- Definition of risk
- An uncertain event or set of events that, if it occurs, affects the achievement of objectives, combining probability of occurrence with impact on those objectives.
- Risk exposure formula
- Risk exposure equals probability multiplied by impact. It produces an expected value used to rank threats and opportunities on a common scale.
- Threat versus opportunity
- A threat is an uncertain event whose occurrence has a negative effect on objectives. An opportunity is an uncertain event whose occurrence has a positive effect.
- Individual versus overall risk
- Individual risk is a single uncertain event with its causes and effects. Overall project risk is the aggregate effect of all uncertainty sources on project objectives.
- Residual and secondary risk
- Residual risk remains after planned responses are applied. Secondary risk is a new risk created by implementing a response.
- Risk appetite versus tolerance
- Risk appetite is the amount of risk an organization is willing to seek or accept. Risk tolerance is the acceptable variation around a specific objective.
- Risk management framework contents
- A framework comprises risk policy, defined roles and responsibilities, the risk process, supporting tools and techniques, and reporting arrangements.
- Risk ownership and escalation
- Risk owners own individual risks and responses. The project board or sponsor owns overall project risk. Risks above defined thresholds are escalated upward.
- Risk management plan
- A document describing the approach, methodology, roles, funding, timing, risk categories, appetite and tolerance, and reporting formats for risk management.
- Risk breakdown structure
- A hierarchical, source-based categorization of risk (e.g., technical, commercial, external) used to structure identification and ensure balanced analysis.
- Risk context factors
- Internal context includes objectives, culture, capability and resources. External context includes market, regulatory, political, technological and environmental factors affecting risk.
- Identification techniques
- Methods to find risks include brainstorming, interviews, Delphi, checklists, prompt lists, SWOT analysis, assumption analysis and cause-and-effect diagrams.
- Assumptions as risk sources
- An assumption is something believed true but unproven. If it proves false, or a constraint is breached, it becomes a risk to objectives.
- Risk register entry contents
- A register entry records a unique identifier, cause, event, effect, category, owner, initial assessment and current status for each risk.
- Iterative identification
- Risk identification is repeated throughout the project, at phase gates and after significant change, rather than performed once at the start.
- Qualitative risk analysis
- Assessment of probability and impact using defined scales to produce a risk rating, prioritize risks and decide which need further analysis or response.
- Probability-impact matrix
- A grid mapping assessed probability against assessed impact to derive a risk rating; ratings above tolerance trigger escalation or active response.
- Expected monetary value
- EMV equals probability multiplied by monetary impact. Threat EMV is negative; opportunity EMV is positive. EMVs can be summed across a risk set.
- Monte Carlo simulation
- A quantitative technique running many iterations of cost or duration distributions to produce a probability distribution of project outcomes, such as P50 and P80.
- Sensitivity analysis
- Analysis, often shown as a tornado diagram, ranking which risks or variables most influence the outcome, guiding where analysis and response effort should focus.
- Decision tree analysis
- A technique comparing options by expected value across branches, incorporating the probabilities and payoffs of each possible outcome.
- Threat response strategies
- The strategies for threats are avoid, reduce (mitigate), transfer, accept (retain) and escalate. Each response requires an owner and planned actions.
- Opportunity response strategies
- The strategies for opportunities are exploit, enhance, share and accept (or escalate). Exploit ensures realization; enhance raises probability or impact.
- Transfer of risk
- Transfer shifts the financial consequence of a threat to a third party, for example through insurance, contract terms or warranty. The risk itself is not removed.
- Contingency and fallback plans
- A contingency plan is triggered if a defined risk occurs. A fallback plan is used if the primary response fails or is insufficient.
- Risk monitoring activities
- Monitoring tracks risk status, response progress, residual exposure and changes in probability or impact, using early warning indicators and scheduled reviews.
- Risk reporting metrics
- Typical metrics include top risks by rating, exposure trend over time, overdue responses, and the count of risks exceeding tolerance.
- Risk closure criteria
- A risk is closed when evidence shows it is no longer relevant or it has occurred and been managed. Closed risks are archived for lessons learned.
- Lifecycle risk profile
- Uncertainty and risk exposure are highest in early phases such as concept and definition, and generally reduce as design and delivery progress.
- Early influence on risk
- The greatest ability to influence outcomes at lowest cost exists in early lifecycle phases; late changes carry higher cost and greater risk.
- Risk maturity progression
- Maturity models describe progression from ad hoc, reactive risk handling through defined and managed practice to optimized, embedded and risk-informed decision making.
- Risk culture
- Risk culture is the shared attitudes and behaviors toward risk, including whether people raise risks openly and whether bad news travels upward without blame.