ARE 5.0: PDD study materials
ARE 5.0: PDD study resources

ARE 5.0: PDD cheat sheet

ARE 5.0: PDD · Keep the key ideas within reach.

Quick reference

Practice Management

  • Break-even multiplier equals 1.0 plus the overhead (indirect) rate; a net multiplier below that value produces a loss, above it produces profit.

  • Utilization rate = direct billable labor hours / total paid hours; professional firms commonly target roughly 65-80% depending on staff role.

  • AIA B101 is Owner-Architect; A101 is Owner-Contractor; A201 is the General Conditions; B102 is Owner-Architect without a predefined scope of services.

  • Copyright in instruments of service stays with the architect; the owner receives a nonexclusive license to use them for the project.

  • Statute of limitations runs from the date of injury or discovery; statute of repose bars claims a fixed number of years after substantial completion regardless of discovery.

  • Claims-made professional liability policies respond to claims reported during the policy period; occurrence policies respond to negligent acts occurring during the period.

  • Standard of care is the skill and care ordinarily provided by architects under the same or similar circumstances, not the highest possible skill or perfection.

  • Contract types: stipulated sum (lump sum), cost plus fee, and cost plus guaranteed maximum price; a GMP shifts cost-overrun risk above the cap to the contractor.

Quick reference

Project Management

  • Critical path is the longest-duration chain of dependent activities; it has zero total float and any delay along it delays project completion.

  • Total float = LS - ES = LF - EF; free float = early start of the successor minus early finish of the activity.

  • Earned value: CV = EV - AC; SV = EV - PV; CPI = EV / AC; SPI = EV / PV. CPI or SPI below 1.0 signals over budget or behind schedule.

  • Crashing adds labor, equipment, or overtime to critical-path activities to shorten duration at extra cost; fast-tracking overlaps phases and increases risk.

  • A change order is a written modification signed by owner, architect, and contractor; a construction change directive orders work before price and time are agreed.

  • Retainage commonly withholds 5-10% of each payment until substantial completion, then releases per contract terms and lien waivers.

  • A work breakdown structure decomposes scope into work packages, each with an assigned owner, duration, and cost code for tracking.

  • Risk responses are avoid, mitigate, transfer (insurance, bonds, hold-harmless), and accept; the architect does not control contractor means, methods, or site safety.

Quick reference

Programming & Analysis

  • Floor area ratio = total gross floor area / lot area; lot coverage = building footprint / lot area. Zoning caps both.

  • Net-to-gross ratio = net assignable area / gross building area; office efficiency typically falls around 70-80%.

  • IBC occupant load factors (gross): business 150 sf, mercantile 60 sf, residential 200 sf, storage 300 sf; assembly unconcentrated 15 net, concentrated 7 net; educational 20 net.

  • Two means of egress are generally required where occupant load reaches 50; travel distance limits are commonly 200-250 ft for business occupancies depending on sprinklers.

  • Site analysis inputs include topography, soils, solar azimuth and altitude, prevailing winds, views, noise, utilities, and the zoning envelope.

  • The buildable envelope is the allowed footprint after setbacks and height limits, multiplied by the floor area ratio to test achievable area.

  • Bubble diagrams test adjacencies and relative areas; an adjacency matrix weights required proximity between each pair of spaces.

  • Program documents address goals, facts, needs, and concepts: problem-seeking establishes requirements before problem-solving proposes solutions.

Quick reference

Project Planning & Design

  • IBC allowable area = tabular base area increased for frontage (up to 75%) and for sprinklers (200% multistory, 300% single story).

  • Egress width per occupant: 0.2 in sprinklered and 0.3 in unsprinklered for components other than stairs; stairways 0.3 in sprinklered and 0.4 in unsprinklered.

  • Sabine reverberation time T = 0.05 V / A (imperial), with V in cubic feet and A in sabins; doubling absorption roughly halves T.

  • STC rates airborne sound isolation between spaces, NRC rates absorption within a space, and IIC rates impact isolation of floor-ceiling assemblies.

  • Thermal rule: U = 1/R total, and assembly U-value is the reciprocal of the sum of the layer resistances plus surface films.

  • Passive strategies precede active systems: orientation, insulation, thermal mass, shading, and natural ventilation before mechanical equipment.

  • Sprinkler trade-offs increase allowable height and area, lengthen allowable travel distance, and reduce required fire-resistance ratings.

  • Structural rule of thumb: beam or girder depth approximates span/20 to span/12 for steel and concrete; wood joists are sized from span tables.

Quick reference

Project Development & Documentation

  • CSI MasterFormat organizes specifications and cost data into numbered divisions, with Division 00 for bidding and Division 01 for general requirements.

  • SectionFormat organizes each specification section into Part 1 General, Part 2 Products, and Part 3 Execution.

  • Typical order of precedence: agreement, general conditions, supplementary conditions, specifications, drawings; drawings govern quantity, dimension, and location.

  • Drawing scale conventions: site plan 1"=20' or 1:200, floor plans 1/8"=1'-0", enlarged plans 1/4"=1'-0", details 3/4" to 1-1/2"=1'-0".

  • Estimate accuracy narrows through design: schematic design roughly plus or minus 15-20%, design development plus or minus 10%, construction documents plus or minus 5%.

  • BIM levels of development: 100 conceptual, 200 approximate geometry, 300 specific design, 350 coordination, 400 fabrication.

  • Specifications govern quality of materials and workmanship; drawings govern quantity, dimension, location, and relationship of components.

  • Clash detection on a federated model resolves MEP, structural, and architectural conflicts before they reach the field.

Quick reference

Construction & Evaluation

  • Bid bond guarantees the bidder will enter the contract; performance bond guarantees completion; payment bond guarantees payment to subcontractors and suppliers.

  • An addendum modifies bidding documents before proposals are received; after award, changes are issued as change orders or construction change directives.

  • Substantial completion means work is sufficiently complete for its intended use; it starts warranties, supports occupancy, and typically triggers retainage release.

  • The punch list records incomplete or defective work observed at substantial completion; final payment follows correction and lien waivers.

  • Liquidated damages are a pre-agreed per-day amount for delay representing the owner's estimated loss and are enforceable only if not a penalty.

  • The architect reviews pay applications against observed work and the schedule of values; certification does not guarantee the contractor's compliance.

  • Architect site visits observe progress and quality for the owner; the architect does not supervise means, methods, or site safety.

  • Under AIA A201, mediation is typically a condition precedent to arbitration or litigation, and claims must be initiated within the stated claim period.