Question 1Practice Management
An architect proposes a lump-sum fee for a defined scope of basic services. If the project scope does not change, how is the architect's compensation determined under this arrangement?
- The architect receives the agreed fee plus reimbursable payroll costs.
- The agreed fee is paid regardless of hours worked. Correct answer.
- The architect receives payment only for hours recorded on the project.
- The architect receives a percentage of construction cost at completion.
Explanation
A lump-sum fee is a fixed price for a defined scope. The architect bears the risk that actual effort may exceed the estimate, and the owner does not pay more solely because hours increase. Payment is not tied to hourly records or construction cost unless the contract says otherwise.
Question 2Practice Management
During construction administration, the owner asks the architect to evaluate a contractor's alternative design for a mechanical system. The owner-architect agreement lists basic services and does not include this evaluation. What should the architect do before performing the work?
- Confirm the work as an additional service with written authorization. Correct answer.
- Proceed and absorb the cost as part of basic services.
- Delay all construction observation until the owner pays a deposit.
- Ask the contractor to issue a change order for the architect's fee.
Explanation
Work outside the agreed basic services is an additional service and should be authorized in writing before it is performed. The architect should identify the scope, fee, and schedule impact and obtain the owner's approval. Absorbing the cost or withholding basic services creates contractual and professional risk.
Question 3Practice Management
A claims-made professional liability policy differs from an occurrence policy primarily in which way?
- It covers claims only after the project reaches substantial completion.
- It covers claims reported during the policy period, subject to its terms. Correct answer.
- It covers claims arising from work performed during the policy period only.
- It covers only claims filed while the architect is licensed.
Explanation
Claims-made coverage responds to claims first reported during the policy period, provided the claim arises from covered professional services and any retroactive date is satisfied. Occurrence coverage focuses on when the wrongful act occurred. Because claims may surface years later, architects should understand extended reporting provisions.
Question 4Practice Management
In professional negligence claims, the standard of care for an architect is generally measured by what benchmark?
- The contractor's accepted means, methods, and construction techniques.
- The owner's written expectations for design quality and performance.
- The highest level of skill and care available anywhere in the design industry.
- The skill and care ordinarily used by architects in similar circumstances. Correct answer.
Explanation
Architects are expected to perform with the skill and care ordinarily exercised by members of the profession under similar conditions. This is not a guarantee of perfect results or the highest possible skill. Expert testimony often helps the trier of fact understand that professional standard.
Question 5Practice Management
Under a typical owner-architect agreement, the architect coordinates engineering consultants. Which arrangement best protects the architect's ability to direct and rely on those consultants?
- The architect holds consultant contracts that define their scope. Correct answer.
- The contractor hires the consultants after the design documents are complete.
- The owner contracts directly with the consultants and directs their daily work.
- The consultants report to the construction manager during design.
Explanation
When the architect holds the consultant agreements, the architect can establish scope, schedule, and coordination duties and can manage performance directly. This arrangement also clarifies fee flow and liability. Direct owner-consultant contracts may reduce the architect's control and complicate coordination.
Question 6Practice Management
In a critical path method schedule, what does the critical path represent?
- The activities that carry the highest construction cost.
- The longest dependent chain that sets project duration. Correct answer.
- The permits required before construction can begin.
- The sequence of activities that uses the largest number of workers.
Explanation
The critical path is the longest duration path through the network, considering activity dependencies. Delay on a critical activity generally delays the project finish unless the schedule is adjusted. Activities not on the critical path have float.
Question 7Practice Management
At the schematic design phase, an owner's construction budget should include which item to address unknown conditions and design development?
- The complete list of approved change orders.
- The contractor's final markup for overhead and profit.
- The architect's reimbursable printing costs.
- A contingency for unresolved design and price risk. Correct answer.
Explanation
Early estimates carry uncertainty because design details and market pricing are not final. A contingency allowance reserves budget for that uncertainty and is reduced as risk is retired. It is separate from the architect's reimbursable expenses and contractor change orders.
