Project Definition
A temporary endeavor undertaken to create a unique product, service, or result, with a defined start and finish and constrained resources.
Triple Constraint
The interdependent relationship among scope, time, and cost; adjusting one constraint typically requires adjusting at least one of the others to keep the project viable.
Project Charter
A document issued by the sponsor that formally authorizes the project, names the project manager, and states high-level objectives, scope, and constraints.
Process Groups
Initiating, Planning, Executing, Monitoring and Controlling, and Closing; these are activity groupings applied iteratively, not sequential project phases.
Stakeholder Register
A record identifying project stakeholders along with their roles, interests, influence, expectations, and engagement requirements, used to plan communications.
Cost Performance Index
CPI equals earned value divided by actual cost; a value below 1.0 indicates the project is spending more than the work earned.
Schedule Variance
SV equals earned value minus planned value; a negative result means less work has been completed than the schedule planned at that point.
Projectized Organization
An organizational structure in which teams report to the project manager, who holds high authority over resources and decisions.
Work Breakdown Structure
A hierarchical decomposition of total project scope into deliverables and work packages; it follows the 100% rule and excludes work outside scope.
Critical Path
The longest duration path through the project network, which sets the shortest possible project duration and normally has zero total float.
Total Float
The amount of time an activity can be delayed without delaying the project finish date; calculated as late start minus early start.
PERT Estimate
A weighted expected duration computed as (Optimistic + 4 times Most Likely + Pessimistic) divided by 6, used when duration uncertainty is high.
Analogous Estimating
A top-down technique that uses duration or cost data from similar past projects; fast and inexpensive but generally less accurate.
Parametric Estimating
An estimating technique that multiplies a unit rate by a quantity, such as cost per square meter times floor area, using historical data.
Contingency Reserve
A budget or time allowance held for identified risks with accepted responses; it is included in the approved cost baseline.
Management Reserve
A budget held by senior management for unforeseen work within project scope; it is not part of the cost baseline but part of the total budget.
Integrated Change Control
The formal process of reviewing change requests, assessing impacts across scope, schedule, cost, and quality, then approving, rejecting, or deferring them.
Scope Creep
Uncontrolled expansion of project scope without corresponding adjustments to time, cost, or resources, usually from unapproved changes.
Agile Manifesto Values
Four value statements favoring individuals and interactions, working software, customer collaboration, and responding to change over their counterparts.
Product Owner
The Scrum role accountable for maximizing product value by managing and ordering the product backlog and representing stakeholder needs.
Scrum Master
The Scrum role that serves the team by facilitating Scrum events, coaching agile practices, and removing impediments rather than directing work.
Sprint Retrospective
A recurring Scrum event where the team inspects its process and collaboration and identifies improvements to apply in the next sprint.
Definition of Done
A shared, explicit checklist of quality criteria that an increment must meet before it is considered complete.
Kanban WIP Limit
A cap on the number of items allowed in a workflow stage at once, used to expose bottlenecks and improve flow.
Velocity
The average number of story points a team completes per iteration, used to forecast future capacity rather than to compare teams.
Burndown Chart
A graph of remaining work versus time within an iteration or release, showing whether the team is on track to finish.
Elicitation Techniques
Methods such as interviews, workshops, observation, surveys, document analysis, and prototyping used to draw out stakeholder needs and requirements.
Nonfunctional Requirements
Solution requirements describing quality attributes and constraints, such as performance, security, usability, and reliability, rather than specific behaviors.
MoSCoW Prioritization
A technique classifying requirements as Must have, Should have, Could have, or Won't have this time to guide scope decisions.
Requirements Traceability
The ability to link each requirement to its source, design elements, and test cases, supporting impact analysis and coverage verification.
Context Diagram
A model showing the solution as a single process surrounded by external entities and the data flows crossing the boundary, defining solution scope.
Root Cause Analysis
A technique such as the five whys or fishbone diagram used to identify the underlying cause of a problem before recommending a solution.