ARE 5.0: PDD study materials
ARE 5.0: PDD study resources

ARE 5.0: PDD study plan

ARE 5.0: PDD · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Practice Management

  • Compare sole proprietorship, partnership, LLC, and corporation on liability, taxation, and continuity, then choose a hypothetical firm structure and justify the choice in writing.

  • Build a spreadsheet that calculates hourly, fixed, and percentage-of-construction-cost fees for a sample $4 million project and compare net revenue across the three methods.

  • Write 15 flashcards covering licensure pathways, continuing education, professional ethics, and standard-of-care obligations, then self-quiz until all 15 are recalled cold.

  • Draft a firm risk-management checklist with at least 10 items spanning contracts, quality control reviews, insurance coverage, and documentation retention.

Your checkpoint

A two-page firm operations brief containing the entity comparison table, the populated fee spreadsheet with three fee-method results, and the completed 15-card deck plus risk checklist.

Week 2

Practice Management & Project Management

  • Diagram the five project delivery phases side by side, listing the owner and architect deliverables and the typical billing percentage for each phase.

  • Summarize in your own words the key terms of an owner-architect agreement: scope, compensation, schedule, termination, indemnification, and dispute resolution.

  • Construct a project budget and a milestone-level schedule for a sample project, then identify the three assumptions most likely to invalidate each one.

  • Build a risk register with eight project risks, each scored by likelihood and impact and paired with a specific mitigation action.

Your checkpoint

A one-page project management plan for a sample project containing the phase diagram, a budget and milestone schedule, and the completed eight-row risk register.

Week 3

Programming & Analysis

  • Analyze a hypothetical site by listing zoning setbacks, height limits, floor area ratio, lot coverage, and parking requirements, then compute the maximum allowable building envelope.

  • Write a 15-line item program for a small mixed-use building, complete with net and gross area tabulation and a stated net-to-gross efficiency assumption.

  • Compute occupant loads, required egress width, and plumbing fixture counts from that program using code tables you cite by section.

  • Build an adjacency matrix and convert it into a bubble diagram that satisfies every required relationship without a single conflict.

Your checkpoint

A program document containing the area tabulation, the site constraint summary with computed envelope, the occupancy and fixture calculations, and the finished adjacency matrix with bubble diagram.

Week 4

Programming & Analysis & Project Planning & Design

  • Translate the week 3 program into three block diagrams and test each against the adjacency matrix, rejecting any option with an unresolved conflict.

  • Test two massing options against the zoning envelope and document which option wins on daylight, egress efficiency, and constructability.

  • Assemble a sustainability checklist covering envelope, glazing, HVAC strategy, and water use, and mark which items carry cost premium.

  • Explain in writing how programming decisions cascade into planning decisions, using two specific examples from your own diagrams.

Your checkpoint

A schematic design package with three block diagrams, two massing studies with a written selection rationale, and the annotated sustainability checklist.

Week 5

Project Planning & Design

  • Develop floor plans for the selected massing option that satisfy egress travel distance, exit access, and exit separation requirements, citing each code section used.

  • Recalculate occupant load, egress width, and stair count for the developed plans and reconcile any difference from the week 3 figures.

  • Audit the plans for accessibility: route, door clearances, turning space, and fixture clearances, and correct every deficiency you find.

  • Draft a code-compliance matrix that maps each applicable requirement to the specific drawing where it is resolved.

Your checkpoint

A code-compliance matrix covering egress, accessibility, occupancy, and fire separation, with the corrected floor plans that resolve every flagged item.

Week 6

Project Development & Documentation

  • Assemble a 20-sheet drawing set index organized by discipline and phase, and write a one-sentence purpose statement for each sheet.

  • Draw three details: a wall section at the roof, a window head and sill, and a foundation transition, each annotated with materials, dimensions, and a reference to a specification section.

  • List 15 specification sections with their correct division numbers and state which drawing sheet coordinates with each.

  • Write a consultant coordination memo identifying five clashes between architectural, structural, and mechanical information and the resolution for each.

Your checkpoint

A mock design-development set consisting of the 20-sheet index, three fully annotated details, the 15-section specification list, and the coordination memo.

Week 7

Construction & Evaluation & Project Development & Documentation

  • Write a site observation report on a hypothetical construction visit, noting five conditions and classifying each as conforming, deficient, or requiring clarification.

  • Review a sample submittal against the specification, then draft an approval, approve-as-noted, or reject response with written justification.

  • Prepare a ten-item punch list from a hypothetical substantial completion walkthrough and rank the items by whether they block occupancy.

  • Evaluate a sample payment application by computing percent complete, retainage, and stored materials, then write the certificate for payment.

Your checkpoint

A construction-phase binder containing the observation report, the marked-up submittal review, the ranked ten-item punch list, and the completed payment certification with calculations.

Week 8

Practice Management & Project Management & Programming & Analysis & Project Planning & Design & Project Development & Documentation & Construction & Evaluation

  • Complete two full-length timed practice exams under test conditions and record your score, timing per section, and every item you flagged as uncertain.

  • Build a remediation log for every missed item: the correct concept, why you missed it, and the domain it belongs to.

  • Re-quiz all flashcards from weeks 1 through 7 and retire only those you answer correctly twice in a row.

  • Write a one-page exam-day plan covering pacing targets, strategy for calculation items, and how you will handle items to revisit.

Your checkpoint

A score report for both practice exams with a completed remediation log and a final one-page exam-day pacing and strategy plan.

Milestones

Week 2: Score at least 70% on a 30-item practice set drawn only from Practice Management and Project Management, and confirm the project management plan contains a budget, a schedule, and a scored risk register.

Week 4: Score at least 70% on a 40-item practice set covering Programming and Analysis plus Project Planning and Design, and confirm the schematic package proves every adjacency and zoning constraint is satisfied.

Week 6: Score at least 70% on a 30-item practice set covering Project Development and Documentation, and confirm the mock set includes a complete sheet index, three annotated details, and a coordinated specification list.

Week 7: Demonstrate accurate calculation of percent complete, retainage, and payment amount on the sample application, and confirm the observation report and submittal review each use correct terminology.

Week 8: Achieve at least 75% on both full-length timed practice exams with no single domain below 65%, and confirm the remediation log has an entry for every missed item.