AR Landscape study materials
AR Landscape study resources

AR Landscape study plan

AR Landscape · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Grading, Drainage, and Construction Documentation

  • Compute slope, gradient, and percent grade between contour lines across 20 practice problems, showing every arithmetic step.

  • Convert landform into contours by drawing proposed 2% and 5% grading solutions for three small sites and checking that they tie into existing grades.

  • Interpret contour intervals, spot elevations, and hachures to locate high points, swales, ridges, and drainage divides on unfamiliar maps.

  • Sketch cut-and-fill sections at three locations to verify that proposed surfaces balance against existing topography.

Your checkpoint

A bound worksheet of 20 fully solved slope and contour problems plus three hand-drawn grading plans, self-scored at 85% or better with corrections noted.

Week 2

Grading, Drainage, and Construction Documentation

  • Size a stormwater management train - vegetated swale, detention basin, and outlet - for a one-acre example using the rational method.

  • Calculate runoff coefficients, time of concentration, and required storage volume for two worked drainage examples.

  • Assemble a construction document checklist covering plan sheets, general notes, details, specifications, and bidding requirements.

  • Draft three construction details from memory - a curb transition, a retaining wall section, and a tree pit - then audit each against standard practice.

Your checkpoint

A one-page drainage calculation summary for two sites, a 40-item construction document checklist, and three hand-drafted details with self-critique notes.

Week 3

Project and Construction Administration

  • Compare design-bid-build, construction management at risk, and design-build across risk allocation, schedule control, and cost certainty.

  • Sequence the construction administration workflow from preconstruction meeting through submittals, RFIs, change orders, pay applications, and closeout.

  • Write a mock RFI response and a field observation report for a described site condition involving a grade discrepancy.

  • Distinguish the landscape architect's authority from the contractor's means-and-methods responsibility during observation and certification.

Your checkpoint

A one-page comparison matrix of four project delivery methods plus a 20-question self-quiz scored at 80% or better, with a written note on each miss.

Week 4

Project and Construction Administration & Grading, Drainage, and Construction Documentation

  • Complete a timed 90-minute practice set drawn only from Domains 1 and 4 and record per-question timing.

  • Rank your ten weakest sub-topics from the missed items, ordered by frequency and confidence level.

  • Re-teach each weak sub-topic by writing a plain-language explanation and one worked example from scratch.

  • Resolve two integrated scenarios that require both a drainage calculation and a change-order judgment call.

Your checkpoint

A timed 60-question practice set with a complete error log and a one-page remediation plan naming each weak topic and its fix.

Week 5

Inventory and Analysis

  • Compile a site inventory checklist spanning physical, biological, cultural, and regulatory data sources and note where each is obtained.

  • Interpret soil survey attributes to derive drainage class, permeability, and bearing implications for planting and structures.

  • Run a three-layer constraint overlay to rank areas of a parcel for development intensity.

  • Apply typical zoning requirements - setbacks, height, lot coverage, and landscape buffers - to a sample parcel and calculate the buildable envelope.

Your checkpoint

A completed inventory and analysis graphic for one hypothetical five-acre parcel showing constraints, opportunities, and three ranked development areas with written rationale.

Week 6

Inventory and Analysis & Design

  • Translate a written program into a bubble diagram and adjacency matrix, then into a scaled schematic plan.

  • Justify three schematic design decisions in writing by tying each one to a specific documented site constraint.

  • Apply accessibility criteria to a circulation layout: running slope, cross slope, clear width, landings, and ramp transitions.

  • Compare two schematic alternatives against the program and select one with a documented, criteria-based rationale.

Your checkpoint

A schematic design package for the five-acre parcel containing the program, diagrams, scaled plan, and a one-page design rationale referencing site analysis findings.

Week 7

Design

  • Select plant species by matching cultural requirements - light, moisture, soil pH, and hardiness - to mapped site conditions.

  • Design a planting plan that satisfies screening, canopy cover, and low-water performance goals simultaneously.

  • Integrate the stormwater strategy into the site plan so grading, planting, and circulation reinforce one another rather than conflict.

  • Assemble a materials palette and detail a typical paving section and wall section that each resolve a grade change.

Your checkpoint

A planting plan with a 20-species schedule and a companion materials and detail sheet, each reviewed line by line against the design program.

Week 8

Project and Construction Administration & Inventory and Analysis & Design & Grading, Drainage, and Construction Documentation

  • Sit two full-length timed practice exams and score each one by domain to expose residual gaps.

  • Drill the 20 most frequently missed concepts using flashcards and fresh worked problems until each is correct twice in a row.

  • Audit the accumulated error log and close out every previously missed topic with a dated confirmation note.

  • Rehearse exam-day logistics: question pacing, break timing, and reference or calculator handling.

Your checkpoint

Two scored full-length practice exams plus a one-page readiness summary showing per-domain accuracy of 75% or better and a short list of last-week review items.

Milestones

Week 2: Complete all 20 slope and contour problems at 85% or better, and produce a full drainage calculation for at least one site without consulting notes for the formulas.

Week 4: Score 70% or better on the timed Domain 1 and Domain 4 practice set, with an error log that names a specific cause for every miss.

Week 6: Produce a schematic package that satisfies every stated program element and passes a self-check on accessibility slopes, widths, and landings.

Week 8: Reach 75% or better per domain on both full-length practice exams, with no previously logged weak topic still unresolved on the error log.