PMGT-BC · Keep the key ideas within reach.

Quick reference

Project Management Fundamentals and Core Concepts

  • A project is a temporary endeavor producing a unique product, service, or result; operations are ongoing and repetitive.

  • Triple constraint: scope, time, and cost are interdependent; a change to one typically forces adjustment to at least one other.

  • Project life cycle phases (generic): starting, organizing and preparing, carrying out the work, and closing.

  • Process groups are Initiating, Planning, Executing, Monitoring and Controlling, and Closing; they are not sequential phases and repeat as needed.

  • Ten knowledge areas: integration, scope, schedule, cost, quality, resource, communications, risk, procurement, and stakeholder management.

  • A stakeholder is anyone who can affect or be affected by the project; influence/interest grids prioritize engagement effort.

  • Organizational structures: functional (PM has little authority), matrix (weak/balanced/strong), and projectized (PM has high authority).

  • A project charter authorizes the project and names the project manager; it is issued by the sponsor.

  • Earned value formulas: CV = EV - AC; SV = EV - PV; CPI = EV/AC; SPI = EV/PV; EAC (typical) = BAC/CPI.

Quick reference

Predictive, Plan-Based Methodologies

  • Predictive (waterfall) life cycles define detailed scope early and manage change through formal integrated change control.

  • WBS decomposition follows the 100% rule: child elements must capture all work of the parent, no more and no less.

  • A work package is the lowest WBS level at which cost and duration can be reliably estimated and managed.

  • Critical path is the longest path through the network and determines the shortest possible project duration; its total float is zero.

  • Total float = LS - ES or LF - EF; a negative float indicates the project is behind a required date.

  • PERT expected duration = (Optimistic + 4 x Most Likely + Pessimistic) / 6.

  • Three-point estimating and analogous, parametric, and bottom-up techniques differ in accuracy and cost of preparation.

  • Cost baseline = approved time-phased budget excluding management reserves; contingency reserves cover known risks.

  • Change control steps: request, assess impact, decide (approve/reject/defer), update plans and baselines, communicate, and verify.

Quick reference

Agile Frameworks and Methodologies

  • Agile Manifesto values: individuals and interactions, working software, customer collaboration, and responding to change over their counterparts.

  • Scrum roles are Product Owner, Scrum Master, and Developers; the Scrum Master serves the team and removes impediments rather than directing work.

  • Scrum events: Sprint, Sprint Planning, Daily Scrum, Sprint Review, and Sprint Retrospective; the Sprint is the container for the others.

  • Scrum artifacts: Product Backlog, Sprint Backlog, and Increment; the Definition of Done governs when work counts as complete.

  • Kanban limits work in progress (WIP) to expose bottlenecks and optimize flow; it prescribes no fixed iterations or roles.

  • XP practices include pair programming, test-driven development, continuous integration, and small releases.

  • Velocity = story points completed per iteration; use it for forecasting, not for comparing teams.

  • Burndown charts track remaining work over time; burnup charts show completed scope against total scope.

  • Servant leadership, self-organizing teams, and empirical inspection/adaptation underpin agile delivery.

Quick reference

Business Analysis Frameworks

  • BABOK knowledge areas include planning, elicitation and collaboration, requirements life cycle management, strategy analysis, requirements analysis and design definition, and solution evaluation.

  • Requirements classification: business requirements, stakeholder requirements, solution requirements (functional and nonfunctional), and transition requirements.

  • Elicitation techniques include interviews, workshops, observation, surveys, document analysis, and prototyping; technique choice depends on stakeholder access and need type.

  • A use case describes actor-system interactions toward a goal; a user story is a short placeholder for a conversation, often in 'As a... I want... so that...' form.

  • MoSCoW prioritizes requirements as Must have, Should have, Could have, and Won't have this time.

  • Traceability links requirements to their source, to design elements, and to test cases, supporting impact analysis and coverage.

  • A context diagram defines solution scope by showing the system as a single process with external entities and data flows.

  • Root cause analysis (for example, the five whys or fishbone diagram) precedes recommending a solution to a business problem.

  • Requirements must be verified for characteristics such as unambiguous, complete, consistent, feasible, and testable.