The AMPP Coating Inspector Program (CIP) Level 2 is an intermediate-level credential within AMPP's coating inspection certification ladder, aimed at inspectors who already understand the fundamentals of protective coatings and now need to work with less supervision, interpret specifications, and resolve field questions. It suits coating inspectors, QA/QC personnel, coating applicators moving into inspection, and owner or engineering staff who witness and sign off on coating work. The AMPP CIP Level 2 case studies are 5 cases and about 3,947 words.
1The Two-Mil Disagreement on a Tank Shell
You are the third-party coating inspector on the exterior of a 250,000-gallon aboveground storage tank. The specification requires a zinc-rich primer at 3.0–5.0 mils DFT and an amine-epoxy intermediate at 5.0–7.0 mils.
756 words, about 4 min2Peeling Polyurethane on the Clarifiers
A municipal wastewater plant is coating the exteriors of four 60-ft-diameter clarifiers. The specified system is a zinc-rich epoxy primer at 3–5 mils, an amine-adduct epoxy intermediate at 5–7 mils, and an acrylic-aliphatic polyurethane finish at 2–3 mils over SSPC-SP 10 steel.
767 words, about 4 min3Salts in the Ballast Tanks
A bulk carrier's ballast tanks must be blasted to SSPC-SP 10/NACE No. 2 with a 2.5–3.5 mil angular profile and a maximum of 3 µg/cm² chloride prior to a 12–15 mil 100% solids epoxy lining.
774 words, about 4 min4Thin, Dry, Pinholey - The Airless Rig That Couldn't
You are inspecting a 100% solids epoxy lining for a potable water tank: 20–25 mils DFT, single coat, applied by plural-component airless spray, mixing ratio 2:1 by volume. The contractor's rig runs a 68:1 pump with 3/8 in ID by 150 ft of hose, no heater, and a 0.017 in tip.
845 words, about 4 min5Three Pull-Offs and a Cold Adhesive
A 100% solids epoxy tank lining, specified at 20–25 mils, requires ASTM D4541 pull-off testing with a minimum of 750 psi and no adhesive failure at the glue line. The contractor glues 20 mm dollies and pulls three of them: Dolly 1: 610 psi, adhesive failure at the dolly/coating interface.