ARC · Keep the key ideas within reach.

Quick reference

Project and Program Management Fundamentals

  • A project is a temporary endeavor producing a unique product, service, or result; a program is a group of related projects managed together for coordinated benefits.

  • Project life cycle phases (initiation, planning, execution, monitoring/controlling, closing) are governance structures, not the same as the product life cycle.

  • A project manager authorizes and balances the triple constraint: scope, schedule, and cost, with quality and risk as mediating factors.

  • Program management focuses on benefit realization across projects; portfolio management selects and prioritizes the mix of programs and projects.

  • A PMO can be supportive (templates and coaching), controlling (compliance required), or directive (manages projects directly).

  • Organizational structures range from functional (PM has little authority) to projectized (PM has high authority); matrix structures split authority between PM and functional manager.

  • A deliverable is any unique verifiable product or capability produced to complete a process, phase, or project.

  • A stakeholder is any individual or group that can affect or be affected by the project; project success includes meeting stakeholder expectations, not only the baseline.

Quick reference

Requirements and Scope Definition

  • Scope baseline = project scope statement + work breakdown structure (WBS) + WBS dictionary; it is the approved reference for scope control.

  • The WBS decomposes deliverables into work packages; the 100% rule states the WBS captures all work in scope, no more and no less.

  • A work package is the lowest level of the WBS and can be estimated, scheduled, and assigned; a control account sits above it for cost/schedule tracking.

  • Requirements types include business, stakeholder, solution, functional, and nonfunctional; each should be documented, traceable, and testable.

  • Scope creep is uncontrolled expansion without approved change control; gold plating is adding features not requested.

  • A requirements traceability matrix links requirements to their source, design, and test cases to verify coverage.

  • Validate scope (formal acceptance of deliverables) differs from control quality (verifying correctness); validation precedes formal sign-off.

  • A change request affecting scope must pass integrated change control; approved changes update the scope baseline and are communicated to stakeholders.

Quick reference

Planning and Scheduling

  • Critical path is the longest duration path through the network and determines the shortest possible project duration; it has zero total float.

  • Total float = LS − ES = LF − EF; float is the amount a task can slip without delaying the project finish.

  • A predecessor is a task that must occur before another; four dependency types exist: finish-to-start, start-to-start, finish-to-finish, start-to-finish.

  • Leads advance a successor; lags delay a successor; both are applied to a dependency to reflect real constraints.

  • Schedule compression methods: crashing adds resources for cost; fast tracking overlaps phases and increases risk.

  • A milestone has zero duration and marks a significant event; it is not a work activity.

  • Resource leveling adjusts start/finish dates to resolve resource overallocation, often extending the schedule; resource smoothing adjusts within float without extending it.

  • A Gantt chart shows schedule bars over time; a network diagram shows logical dependencies and the critical path.

  • Rolling wave planning elaborates near-term work in detail while far-term work stays at a higher level.

Quick reference

Budgeting and Cost Control

  • Cost baseline = approved time-phased budget excluding management reserve; it is the reference for measuring cost performance.

  • Planned value (PV) = budgeted cost of work scheduled; earned value (EV) = budgeted cost of work performed; actual cost (AC) = actual cost incurred.

  • Cost variance CV = EV − AC (positive is favorable); schedule variance SV = EV − PV (positive is ahead of schedule).

  • Cost performance index CPI = EV / AC; schedule performance index SPI = EV / PV; values above 1.0 are favorable.

  • Estimate at completion EAC = BAC / CPI (typical variance) or AC + (BAC − EV) (atypical variance); ETC = EAC − AC.

  • Variance at completion VAC = BAC − EAC; a negative VAC indicates projected overrun.

  • Bottom-up estimating aggregates detailed work-package estimates; analogous estimating uses historical data from similar projects; parametric uses a unit rate.

  • Contingency reserve covers identified risks; management reserve covers unknown-unknowns and is held above the cost baseline.

