Substantial completion
Stage at which work is sufficiently complete for the owner's intended use; it starts warranty periods, allows reduced retainage, and transfers risk of loss to the owner.
Change order
Written instrument signed by the owner, contractor, and architect that modifies the contract sum or contract time after the work has been priced and agreed.
Construction change directive
Written order from the architect directing a change before owner and contractor agree on price or time; the architect sets a not-to-exceed amount for payment.
Request for information
Formal contractor question asking the design professional to clarify or interpret the drawings and specifications; the answer does not by itself change cost or time.
Additive alternate
Separately priced bid item that adds scope to the base bid; alternates are accepted in the order listed until the owner's budget is reached.
Retainage
Portion of each progress payment, usually 5 to 10 percent, withheld by the owner as security and released or reduced at substantial completion.
Site observation
Periodic architect visits to verify general conformance with the contract documents; observation excludes supervision, means-and-methods control, and continuous inspection of the contractor's work.
Punch list
Itemized record of incomplete or deficient work compiled at substantial completion; items must be corrected before final payment and certification of final completion.
Contour interval
Vertical distance between adjacent contour lines, such as two feet; closer spacing means steeper ground and wider spacing means flatter ground.
Hachured contour
Contour line drawn with short tick marks pointing downhill toward lower elevation, used to show a depression such as a pond or sinkhole.
Percent slope
Rise divided by run, multiplied by one hundred; a three-foot drop over sixty feet equals five percent slope on the ground.
Hydric soils
Soils formed under saturated, oxygen-poor conditions, shown by gray colors and mottling; their presence indicates wetlands and usually triggers regulatory permits.
DBH
Diameter at breast height, measured four and a half feet above grade, typically on the uphill side; the standard measurement for sizing and protecting trees.
Public Land Survey System
Federal grid dividing land into six-mile townships containing thirty-six one-mile sections of 640 acres each; the basis for many legal parcel descriptions.
Flood Zone AE
FEMA-designated area with a one percent annual chance of flooding and a published base flood elevation; building there requires permits and elevation certificates.
Floor area ratio
Gross building floor area divided by lot area; a zoning measure of building bulk used together with setbacks, height limits, and lot coverage.
Prospect and refuge
Environmental preference theory: people favor settings that offer broad outward views, prospect, while providing a sense of shelter or concealment, refuge.
CPTED
Crime prevention through environmental design: natural surveillance, natural access control, territorial reinforcement, and maintenance used to reduce opportunities for crime and fear.
Hydrozone
Group of plants with similar water needs irrigated as one unit; hydrozoning improves irrigation efficiency and allows low-water zones to be shut off separately.
Design development
Phase after schematic design in which the concept is refined, materials and dimensions are fixed, and the estimate is checked before construction documents begin.
Accessible route
Continuous unobstructed path with thirty-six inch minimum clear width, running slope no steeper than 1:20, cross slope no steeper than 1:48, and firm stable surface.
Van-accessible space
Parking stall eleven feet wide, or eight feet wide with an eight-foot access aisle; at least one in six accessible spaces must be van accessible.
Defensible space Zone 1
The five-to-thirty-foot band around a building where plants are kept low, spaced, and irrigated to break up wildfire fuel continuity.
Massing
Grouping plants of one species in bold drifts or blocks so they read as a single design element instead of isolated specimens.
Spot elevation
Point marked with an exact elevation at a grade break, inlet, corner, or tree; used where contours cannot fully describe the intended surface.
Rational method
Peak runoff formula Q equals CiA, where C is a runoff coefficient, i is rainfall intensity in inches per hour, and A is area in acres.
Cut and fill balance
Grading in which excavated volume equals placed volume, avoiding hauling and import costs; volumes computed by average end area or contour methods.
Swale
Broad shallow vegetated channel used to convey and infiltrate stormwater, typically with one to two percent longitudinal slope and side slopes of 3:1 or flatter.
Weep hole
Small opening in a retaining wall that drains water collected in gravel backfill, relieving hydrostatic pressure that would otherwise overturn or crack the wall.
MasterFormat Division 32
CSI specification division for exterior improvements, including paving, site furnishings, planting, irrigation, and other landscape work.
Three-part specification
Standard CSI section format: Part 1 General covers submittals and quality assurance, Part 2 Products covers materials, and Part 3 Execution covers installation.
Detention basin
Facility that temporarily stores stormwater and releases it slowly at a controlled rate to reduce downstream peak flow; a retention basin instead holds a permanent pool.