APMG LSS Yellow Belt key terms
APMG LSS Yellow Belt · Get comfortable with the vocabulary.
- Value
- Related: Waste, Value Stream
Any activity or feature for which a customer is willing to pay because it changes a product or service in a way the customer cares about, delivered right the first time.
- Waste (Muda)
- Related: Value, The Eight Wastes, Value Stream Mapping
Any activity that consumes resources, time, or space but creates no value for the customer. Lean improvement work focuses on finding and removing it from processes.
- The Eight Wastes
- Related: Waste (Muda), Gemba
A checklist of common non-value-adding activity types: defects, overproduction, waiting, non-utilised talent, transportation, inventory, motion, and extra processing. Teams use it to spot opportunities during process walks.
- Value Stream
- Related: Value Stream Mapping, Value, Lead Time
The complete sequence of activities, people, information, and material flows required to take a customer request from order to delivery, including both value-adding and non-value-adding steps.
- Value Stream Mapping
- Related: Value Stream, Lead Time, Process Map
A visual technique that charts the flow of material and information through a process, marking processing times and delays so the ratio of value-adding to non-value-adding time becomes visible.
- Lead Time
- Related: Process Cycle Time, Value Stream, Little's Law
The total elapsed clock time from when a customer request arrives until the finished output is delivered, including all waiting and queue time between steps.
- Process Cycle Time
- Related: Lead Time, Little's Law, Takt Time
The time a single unit actually spends being worked on as it passes through a process, excluding time spent waiting in queues between steps.
- Little's Law
- Related: Lead Time, Work in Progress, Bottleneck
A relationship stating that average lead time equals average work in progress divided by average completion rate. It shows that reducing queues shortens delivery time without changing capacity.
- Takt Time
- Related: Flow, Bottleneck, Process Cycle Time
The available production time divided by customer demand over the same period. It sets the pace a process must meet to satisfy demand without building excess inventory.
- Flow
- Related: Takt Time, Pull System, Work in Progress
The ideal state in which work moves smoothly from step to step without batching, backflow, or queueing, so items are completed close to the rate customers need them.
- Pull System
- Related: Kanban, Flow, Work in Progress
A way of controlling work in which downstream steps signal an upstream step when they need more input, so production is triggered by actual consumption rather than by forecasts.
- Kanban
- Related: Pull System, Work in Progress
A visual signal, such as a card or empty container, that authorises an upstream step to produce or replenish a set quantity of items in a pull system.
- Bottleneck
- Related: Theory of Constraints, Little's Law, Takt Time
The step in a process with the lowest capacity, which limits the output of the whole system and where queues tend to build up.
- Theory of Constraints
- Related: Bottleneck, Continuous Improvement
An improvement approach holding that every system has at least one limiting factor, and that gains come from identifying it, exploiting it, subordinating other steps to it, then elevating it.
- Work in Progress (WIP)
- Related: Little's Law, Pull System, Flow
The number of items that have entered a process but are not yet finished, including those being worked on and those waiting in queues.
- 5S
- Related: Standard Work, Visual Management, Waste (Muda)
A workplace organisation method with five steps: sort, set in order, shine, standardise, and sustain. It reduces motion and search waste and makes abnormal conditions easy to see.
- Standard Work
- Related: 5S, Visual Management, Continuous Improvement
A documented, agreed method for performing a task that captures the current best sequence, timing, and quality checks, and serves as the baseline for further improvement.
- Visual Management
- Related: Standard Work, Kanban, Andon
Using displays such as boards, labels, and colour coding so that anyone can see at a glance whether a process is on plan and where problems are occurring.
- Andon
- Related: Visual Management, Jidoka
A visual or audible signal that alerts a team or leader that a problem has occurred and assistance is needed, allowing issues to be addressed before defects pass downstream.
- Kaizen
- Related: Continuous Improvement, PDCA, Gemba
A structured approach to making many small, incremental improvements, typically through short team-based events that focus on a specific process area.
