AL Plumber study materials
AL Plumber study resources

AL Plumber study plan

AL Plumber · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Sanitary Drainage Systems and Drainage Design

  • Compute drainage fixture unit (DFU) loads for individual fixtures, branches, stacks, and the building drain

  • Apply the correct slope and size to horizontal fixture branches, soil/waste stacks, and building sewers using sizing tables

  • Distinguish horizontal versus vertical fixture drain rules and change-of-direction requirements

  • Locate cleanouts and pipe supports at code-mandated intervals and justify each placement

Your checkpoint

A worked sizing worksheet solving 10 DFU-to-pipe-size problems with slope and fall calculations shown, scored at 90% or better

Week 2

Sanitary Drainage Systems and Drainage Design & Plumbing Mathematics, Plan Reading, and Isometric Drawings

  • Translate a floor plan into a single-line isometric riser diagram showing stacks, drains, and fixture connections

  • Convert a completed isometric back into DFU totals and verify every pipe size on the drawing

  • Solve fall, slope, and developed-length problems using length times grade plus unit conversions

  • Interpret plumbing symbols, abbreviations, and elevation marks on a plan set

Your checkpoint

Hand-drawn isometric drainage diagram for a two-bath dwelling with every pipe labeled by size, plus a 10-question math set scored at 80% or better

Week 3

Water Supply and Distribution Systems

  • Size the water service, main, and branches from water supply fixture unit values and developed length

  • Calculate available pressure by subtracting elevation loss (0.434 psi per foot of rise) and friction loss from street pressure

  • Compare the demand-supply method against velocity limits and select the governing pipe size

  • Specify shutoff valves, pressure-reducing valves, and water hammer arrestors at required locations

Your checkpoint

A pressure-budget calculation sheet for a two-story building showing static pressure, elevation loss, friction loss, residual pressure, and a documented PRV decision

Week 4

Vents and Venting Systems & Water Supply and Distribution Systems

  • Identify individual, common, wet, circuit, stack, and relief vent types and state the conditions under which each is permitted

  • Size vent stacks and individual vents from drain size and fixture-unit tables

  • Verify vent termination clearances from windows, doors, air intakes, and property lines

  • Diagnose venting defects on a rough-in layout and correct each one

  • Re-check water supply sizing decisions against vent-related wet-venting restrictions

Your checkpoint

A one-page venting reference sheet listing each vent type with its sizing rule and prohibitions, plus eight diagnosed-and-corrected venting errors

Week 5

Plumbing Fixtures, Fixture Fittings, and Appliances & Gas Piping and Gas-Fitting Systems

  • Compute minimum fixture counts from occupant load and apply required clearances and spacing for a commercial restroom

  • Verify fixture-fitting requirements including faucet flow rates, water closet flush volumes, and trap seal sizes

  • Convert appliance Btu/h input to cubic feet per hour and size gas piping using the longest-length method

  • Apply combustion air, appliance venting, and connector requirements to a gas installation

Your checkpoint

A combined fixture-count and gas-sizing worksheet for a 40-occupant restaurant showing Btu/h to CFH conversions and the selected pipe size for each segment

Week 6

General Regulations, Definitions, and Code Administration & Backflow Prevention and Cross-Connection Control

  • Trace the permit and inspection sequence from application to certificate of occupancy and name the responsible party at each step

  • Apply code definitions precisely, distinguishing shall from should and listed from approved

  • Classify backflow hazards as high or low and as pollution or contamination

  • Select the correct backflow prevention device (RPZ, DCVA, PVB, AVB, double check) for six given installations and justify each choice

Your checkpoint

A table of 10 code definitions written in your own words plus six cross-connection scenarios each paired with a device selection and one-sentence justification

Week 7

Water Heaters and Temperature Control & Traps, Interceptors, and Special Wastes

  • Size water heaters and storage from peak-hour demand and first-hour rating

  • Apply temperature and pressure relief valve, discharge pipe, and thermal expansion requirements

  • Set temperature limits and mixing valve requirements for scald protection at fixtures

  • Determine when a grease interceptor, oil separator, or sand trap is required and size it by flow rate and retention time

Your checkpoint

A water heater sizing sheet covering three building types plus an interceptor selection summary for two commercial kitchens, with all inputs cited

Week 8

General Regulations, Definitions, and Code Administration & Plumbing Mathematics, Plan Reading, and Isometric Drawings & Plumbing Fixtures, Fixture Fittings, and Appliances & Water Supply and Distribution Systems & Sanitary Drainage Systems and Drainage Design & Vents and Venting Systems & Traps, Interceptors, and Special Wastes & Water Heaters and Temperature Control & Backflow Prevention and Cross-Connection Control & Gas Piping and Gas-Fitting Systems

  • Complete two timed full-length practice exams and score results by domain

  • Rebuild an error log and re-work every missed item until answered correctly with a stated reason

  • Recite from memory the highest-yield numbers: drainage slopes, vent clearances, water pressure limits, and fixture-unit values

  • Review the three lowest-scoring domains and redo their week-specific drills

Your checkpoint

Final timed exam scored at 80% or better with no domain below 70%, plus a one-page numbers-to-memorize card

Milestones