AL General Contractor study materials
AL General Contractor study resources

AL General Contractor study plan

AL General Contractor · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Business, Finance, and Project Administration (contracts, bidding, scheduling, cost control, insurance, liens)

  • Build a one-page matrix comparing lump-sum, cost-plus, cost-plus-with-GMP, and unit-price contracts, listing who carries quantity risk, who carries price risk, and how retainage is typically applied

  • Write, from memory, a 15-item checklist of bid-day requirements (bid bond, addenda acknowledgment, unit prices, alternates, withdrawal/revocation window) and then verify each item against a reference text

  • Draw a 15-activity precedence network by hand and compute earliest start, latest finish, total float, and the critical path for every activity

  • List the notice, recording, and foreclosure deadlines for mechanic's liens and state in one sentence how a lien waiver differs from a lien release

Your checkpoint

A six-page Domain 1 notebook section containing the contract matrix, the completed 15-activity CPM diagram with float values for each activity, and a dated lien-deadline sheet signed as verified

Week 2

Business, Finance, and Project Administration (contracts, bidding, scheduling, cost control, insurance, liens) & Safety, Code Compliance, and Plan Reading

  • Solve five earned-value problems computing CPI, SPI, EAC, and VAC from given PV/EV/AC figures and explain in writing what each result signals to the owner

  • Tabulate builder's risk, general liability, workers' compensation, and umbrella coverage by what each pays for, typical limits, and who is the named insured

  • Identify on a set of construction drawings the scale of each sheet, the drawing index, the section and detail callouts, and the finish schedule reference

  • Convert five scale measurements from architectural to engineering scale and check each against a stated dimension string

Your checkpoint

A graded problem set of five earned-value calculations (all arithmetic shown) plus an annotated drawing set with 20 plan-reading callouts identified and labeled by type

Week 3

Site Work, Excavation, and Foundations & Concrete and Masonry Construction

  • Classify five soil samples using a sieve analysis and Atterberg limits, and state the bearing capacity assumption each would support

  • Compute the active earth pressure and required shoring depth for a 12-foot-deep excavation in a given soil profile

  • Differentiate shallow spread footings, mat foundations, and deep pile/caisson systems by loading condition, settlement behavior, and dewatering needs

  • Sequence a concrete placement from subgrade prep through curing, naming the inspection hold points and the tests (slump, air content, cylinder breaks) taken at each stage

Your checkpoint

A one-page excavation-and-shoring plan plus a concrete placement sequence chart with all inspection hold points and required field tests marked

Week 4

Concrete and Masonry Construction & Structural Steel, Metals, and Rough Carpentry

  • Specify mortar type (M, S, N, O) and grout for six given masonry conditions and justify each choice by compressive strength and exposure

  • Detail the reinforcement, grouting, and flashing requirements for a reinforced CMU retaining wall in a two-page sketch

  • Match five steel connection types (bolted shear, bolted slip-critical, welded moment, etc.) to their inspection method and acceptance criteria

  • Lay out floor, wall, and roof framing for a simple rectangular structure and identify the load path from roof sheathing to foundation

Your checkpoint

A two-page masonry detail set (reinforced wall section with flashing and grout notes) plus a framing plan with the complete vertical load path traced in color

Week 5

Thermal and Moisture Protection, Roofing, and Waterproofing

  • Compare low-slope roof assemblies (built-up, modified bitumen, single-ply TPO/EPDM) by membrane type, seam method, slope range, and typical warranty term

  • Detail the flashing conditions at a roof penetration, a parapet, and a wall base for both roofing and below-grade waterproofing

  • Explain the purpose and placement of vapor retarders, air barriers, and drainage planes, and identify in a wall section which layer performs which function

  • Diagnose five common water-intrusion failure modes and prescribe the corrected detail for each

Your checkpoint

A five-detail waterproofing and roofing sketch portfolio (penetration, parapet, wall base, below-grade, plaza deck) each annotated with membrane, flashing, and drainage notes

Week 6

Doors, Windows, and Finishes & Mechanical, Electrical, and Plumbing Coordination / Specialty Construction

  • Write the fire-rating, hardware, and egress requirements for door assemblies in a rated corridor and verify each against a code citation

  • Sequence the finish trades for a typical room (drywall, tape, prime, ceiling grid, flooring, paint, trim) and identify the inspection and lead-time gates between them

  • Produce a coordination drawing showing how a duct main, sprinkler main, plumbing waste line, and cable tray share a ceiling plenum without violating required clearances

  • List the rough-in inspections and pressure/leak tests required before concealment for plumbing, electrical, mechanical, and fire protection systems

Your checkpoint

A composite MEP/ceiling plenum coordination sketch with clearances dimensioned, plus a finish-trade sequence bar chart showing inspection hold points

Week 7

Safety, Code Compliance, and Plan Reading

  • Build a site-specific safety plan outline covering the six focus areas (falls, struck-by, caught-in/between, electrical, excavations, cranes) with the control hierarchy for each

  • Identify the OSHA trigger thresholds for fall protection, trench shoring, scaffold erection, and confined-space entry and state the required response at each threshold

  • Perform a full takeoff of quantities (concrete volume, masonry units, drywall area) from a small plan set and compare results to a provided answer key

  • Cross-check a set of drawings against the written specifications and log every discrepancy found

Your checkpoint

A site-specific safety plan outline with all trigger thresholds cited, plus a completed quantity takeoff with a discrepancy log of at least five drawing-versus-spec conflicts

Week 8

Business, Finance, and Project Administration (contracts, bidding, scheduling, cost control, insurance, liens) & Site Work, Excavation, and Foundations & Concrete and Masonry Construction & Structural Steel, Metals, and Rough Carpentry & Thermal and Moisture Protection, Roofing, and Waterproofing & Doors, Windows, and Finishes & Mechanical, Electrical, and Plumbing Coordination / Specialty Construction & Safety, Code Compliance, and Plan Reading

  • Complete three full-length timed practice exams and record the score by domain after each attempt

  • Re-teach the two lowest-scoring domains by writing a one-page summary of each from memory without notes

  • Rebuild the flashcard set for every domain, keeping only cards missed on the practice exams

  • Rehearse the calculation types most often missed (earned value, earth pressure, concrete volume, load path) until each is solved correctly twice in a row

Your checkpoint

A score-tracking sheet for three timed practice exams showing per-domain results and improvement, plus a final one-page summary sheet per weak domain

Milestones

Week 2: Score 80% or better on a self-written 25-question quiz covering contracts, bidding, scheduling, cost control, insurance, and liens

Week 4: Explain the structural load path and the concrete placement hold points aloud in under five minutes without notes, and score 75% or better on the Domain 2-4 question set

Week 6: Produce the MEP coordination sketch and finish sequence chart unaided, and correctly answer 8 of 10 flashcard prompts on roofing, waterproofing, doors, and finishes

Week 8: Average 80% or better across three full-length timed practice exams with no single domain below 70%