AR Landscape study materials
AR Landscape study resources

AR Landscape key terms

AR Landscape · Get comfortable with the vocabulary.

Standard of Care

The degree of skill and care a reasonably competent landscape architect would exercise under similar circumstances. It is the legal yardstick for judging negligence and is generally not lowered by contract terms.

Related: Scope of Services
Scope of Services

A written list of the tasks the landscape architect will and will not perform under a professional services agreement. It sets the fee basis, deliverables, and limits of responsibility.

Related: Standard of Care, Addendum
Addendum

A written modification to bidding or construction documents issued before proposals are opened. Addenda clarify, correct, or supplement the documents and become part of the contract.

Related: Change Order, Request for Information (RFI)
Change Order

A written agreement, signed by owner and contractor, that modifies the contract sum, contract time, or scope after award. It is the standard instrument for authorized changes.

Related: Construction Change Directive, Substantial Completion
Construction Change Directive

A written order from the owner, prepared by the landscape architect, directing a change before owner and contractor agree on price or time. It is later converted into a change order.

Related: Change Order, Request for Information (RFI)
Request for Information (RFI)

A formal written question from a contractor asking the design professional to clarify or interpret the contract documents. Responses are logged and may lead to an addendum or change order.

Related: Addendum, Change Order
Submittal

A document, sample, or product data sheet the contractor sends to the design professional to show that proposed materials or methods meet the specification. Review confirms conformance but does not relieve the contractor.

Related: Request for Information (RFI), Three-Part Specification
Substantial Completion

The stage when work is sufficiently finished that the owner can use it for its intended purpose, with only minor punch-list items remaining. It starts warranty periods and releases part of retained payment.

Related: Pay Application, Change Order
Pay Application

A contractor's periodic request for payment, supported by a schedule of values showing work completed. The landscape architect reviews it and certifies the amount due to the owner.

Related: Substantial Completion, Change Order
Base Map

A scaled drawing of existing site conditions, including property lines, contours, utilities, and structures, assembled from survey and public records. All inventory and design layers are drawn over it.

Related: Topographic Survey, Contour Line
Topographic Survey

A field survey that measures ground elevation, boundaries, and physical features of a site, producing contour lines and spot elevations used as the basis for analysis and grading.

Related: Base Map, Benchmark, Contour Line
Contour Line

A line on a map connecting points of equal elevation. Spacing indicates steepness: closely spaced contours mean a steep slope, widely spaced contours a gentle one.

Related: Topographic Survey, Spot Elevation
Benchmark

A fixed point of known elevation, often a brass disk in concrete or a marked monument, from which surveyors and graders measure every other elevation on a project.

Related: Topographic Survey, Spot Elevation
Slope Analysis

A mapped study dividing a site into ranges of gradient, such as flat, gentle, moderate, and steep, to reveal buildable areas, drainage patterns, and limits on use.

Related: Contour Line, Grading Plan
Viewshed

The area visible from a chosen vantage point, mapped to evaluate what a viewer will see. It guides placement of overlooks, screens, and preserved view corridors.

Related: Slope Analysis
Base Flood Elevation

The elevation of the highest water surface expected during a flood with a one percent chance of occurring in any year, used to regulate construction in mapped floodplains.

Related: Topographic Survey, Detention Basin
Easement

A legal right to use another person's land for a specific purpose, such as utilities, drainage, or access. It limits where structures, paving, and plantings may be placed.

Related: Base Map
Schematic Design

The first design phase, in which rough concepts, bubble diagrams, and simple massing studies explore alternative arrangements of program elements before details are developed.

Related: Design Development, Program
Design Development

The phase after schematic design in which the chosen concept is refined into dimensioned plans, materials, and planting palettes, and the construction budget is checked against the design.

Related: Schematic Design, Plant Palette
Program

A written and graphic statement of what a project must accommodate: users, activities, space sizes, quantities, and relationships. It is the measurable brief against which design options are tested.

Related: Schematic Design
Axis

An imaginary line along which elements are arranged to create order and to direct movement or view. Axes may be formal and straight or implied through a sequence of spaces.

Related: Focal Point, Spatial Enclosure
Focal Point

The feature that draws the eye and anchors a composition, such as a specimen tree, fountain, or sculpture. It gains emphasis through contrast in size, color, or placement.

Related: Axis
Spatial Enclosure

The sense of a defined outdoor room created by walls of vegetation, grade change, buildings, or built elements, measured by the height and openness of the surrounding edges.

Related: Axis
Plant Palette

The selected group of species chosen for a project, defined by hardiness, water needs, mature size, texture, and maintenance, and organized into trees, shrubs, and groundcovers.

Related: Design Development, Planting Schedule
Universal Design

Designing spaces and routes usable by people of all ages and abilities without special adaptation, including accessible grades, firm surfaces, clear widths, and resting places along paths.

Related: Spatial Enclosure
Grading Plan

A drawing that shows existing and proposed elevations, spot grades, contours, and drainage patterns, and specifies how the ground will be cut, filled, and shaped.

Related: Spot Elevation, Cut and Fill, Daylight Line
Spot Elevation

A point on a drawing marked with its exact existing or finished elevation, used where contours alone cannot convey the intended grade, such as at paving edges or drainage structures.

Related: Contour Line, Grading Plan
Cut and Fill

The process of removing soil from high areas (cut) and placing it in low areas (fill) to achieve proposed grades, ideally balanced on site so no soil is hauled away or imported.

Related: Daylight Line, Grading Plan
Daylight Line

The line where a proposed slope meets the existing ground surface. It defines the limit of grading and the footprint of cut or fill on a plan.

Related: Cut and Fill, Slope Ratio
Swale

A shallow, gently sloped channel, usually vegetated, that carries and slows stormwater across a site. Swales reduce runoff volume and peak flow compared with piped drainage.

Related: Slope Ratio, Detention Basin
Slope Ratio

A way of expressing steepness as horizontal distance to vertical rise, such as 3:1 for three units horizontal to one unit vertical, used to specify stable and maintainable grades.

Related: Cut and Fill, Swale
Rational Method

A standard equation, Q = CiA, that estimates peak stormwater runoff from a small drainage area using rainfall intensity, a runoff coefficient, and the area draining to the point.

Related: Detention Basin, Swale
Detention Basin

A depression that temporarily stores stormwater and releases it slowly through a control structure, reducing peak flows downstream after a storm.

Related: Rational Method, Invert Elevation
Invert Elevation

The elevation of the lowest inside surface of a pipe or channel at a given point, used to calculate slope, flow capacity, and connections between drainage structures.

Related: Detention Basin, Rational Method
Planting Schedule

A table on the planting plan listing plant symbols, botanical and common names, size, quantity, spacing, and remarks, tying each drawn symbol to the written specification.

Related: Plant Palette, Three-Part Specification
Three-Part Specification

A standardized format organizing each product section into General, Products, and Execution parts, so contractors find administrative requirements, materials, and installation instructions in predictable places.

Related: Submittal, Planting Schedule
As-Built Drawings

Contractor-marked records showing the actual installed location, size, and materials of constructed work, used by the owner for future maintenance, renovation, and record keeping.

Related: Substantial Completion, Grading Plan