  • Sunk costs are excluded from forward-looking decisions; only future costs and benefits are relevant to go/no-go choices.

Quick reference

Risk and Issue Management

  • Risk is an uncertain event that may affect objectives; an issue is a risk that has occurred and requires active management.

  • Risk management process: plan, identify, perform qualitative analysis, perform quantitative analysis, plan responses, implement responses, monitor.

  • Qualitative analysis ranks risks by probability and impact; a probability-impact matrix assigns a risk score.

  • Expected monetary value EMV = probability × impact; used to compare risk exposure and set contingency reserves.

  • Positive-risk (opportunity) strategies: exploit, enhance, share, accept; negative-risk (threat) strategies: avoid, mitigate, transfer, accept, escalate.

  • Risk register records risk ID, description, probability, impact, score, owner, response, and status.

  • A risk owner is accountable for monitoring a risk and executing its response; a risk response owner implements the specific action.

  • Residual risk remains after a response; secondary risk is a new risk created by a response.

  • Decision tree analysis compares options using EMV across branches to select the lowest expected cost or highest expected value.

Quick reference

Stakeholder and Communications Management

  • Stakeholder power/interest grid classifies stakeholders by authority and concern to tailor engagement strategy.

  • Stakeholder engagement levels: unaware, resistant, neutral, supportive, leading; the plan defines current and desired levels.

  • Communication models include sender, encoding, message, medium, decoding, receiver, and feedback; noise disrupts the message.

  • Communication methods: interactive (meetings), push (email, reports), pull (portals, repositories); choice depends on urgency and audience.

  • Communication channels formula: n(n − 1)/2, where n is the number of stakeholders.

  • The communications management plan defines who receives what information, in what format, frequency, and via which channel.

  • Formal written communication suits contracts and approvals; informal verbal suits team coordination and rapid feedback.

  • Active listening, feedback, and confirmation of understanding reduce miscommunication; cross-cultural awareness affects encoding and decoding.

Quick reference

Quality and Performance Monitoring

  • Quality management: plan quality, manage quality (assurance), control quality (inspection and testing of deliverables).

  • Prevention over inspection: cost of prevention and appraisal (conformance) is lower than cost of internal/external failure (nonconformance).

  • Quality is conformance to requirements and fitness for use; grade is a category of technical characteristics and differs from quality.

  • Cause-and-effect (fishbone) diagram identifies root causes; Pareto chart prioritizes the vital few causes by frequency.

  • Control charts track process variation; points outside control limits or nonrandom patterns signal an out-of-control process.

  • Statistical sampling inspects a subset to draw conclusions about a population; larger samples increase confidence.

  • Performance monitoring uses KPIs, earned value metrics, and audits to compare actual performance against baselines and trigger corrective action.

  • A quality audit is a structured independent review to verify processes comply with the quality management plan.

  • The seven basic quality tools: cause-and-effect, flowchart, check sheet, Pareto, histogram, control chart, scatter diagram.

Quick reference

Ethics, Governance, and Professional Responsibility

  • Core professional ethics: responsibility, respect, fairness, and honesty; these govern conduct toward stakeholders and the public.

  • Governance defines the framework of authority, decision rights, and oversight; it is distinct from day-to-day project management.

  • A code of conduct requires disclosure of conflicts of interest and avoidance of gifts or benefits that could influence decisions.

  • Ethical decisions must consider legal requirements, organizational policy, and the public interest; when in doubt, escalate through proper channels.

  • Whistleblowing is escalating illegal or unethical conduct to appropriate authorities after internal channels fail.

  • Governance boards or steering committees approve baselines, major changes, and stage-gate decisions.

  • Accurate reporting of project status is an ethical obligation; misrepresenting progress or cost violates honesty and integrity.

  • Professional responsibility includes maintaining competence, respecting confidentiality, and following applicable laws and regulations.

  • Sustainability and stewardship require balancing economic, social, and environmental impacts in project decisions.