- Gemba
- Related: Kaizen, The Eight Wastes
The actual place where work is done and value is created. Improvement relies on observing and asking questions there rather than relying on reports or meeting rooms.
- Continuous Improvement
- Related: Kaizen, PDCA, Standard Work
An ongoing organisational habit of finding, testing, and embedding small changes that improve quality, speed, or cost, rather than relying on occasional large projects.
- Six Sigma
- Related: DMAIC, Variation, Sigma Level
A data-driven improvement methodology aimed at reducing variation and defects in processes, using statistical thinking and a structured project sequence to reach near-perfect output quality.
- DMAIC
- Related: Six Sigma, Define Phase, Control Plan
A five-phase improvement cycle: Define the problem and customer requirements, Measure current performance, Analyse causes, Improve the process, and Control the gains.
- Define Phase
- Related: DMAIC, Voice of the Customer, Project Charter
The first DMAIC phase, in which the team clarifies the problem, customer requirements, scope, goals, and business case, and secures agreement from the process owner.
- Measure Phase
- Related: DMAIC, Measurement System Analysis, Baseline
The DMAIC phase in which the team maps the process, defines what to measure, validates the measurement system, and collects baseline data on current performance.
- Analyse Phase
- Related: DMAIC, Root Cause Analysis, Fishbone Diagram
The DMAIC phase in which data and process knowledge are used to identify and verify the root causes of the problem, separating genuine causes from coincidence.
- Improve Phase
- Related: DMAIC, PDCA, Pilot
The DMAIC phase in which the team generates, selects, pilots, and implements changes that address verified root causes and then confirms the improvement is real.
- Control Phase
- Related: DMAIC, Control Plan, Standard Work
The final DMAIC phase, which puts in place monitoring, standard work, and response plans so the improved performance is maintained after the project team disbands.
- Voice of the Customer (VOC)
- Related: Critical to Quality, Define Phase
The collection and translation of customer needs, expectations, and feedback into specific, measurable requirements that a process must satisfy.
- Critical to Quality (CTQ)
- Related: Voice of the Customer (VOC), Specification Limits
A measurable characteristic of a product or service that directly reflects what matters to the customer and is used to judge whether the process is performing acceptably.
- Variation
- Related: Common Cause, Special Cause, Six Sigma
The natural differences in process outputs over time. Understanding its size and causes lets teams decide whether a process is stable and capable of meeting requirements.
- Common Cause Variation
- Related: Special Cause Variation, Statistical Process Control, Variation
Normal, everyday variation built into the design of a stable process. It can only be reduced by changing the process itself, not by reacting to individual results.
- Special Cause Variation
- Related: Common Cause Variation, Statistical Process Control, Root Cause Analysis
Unusual variation arising from a specific, identifiable event or assignable factor outside the normal behaviour of the process, which should be investigated and eliminated.
- Statistical Process Control (SPC)
- Related: Common Cause Variation, Special Cause Variation, Control Plan
The use of control charts to plot process data over time with statistically derived limits, so teams can distinguish normal variation from signals that something has changed.
- Sigma Level
- Related: Six Sigma, Process Capability, Specification Limits
A measure of process capability expressing how many standard deviations fit between the process average and the nearest specification limit, with higher values indicating fewer defects.
- Process Capability
- Related: Sigma Level, Specification Limits, Variation
A comparison of the spread of a stable process's output against its specification limits, showing whether the process can consistently meet requirements.
- Specification Limits
- Related: Process Capability, Critical to Quality (CTQ), Statistical Process Control (SPC)
The upper and lower boundaries of acceptable output set by customer requirements or design, as distinct from the control limits calculated from process data.
- Baseline
- Related: Measure Phase, Pilot
The measured level of current process performance, captured before changes are made, so that any improvement can later be compared against a fair starting point.
