AR Plumber study materials
AR Plumber study resources

AR Plumber study plan

AR Plumber · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Sanitary Drainage Systems

  • Compute fixture-unit loads for a building drain, building sewer, and every branch interval in a two-story dwelling

  • Calculate developed length of a drainage run and verify that each horizontal section meets its required slope

  • Determine pipe size and fitting type at each change of direction, and identify prohibited drainage fittings and configurations

  • Lay out a complete sanitary drainage system in isometric view for a three-fixture-group house, labeling every size and slope

Your checkpoint

A labeled drainage isometric for a two-story dwelling with every pipe size, slope, and fitting annotated, plus a fixture-unit calculation worksheet showing each branch load

Week 2

Sanitary Drainage Systems & Water Supply and Distribution Systems

  • Diagnose and correct five common drainage layout errors, including improper stack-to-drain connections and inadequate cleanout placement

  • Convert water supply fixture-unit demand to probable flow in gallons per minute for a single-family service

  • Size a water service, main, and branch lines from a given fixture-unit load and developed length

  • Select pipe material for supply and distribution and state the approved joining method for each

Your checkpoint

A completed sizing worksheet for a 2.5-bath dwelling giving service size, main size, and branch sizes with a written justification for each number

Week 3

Water Supply and Distribution Systems & Vents and Venting Systems

  • Size vents from drainage fixture units and developed length for stacks, branches, and individual fixtures

  • Distinguish common, individual, wet, circuit, and stack vents, and select the correct type for each fixture in a given layout

  • Verify vent terminal locations against required clearances from openings, air intakes, and property lines

  • Trace a vent system from each trap to open air and identify every point where a vent is improperly combined

Your checkpoint

A venting diagram for a two-bath layout showing vent type, size, and connection point for each fixture, with a one-line justification per vent

Week 4

Vents and Venting Systems & Plumbing Mathematics, Sizing, and Isometric Analysis

  • Solve 45-degree and 22.5-degree offset problems, computing travel, run, and fitting take-out for each

  • Convert between fixture units, gallons per minute, pipe diameter, and velocity using standard formulas

  • Read a blank isometric and derive every pipe size from the fixture-unit table without referencing a completed drawing

  • Work time-limited calculation sets so that sizing decisions take under three minutes per problem

Your checkpoint

Two blank-sheet isometrics completed in 30 minutes each with correct sizes, plus a 25-question timed math set scored at 80 percent or higher with worked solutions for every miss

Week 5

Arkansas Plumbing Law, Rules, and Licensing Requirements & Plumbing Fixtures, Faucets, and Fixture Fittings

  • Outline the Arkansas plumbing licensing sequence: apprentice registration, journeyman eligibility, master eligibility, and renewal obligations

  • Identify who may pull a plumbing permit, who may supervise work, and what triggers disciplinary action under state rules

  • Set minimum fixture counts and clearances for a given occupancy type, including water closet, lavatory, and bathtub spacing

  • Verify installation requirements for fixture fittings, water closet connections, and floor-mounted versus wall-mounted support

Your checkpoint

A two-page compliance packet: one page of Arkansas licensing and supervision steps in sequence, one page of a bathroom fixture layout meeting all spacing and clearance minimums

Week 6

Traps, Interceptors, and Backflow Prevention & General Regulations, Permits, and Code Administration

  • Select the correct trap for each fixture and verify trap seal depth, distance to vent, and protection against siphonage

  • Classify six cross-connection scenarios and specify air gap, reduced pressure principle assembly, pressure vacuum breaker, or double check valve for each

  • Size a grease interceptor and a sand/oil interceptor for given fixture discharge rates

  • Sequence the permit and inspection process from application through final approval, naming who may perform each step

Your checkpoint

A backflow protection decision matrix covering six scenarios with justification per row, plus a permit-to-final inspection timeline for a residential remodel

Week 7

Water Heaters and Temperature Control & Special Systems: Storm Drainage, Fuel Gas Piping, and Specialty Plumbing

  • Size a water heater for a given dwelling and compute recovery rate and temperature rise

  • Specify the relief valve rating, discharge pipe material, and termination point for a water heater installation

  • Size vertical storm conductors and horizontal storm drains from roof area and rainfall rate

  • Compute fuel gas pipe size from appliance Btu input, run length, and gas specific gravity using the longest-length method

Your checkpoint

A water heater installation spec sheet covering capacity, relief valve, and discharge routing, plus a gas pipe sizing calculation for a three-appliance run

Week 8

Arkansas Plumbing Law, Rules, and Licensing Requirements & General Regulations, Permits, and Code Administration & Plumbing Mathematics, Sizing, and Isometric Analysis & Water Supply and Distribution Systems & Plumbing Fixtures, Faucets, and Fixture Fittings & Sanitary Drainage Systems & Vents and Venting Systems & Traps, Interceptors, and Backflow Prevention & Water Heaters and Temperature Control & Special Systems: Storm Drainage, Fuel Gas Piping, and Specialty Plumbing

  • Complete two full-length timed practice exams and score 80 percent or higher on each

  • Re-work every missed item from weeks 1 through 7 into a single error log keyed by domain

  • Recite from memory the Arkansas licensing sequence and the permit and inspection steps

  • Drill weak domains until no domain scores below 70 percent

Your checkpoint

A final error log with every missed item corrected and annotated, plus score reports from two consecutive full-length practice exams

Milestones

Week 2: Score 75 percent or higher on a 20-question sanitary drainage and water supply sizing quiz with no notes

Week 4: Produce a complete drainage and venting isometric from a blank sheet in 30 minutes with all pipe sizes correct

Week 6: Correctly classify 90 percent or more of backflow scenarios and licensing facts on a mixed 30-question set

Week 8: Two consecutive full-length practice exams at 80 percent or higher overall, with no single domain below 70 percent