Question 8Practice Management
A newly formed architecture firm wants to offer architectural services in a state where it is not yet registered. What is the most appropriate first step?
- Begin work and apply for registration after the first project is complete.
- Rely on the individual architect's license without firm registration.
- Confirm state firm registration rules and obtain the certificate. Correct answer.
- Use a contractor's license to authorize the architectural work.
Explanation
Many jurisdictions require a firm to hold a certificate of authorization or firm registration in addition to individual architect licenses. Offering services before meeting those requirements can create legal and disciplinary exposure. The firm should verify the specific state's requirements before contracting for work.
Question 9Practice Management
During competitive bidding, an architect discovers an ambiguity in the bid documents. What is the appropriate action before bid opening?
- Tell only the bidder who asked the question.
- Issue a written addendum to all bidders clarifying the ambiguity. Correct answer.
- Wait until construction begins and resolve it by change order.
- Revise the drawings without notifying bidders.
Explanation
Addenda are written instruments issued before bid opening to clarify or change the bidding documents. They must be distributed to all prospective bidders so that everyone bids on the same information. Selective communication or after-the-fact corrections undermine fairness and can create claims.
Question 10Practice Management
An owner asks an architect to accept a limitation of liability capped at the architect's fee. Which response best reflects a balanced risk-management approach?
- Accept the cap without review because all professional contracts include one.
- Evaluate the cap against project risk and negotiate it with legal counsel. Correct answer.
- Refuse all limitations because architects must retain unlimited liability.
- Replace the cap with a warranty that the design will be error-free.
Explanation
Limitations of liability allocate risk and should be evaluated against the scope, hazards, insurance, and fees of the specific project. A fee-sized cap may be appropriate for some work but inadequate for high-risk projects. Legal counsel can help negotiate wording and coordinate it with professional liability coverage.
Question 11Practice Management
Which documents should an architecture firm retain for projects after substantial completion?
- Only marketing materials sent to the owner.
- Only employee timecards used for payroll.
- Only the contractor's daily reports.
- Contracts, correspondence, drawings, and legally required records. Correct answer.
Explanation
Project records support warranty responses, claims, and professional defense, and retention periods are set by law and contract. A firm should follow a written retention policy that covers both paper and electronic files. Destroying records too early can harm the firm's position in a dispute.
Question 12Practice Management
What is the architect's primary responsibility when reviewing a contractor's shop drawing?
- Confirm that the submittal matches the contractor's schedule.
- Verify that the contractor has priced the submittal correctly.
- Approve the contractor's means and methods of construction.
- Check conformance with the design concept and contract documents. Correct answer.
Explanation
Shop drawing review is generally limited to checking whether the submittal conforms to the design concept and the information in the contract documents. The contractor remains responsible for means, methods, scheduling, and coordination. The architect's review does not relieve the contractor of those duties.
Question 13Practice Management
Which quality-control practice best reduces the risk of errors in a set of construction documents?
- Send the documents directly to the contractor for review before bidding.
- Rely on the project architect to check their own work at the end.
- Have a qualified reviewer independent of the design team check the documents. Correct answer.
- Reduce drawing detail so fewer items can be wrong.
Explanation
Independent review brings fresh eyes and helps catch inconsistencies that the author may overlook. A structured checking process should cover drawings, specifications, and coordination among disciplines. Self-review alone is less reliable because authors tend to see what they intended.
Question 14Practice Management
A firm calculates utilization as direct billable hours divided by total paid hours. If an architect works 40 paid hours per week and records 30 hours on billable projects, what is the utilization rate?
- 30 percent
- 133 percent
- 80 percent
- 75 percent Correct answer.
Explanation
Utilization is billable hours divided by total paid hours, so 30 divided by 40 equals 0.75, or 75 percent. The measure helps a firm assess how much staff time is recovered through fees. Nonbillable time still requires management because it consumes overhead.
Question 15Practice Management
In a cost-based fee proposal, what does a multiplier applied to direct labor cost typically recover?
- The contractor's general conditions and bond premium.
- Overhead and profit in addition to direct labor. Correct answer.