- Measurement System Analysis
- Related: Measure Phase, Baseline
A study that checks whether the method used to collect data is accurate and consistent enough to be trusted before conclusions are drawn from that data.
- Root Cause
- Related: Root Cause Analysis, Five Whys, Fishbone Diagram
The underlying reason a problem occurs which, if removed, prevents the problem from recurring. Addressing symptoms alone leaves the cause in place.
- Root Cause Analysis
- Related: Root Cause, Five Whys, Fishbone Diagram
A structured investigation that moves beyond the visible symptom to find and verify the underlying conditions that produced a problem.
- Five Whys
- Related: Root Cause Analysis, Fishbone Diagram
A simple questioning technique in which the team repeatedly asks why a problem occurred, typically about five times, to work from the symptom down to an actionable cause.
- Fishbone Diagram
- Related: Root Cause Analysis, Five Whys, Pareto Chart
A cause-and-effect diagram that arranges possible causes of a problem into branches, often grouped as people, method, machine, material, measurement, and environment, to prompt broad thinking.
- Pareto Chart
- Related: Fishbone Diagram, Histogram
A bar chart of problem categories ordered by frequency, paired with a cumulative line, used to show that a small number of causes account for most of the effect.
- Histogram
- Related: Pareto Chart, Variation
A chart that groups numerical data into intervals and shows how many observations fall in each, revealing the shape, centre, and spread of a data set.
- Process Map
- Related: Value Stream Mapping, Swimlane Diagram
A diagram showing the steps, decision points, inputs, and outputs of a process, used to build shared understanding and to expose loops, handoffs, and unnecessary steps.
- Swimlane Diagram
- Related: Process Map, Value Stream Mapping
A process map arranged in horizontal or vertical lanes, one per role or department, that makes handoffs, ownership, and delays between functions easy to see.
- PDCA Cycle
- Related: Kaizen, Continuous Improvement, Pilot
A repeating improvement loop: plan a change and predict its effect, do it on a small scale, check the results against the prediction, then act to standardise or adjust.
- Pilot
- Related: PDCA Cycle, Improve Phase, Baseline
A limited trial of a proposed change run before full implementation, used to test assumptions and gather evidence with contained risk.
- Control Plan
- Related: Control Phase, Statistical Process Control (SPC), Standard Work
A document that specifies what is monitored, how often, by whom, and what response is triggered when performance drifts, so improvements are sustained.
- Project Charter
- Related: Define Phase, Sponsor, Process Owner
A short document authorising an improvement project that states the problem, goal, scope, team, milestones, and expected benefits, agreed with the sponsor.
- Sponsor
- Related: Project Charter, Process Owner, Stakeholder
The senior manager who authorises an improvement project, provides resources, removes organisational barriers, and is accountable for realising the intended benefits.
- Process Owner
- Related: Sponsor, Control Phase, Project Charter
The person accountable for the ongoing performance and design of a process, who accepts improvements at handover and ensures they are maintained after the project ends.
- Yellow Belt
- Related: Green Belt, DMAIC, Continuous Improvement
A foundation-level improvement role. The holder understands core Lean and Six Sigma concepts, contributes to team projects, and applies basic tools in their own work area under guidance.
- Green Belt
- Related: Yellow Belt, Black Belt, DMAIC
A trained improvement practitioner who leads smaller projects or supports larger ones part-time, applying DMAIC and basic statistics while continuing their normal role.
- Black Belt
- Related: Green Belt, DMAIC, Six Sigma
An experienced improvement practitioner, typically full-time, who leads complex cross-functional projects, coaches Green Belts, and applies advanced statistical methods.
- Stakeholder
- Related: Sponsor, Project Charter
Any person or group affected by, or able to influence, a process or improvement project, whose interests and concerns need to be identified and managed.
- Team Formation Stages
- Related: Yellow Belt, Stakeholder
The recognised progression a team goes through as it matures, commonly described as forming, storming, norming, performing, and later adjourning.