32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Net multiplier
Net revenue divided by direct labor cost. Comparing it to the break-even multiplier (1.0 plus the overhead rate) shows whether the project or firm is earning a profit.
Utilization rate
Direct billable labor hours divided by total paid hours. A measure of staff productivity; firms commonly target roughly 65 to 80 percent, higher for technical staff.
Break-even multiplier
One plus the overhead rate. Revenue at this multiple covers direct labor and overhead but yields no profit; billing below it produces a loss.
Standard of care
The skill and care ordinarily exercised by architects practicing under similar circumstances in the same locality. It does not require the highest possible skill or perfection.
Claims-made liability policy
Professional liability coverage that responds to claims reported during the policy period regardless of when the negligent act occurred, provided retroactive coverage applies.
Statute of repose
A statute that bars any claim after a fixed number of years from substantial completion, regardless of when the injury was discovered or the limitation period started.
Critical path
The longest-duration chain of dependent activities through the schedule. It has zero total float, and any delay in it delays the project completion date.
Total float
The amount of time an activity can be delayed without delaying the project finish; equals late start minus early start, or late finish minus early finish.
Cost performance index
Earned value divided by actual cost. A CPI below 1.0 indicates the work performed cost more than budgeted; above 1.0 indicates under budget.
Construction change directive
A written directive from the owner, prepared by the architect, ordering a change before the contractor and owner agree on price and time adjustment.
Fast-tracking
Overlapping design and construction phases, or overlapping construction phases, to shorten delivery time. It increases coordination risk and often raises cost.
Floor area ratio
Total gross floor area of all buildings on a site divided by the site area. Zoning uses FAR to cap the density of development.
Net-to-gross ratio
Net assignable area divided by gross building area. It measures planning efficiency; office buildings commonly achieve 70 to 80 percent.
Occupant load
The number of people a space is designed to hold, calculated by dividing floor area by the occupancy load factor from the building code.
Adjacency matrix
A grid that rates required proximity between pairs of programmed spaces, used to test bubble diagrams and stacking before drawings are developed.
Zoning building envelope
The three-dimensional volume within which a building may be built, defined by setbacks, height limit, floor area ratio, and lot coverage.
Reverberation time
The time in seconds for sound to decay 60 decibels after the source stops. Estimated with the Sabine formula, T equals 0.05 times volume divided by absorption.
Sound transmission class
A single-number rating of how well a wall, floor, or assembly blocks airborne sound. Higher ratings mean more isolation between adjacent spaces.
Egress width factor
Code minimum width per occupant: 0.2 inch in sprinklered buildings and 0.3 inch unsprinklered for components other than stairs; stairs are wider.
Daylight factor
The ratio of interior illuminance at a point to simultaneous exterior illuminance under an unobstructed overcast sky, expressed as a percentage.
Passive solar heating
Using orientation, glazing, thermal mass, and shading to collect and store winter sun while rejecting summer sun, before resorting to mechanical systems.
Allowable building area
The maximum floor area permitted per story, from code tables based on construction type and occupancy, increased for frontage and sprinklers.
MasterFormat
CSI's standardized numbering system for construction specifications and cost data, organized into divisions such as 03 Concrete and 26 Electrical.
Three-part specification section
SectionFormat organizes each specification section as Part 1 General, Part 2 Products, and Part 3 Execution, so requirements appear in consistent locations.
Order of precedence
The contractual hierarchy for resolving conflicts among documents, typically agreement, conditions, specifications, and drawings, with drawings governing quantity and location.
Shop drawing
A contractor-prepared drawing showing fabrication, installation, or assembly details for a specific product, reviewed by the architect for design concept compliance.
Level of development
A BIM classification from 100 to 500 describing how much geometric and information detail a model element contains at a given project phase.
Performance bond
A surety guarantee that the contractor will complete the work per the contract; the surety pays the owner's cost to finish if the contractor defaults.
Substantial completion
The stage when work is sufficiently complete for the owner's intended use. It starts warranties, allows occupancy, and typically triggers retainage release.
Punch list
A list of incomplete, defective, or missing items identified at substantial completion that the contractor must correct before final payment.
Liquidated damages
A pre-agreed amount per day of delay deducted from payment, representing the owner's estimated losses; enforceable only if it is not a penalty.
Addendum
A written modification to the bidding documents issued before proposals are received, used to clarify, correct, or add information to drawings and specifications.