APMG LSS Yellow Belt flashcards
APMG LSS Yellow Belt · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Value in Lean
- A step the customer would pay for because it changes form, fit, or function, is done correctly the first time, and meets the customer's need.
- TIMWOOD wastes
- Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects: the seven classic Lean wastes used to categorize non-value-adding activity.
- Overproduction waste
- Producing more, sooner, or faster than the next step needs. It is considered the worst waste because it creates and conceals the other six.
- Push versus pull
- Push releases work based on forecast or schedule; pull releases work only when a downstream customer signals a need, limiting work in process.
- Five Lean principles
- Specify value from the customer's view, map the value stream, create flow, establish pull, and pursue perfection through continuous improvement.
- 5S workplace organization
- Sort, Set in order, Shine, Standardize, Sustain: a sequence for organizing a workplace so abnormalities and waste become visible.
- Process cycle efficiency
- Value-added time divided by total lead time. A low ratio indicates most elapsed time is waiting rather than productive work.
- Kaizen
- Continuous, incremental improvement made by the people who do the work, typically through small rapid changes rather than large capital projects.
- DMAIC phases
- Define, Measure, Analyze, Improve, Control: the five-phase Six Sigma roadmap for improving an existing process with unknown root causes.
- DPMO
- Defects per million opportunities, calculated as defects divided by (units times opportunities per unit), then multiplied by one million.
- Rolled throughput yield
- The product of each step's first-pass yield across a process. It shows the true probability that a unit passes every step without rework.
- CTQ characteristic
- A measurable, customer-critical requirement derived from Voice of the Customer that the process must deliver within defined specification limits.
- Project charter purpose
- A document stating the problem, goal, scope, business case, team, and milestones. It is the team's agreement with the sponsor.
- Measure phase output
- A validated measurement system, a documented data collection plan, and a baseline of process performance and capability against customer requirements.
- Common versus special cause
- Common cause is normal inherent variation of a stable process; special cause is unusual, assignable variation that signals something changed.
- Control phase purpose
- To sustain the gains by standardizing the new method, monitoring with control charts, mistake-proofing, and handing ownership to the process owner.
- Sigma level meaning
- A capability measure relating process variation to specification width. Higher sigma levels correspond to lower defects per million opportunities.
- SIPOC diagram
- A high-level process map showing Suppliers, Inputs, Process steps, Outputs, and Customers, used to set project scope and boundaries.
- Pareto analysis
- A ranking technique based on the principle that a small number of causes produce most of the effect, used to focus improvement effort.
- Fishbone diagram
- A cause-and-effect diagram that branches potential causes into categories such as Man, Machine, Method, Material, Measurement, and Environment.
- Five Whys
- Repeatedly asking why a problem occurs until the underlying root cause is reached rather than stopping at a symptom.
- FMEA RPN
- Risk Priority Number equals Severity times Occurrence times Detection. Higher values indicate failure modes that should be addressed first.
- Cp versus Cpk
- Cp compares specification width to process spread; Cpk also accounts for centering, so Cpk is always less than or equal to Cp.
- Poka-yoke
- Mistake-proofing: a device or method that prevents an error from occurring or stops a defect from passing to the next step.
- Standard work
- A documented, agreed method for a task with defined sequence, cycle time, and work-in-process, forming the baseline for improvement.
- Control chart purpose
- A time-ordered plot with statistically calculated limits used to distinguish stable common-cause variation from signals of special-cause change.
- Yellow Belt role
- A team member who applies basic improvement tools in their own work area, contributes data and ideas, and supports Green and Black Belt projects.
- Green versus Black Belt
- Green Belts lead projects part time alongside their normal job; Black Belts lead projects full time and coach others in tools and methods.
- Project sponsor
- A senior leader who authorizes the project, secures resources, removes barriers, and holds the business case accountability for results.
- Process owner
- The person accountable for the process after the project ends, responsible for sustaining controls and continuing improvement.
- Team stages
- Forming, Storming, Norming, Performing, and Adjourning: the typical sequence of team development that a leader must manage.
- RACI matrix
- A tool assigning Responsible, Accountable, Consulted, and Informed roles so that decision rights and communication paths are explicit.