- Only the architect's state licensing fee.
- Only the consultant's reimbursable expenses.
Explanation
A labor multiplier converts direct salary cost into a billing rate that recovers overhead and provides profit. The multiplier should be supported by the firm's financial data and the project's expected effort. It is separate from reimbursable expenses and construction costs.
Question 16Practice Management
Which contract provision most directly helps an architect manage the risk of performing work outside the agreed scope?
- A broad indemnity favoring the owner.
- A written additional-services clause with a fee method. Correct answer.
- A clause allowing the owner to stop work at any time.
- An oral agreement to discuss fees later.
Explanation
A clear additional-services provision defines how out-of-scope work is authorized and compensated. Written authorization prevents disputes about whether the architect volunteered the work or expected payment. The fee method can be hourly, lump sum, or another agreed basis.
Question 17Practice Management
In design-build delivery, which characteristic most affects the architect's role compared with traditional design-bid-build?
- The architect serves as the owner's independent construction manager.
- The architect always contracts directly with the owner and has no construction contact.
- The architect must prepare complete documents before any builder is selected.
- The architect may work for the design-build entity and coordinate with construction. Correct answer.
Explanation
In design-build, one entity holds responsibility for both design and construction, and the architect may be a subcontractor or team member. This can integrate design and construction knowledge but may limit the architect's independent owner advocacy. Contract structure and the owner's criteria determine the exact role.
Question 18Practice Management
When preparing a project budget, which cost should be classified as a soft cost?
- Landscaping and site paving.
- Concrete and reinforcing steel.
- Labor to install mechanical equipment.
- Architectural and engineering fees. Correct answer.
Explanation
Soft costs include professional services, permits, financing, legal work, and other nonconstruction expenses. Construction materials and installed labor are hard costs. Proper classification helps the owner control the total project budget.
Question 19Practice Management
A construction change directive directs the contractor to proceed with work before the owner and contractor agree on price. How does it differ from a change order?
- It is issued only by the contractor.
- It replaces the original contract documents entirely.
- It requires no adjustment to the contract sum or time.
- It authorizes work while cost and time are resolved later. Correct answer.
Explanation
A construction change directive is a written order that directs a change while the owner and contractor have not agreed on price or time. It allows the work to proceed and provides a method for later determination of adjustment. A change order, by contrast, is a signed agreement to the adjusted terms.
Question 20Practice Management
Under a typical owner-architect agreement, what is the effect of termination for convenience on the architect's compensation?
- The architect is paid for services performed and authorized costs. Correct answer.
- The architect receives only the retainer paid at signing.
- The architect must refund all payments made before termination.
- The architect forfeits all fees already earned.
Explanation
Termination for convenience allows the owner to end the agreement when the project no longer proceeds, but it does not eliminate payment for work already performed. The architect is generally entitled to compensation for services and reimbursable costs through the termination date. The agreement may also address demobilization or other closeout costs.
Question 21Practice Management
Which practice best supports accurate hourly billing on an architectural project?
- Use rounded full-day entries for each project.
- Reconstruct time from memory at the end of each month.
- Record time daily by project and task in a consistent system. Correct answer.
- Bill all staff time at the same rate regardless of task.
Explanation
Contemporaneous time records are more accurate and defensible than reconstructing time later. Consistent task codes help the firm manage effort, invoice clients, and improve future fee estimates. Daily entry reduces lost billable time and billing disputes.
Question 22Practice Management
How does negotiated contractor selection typically differ from open competitive bidding?
- The owner can discuss price, schedule, and qualifications. Correct answer.
- The owner must select the lowest responsible bidder by law.
- The contractor's fee is always a fixed percentage of construction cost.
- The contractor is selected before the architect is hired.
Explanation
Negotiated selection allows the owner to evaluate qualifications and discuss terms with one or more contractors rather than accepting only the low bid. It can support early contractor involvement and better cost control. Open bidding is generally structured to award to the lowest responsive responsible bidder.
Question 23Practice Management
An architect learns that a contractor on a project is owned by the architect's spouse. What is the most appropriate action?
