Project life cycle
The sequence of phases a project passes through from concept to benefits realisation; phases commonly include concept, definition, deployment, transition and benefits realisation.
Stage gate
A decision point at the end of a project phase where authorised reviewers assess progress and approve, reject or amend the plan before the next phase begins.
Linear life cycle
A project life cycle in which phases are completed sequentially, with limited overlap, suitable when requirements are stable and change is expected to be low.
Iterative life cycle
A project life cycle that repeats cycles of development and review, allowing requirements and solutions to evolve through feedback, often used in uncertain or changing environments.
Product life cycle
The period from a product's conception through development, launch, growth, maturity and decline; it is longer than and contains the project life cycle.
Success criteria
The measures against which a project's success is judged, such as meeting agreed time, cost, quality and scope targets and achieving intended benefits.
Success factors
The conditions or practices that increase the likelihood of project success, such as clear objectives, senior sponsorship, skilled teams and effective stakeholder engagement.
Benefit
A measurable improvement or advantage resulting from a project output or outcome that is perceived as positive by one or more stakeholders.
Benefits realisation
The process of ensuring that planned benefits are achieved and measured after project outputs are delivered, often continuing beyond the project life cycle.
Dis-benefit
A measurable decline or negative consequence for a stakeholder that results from a project, which should be identified and managed alongside intended benefits.
Project sponsor
The senior person accountable for the project's business case and success, providing direction, resources and an escalation point for the project manager.
Project manager
The person responsible for day-to-day management of the project, including planning, delivery, team leadership, stakeholder communication and progress reporting within delegated authority.
Project board
A governance group that provides senior direction and makes key decisions for a project, often including sponsor, senior user and senior supplier roles.
Project management office
A function that supports projects by providing standards, templates, reporting, assurance and central coordination, with authority ranging from supportive to controlling.
RACI matrix
A responsibility assignment tool that identifies who is Responsible, Accountable, Consulted and Informed for each activity or decision in a project.
Stakeholder
Any individual or group that can affect, be affected by, or perceive itself to be affected by a project decision, activity or outcome.
Power-interest grid
A stakeholder analysis tool that plots stakeholders by their influence and level of interest, guiding tailored engagement and communication strategies.
Communication plan
A document defining what information will be communicated, to whom, when, by what method and with what feedback arrangements for a project.
Communication channels formula
The number of possible communication channels among n people is n(n-1)/2; for 10 people this gives 45 channels.
Stakeholder engagement
The process of identifying, analysing and interacting with stakeholders to understand their needs and secure appropriate involvement and support throughout the project.
Work breakdown structure
A hierarchical decomposition of project scope into manageable deliverables or work packages, forming the basis for estimating, scheduling and control.
Critical path
The longest sequence of dependent activities through a project network, determining the shortest possible project duration; activities on it have zero float.
Float
The amount of time an activity can be delayed without delaying the project finish, calculated as late start minus early start or late finish minus early finish.
Milestone
A significant point or event in a project schedule, typically shown with zero duration, used to mark completion of a phase or key deliverable.
Risk
An uncertain event or condition that, if it occurs, will have a positive or negative effect on project objectives such as time, cost, quality or scope.
Issue
A problem or event that has already occurred and is affecting the project, requiring management action rather than probability assessment.
Risk score
A rating calculated by multiplying the probability of a risk by its potential impact, used to prioritise risks for response and monitoring.
Risk owner
The person assigned accountability for managing a specific risk, including selecting and implementing responses and monitoring the risk throughout the project.
Quality assurance
The process-oriented activity of ensuring that project processes and standards are appropriate and followed, often through audits and reviews, to prevent defects.
Quality control
The product-oriented activity of inspecting and testing deliverables against acceptance criteria to identify defects and confirm that required quality has been achieved.
Change control
A formal process for requesting, assessing, approving or rejecting, implementing and reviewing changes to a project's baselined scope, schedule, cost or quality.
Configuration management
The discipline of identifying, controlling, recording and reporting project products and their versions, ensuring changes are tracked and the correct versions are used.