet for TXV systems.
Subcooling = saturation temperature at liquid pressure minus liquid line temperature; target 8–12°F for TXV systems.
Refrigerant glide occurs in zeotropic blends (e.g., R-407C, R-410A); use dew point for superheat and bubble point for subcooling.
R-410A operates at roughly 50–70% higher pressure than R-22 and requires POE oil, not mineral oil.
The compressor raises refrigerant pressure and temperature; the condenser rejects heat; the metering device drops pressure; the evaporator absorbs heat.
Evaporator coil temperature must stay above 32°F to prevent frost on comfort cooling systems; low airflow causes icing.
Refrigerant charging by weight is required when the system has no subcooling/superheat chart or when lines exceed 15 ft.
Recovery cylinders must never be filled beyond 80% of their water capacity by weight.
Piping, Ductwork, and Insulation
Duct sizing: equal friction method uses a constant pressure drop per foot; static regain method uses velocity reduction at each branch.
Sheet metal gage: 26 gage for ducts up to 12 in. width, 24 gage up to 18 in., 22 gage up to 24 in. (SMACNA).
Copper tubing types: K (heavy, underground), L (standard, above ground), M (light, interior only).
Pipe expansion: ΔL = 12 × L × α × ΔT, where α for copper is about 9.3 × 10⁻⁶ in/in·°F.
Insulation R-value per inch: fiberglass ~3.7, closed-cell polyiso ~6.0, spray foam ~6.5.
Duct leakage testing per SMACNA: seal all joints and seams on medium- and high-pressure ducts; leakage class depends on pressure class.
Refrigerant line insulation must cover suction lines; liquid lines are insulated in high-ambient or long-run applications.
Piping slope for condensate drains: at least 1/8 in. per foot toward the drain, with a trap at the air handler.
Electrical and Controls
Ohm's law: E = I × R; power P = E × I; for single-phase, watts = volts × amps × power factor.
Three-phase power: watts = 1.732 × volts × amps × power factor.
Motor full-load amps appear on the nameplate; minimum circuit ampacity (MCA) and maximum overcurrent protection (MOCP) govern wire and breaker sizing.
Locked rotor amps (LRA) are typically 5–6 times running load amps; hard-start kits reduce starting current.
Thermostat wiring: R = 24V power, W = heat, Y = cooling, G = fan, C = common, O/B = reversing valve.
A contactor coil is energized by the thermostat; the contacts switch line voltage to the compressor and condenser fan.
24V control circuits are Class 2; line-voltage circuits are Class 1 and require different conductor and enclosure rules.
A capacitor's microfarad rating should be within ±10% of nameplate; a failed run capacitor causes high current and no-start conditions.
Safety, Tools, and Code Compliance
Recover refrigerant before opening a system; venting CFCs, HCFCs, and HFCs is prohibited under Section 608 of the Clean Air Act.
Technicians handling refrigerant must hold EPA Section 608 certification; Type I (small appliances), Type II (high pressure), Type III (low pressure), or Universal.
Carbon monoxide alarm placement: outside sleeping areas and on each level; CO is colorless, odorless, and slightly lighter than air.
Manifold gauge set: blue = low side, red = high side, yellow = center/charging.
Combustion safety: measure CO in flue gas; draft must be verified before and after service on gas appliances.
Lockout/tagout is required before servicing electrical components; verify with a meter, never assume the disconnect is off.
Leak detection: electronic detectors, UV dye, and nitrogen pressure testing; never use oxygen or acetylene as a trace gas.
OSHA requires fall protection above 6 ft in construction and 4 ft in general industry; Alaska adds cold-stress and ice hazards.
Alaska Business, Law, and Licensing
Alaska mechanical contractor work requires a state Mechanical Administrator license; the administrator must pass an exam and meet experience requirements.
Alaska has no statewide HVAC journeyman license; local municipalities (e.g., Anchorage, Fairbanks) may impose their own licensing.
Alaska Business License is required for any person or entity doing business in the state; renewed every two years.
Alaska has no state general sales tax; local boroughs and cities may levy sales tax (e.g., Anchorage 0%, some boroughs up to 7%).
State procurement and contract law follow Alaska Statute Title 36 (public works) and Title 45 (trade and commerce).
Alaska OSHA (AKOSH) enforces workplace safety under 29 CFR 1910/1926 as adopted by the state.
Contractors must carry workers' compensation insurance for employees under Alaska Statute Title 23; independent-contractor status is narrowly defined.
Bonding: contractors handling funds or public work may be required to post performance and payment bonds; Alaska Statute 36.25 governs public works bonds.