- Keep the relationship private because it is a family matter.
- Award the contract to the spouse's firm to keep pricing simple.
- Disclose the relationship and follow the client's conflict procedures. Correct answer.
- Resign from the project without explaining the reason.
Explanation
Architects should avoid conflicts of interest and should disclose any relationship that could affect professional judgment. Written disclosure allows the client to evaluate the situation and decide how to proceed. Concealing the relationship can violate ethics rules and erode trust.
Question 24Practice Management
What is the architect's typical role in determining substantial completion?
- Evaluate the work and certify the date when it is sufficiently complete. Correct answer.
- Guarantee that every punch-list item and warranty is finished before certification.
- Set the contractor's final payment amount without any owner review or approval.
- Assume ownership and operational responsibility for the completed building.
Explanation
Substantial completion occurs when the work is sufficiently complete for its intended use, even if minor items remain. The architect typically inspects, evaluates the work with the owner and contractor, and certifies the date. Certification triggers warranty periods and other contract consequences but does not transfer ownership.
Question 25Practice Management
A firm is deciding whether to pursue a project that would require expertise it does not currently have. Which analysis is most relevant to the go/no-go decision?
- The color scheme used in the firm's marketing materials.
- The number of employees the firm hired last year.
- The firm's ability to staff and deliver the work profitably. Correct answer.
- The distance from the firm's office to the nearest airport.
Explanation
A go/no-go decision should weigh strategic fit, available expertise, staffing capacity, fee potential, and risk. Pursuing work beyond the firm's competence can harm quality and profitability. Marketing appearance and unrelated logistics are not sufficient criteria by themselves.
Question 26Practice Management
An architecture firm is comparing professional liability policies. Which statement describes a claims-made policy?
- It pays only after the firm's general liability limit is used.
- It excludes claims involving construction cost overruns.
- It covers only negligent acts that occur during the policy term.
- It responds to claims reported while the policy is in force. Correct answer.
Explanation
A claims-made policy is triggered by the date a claim is made or reported, not the date of the negligent act. The policy must be in force when the claim is reported, and extended reporting coverage may be needed after the policy ends. Occurrence policies, by contrast, respond based on when the act occurred.
Question 27Practice Management
An owner asks an architect to set the fee as a percentage of construction cost. Which risk does this method create for the architect?
- The fee can decrease if the budget is cut while the scope stays the same. Correct answer.
- The architect must bill all consultants as reimbursable expenses.
- The architect must share any savings with the contractor.
- The architect cannot receive payment until construction is complete.
Explanation
A percentage-of-construction-cost fee ties compensation to project cost rather than to the architect's effort. If the owner reduces the budget after design begins without reducing the architect's scope, the fee falls even though the work remains. The architect can manage this risk with a stipulated fee floor or by defining scope changes as additional services.
Question 28Practice Management
Under a typical owner-architect agreement, which item is normally treated as a reimbursable expense rather than part of basic services?
- Coordination among the architect's consultants
- Schematic design sketches and revisions
- Printing bid sets of construction documents Correct answer.
- Routine construction administration site visits
Explanation
Reimbursable expenses are costs the architect incurs on the owner's behalf that are outside the basic services fee. Printing and reproduction of bid documents are commonly billed as reimbursables, along with travel and long-distance calls. Basic design and coordination services are included in the architect's fee.
Question 29Practice Management
A firm has annual fixed costs of $500,000, bills an average of $150 per hour, and pays $60 per hour in direct labor. How many billable hours must the firm bill to break even?
- 3,333 hours
- 8,333 hours
- 4,167 hours
- 5,556 hours Correct answer.
Explanation
The contribution margin per billable hour is the billing rate minus direct labor cost, or $90. Dividing fixed costs of $500,000 by $90 gives about 5,556 hours. This is the break-even volume before profit or other indirect costs.
Question 30Practice Management
During construction, an owner asks the architect to evaluate several alternative finish options that were not included in the contract documents. What is the architect's best first step?
- Refuse the request because construction has started.
- Perform the evaluation and invoice for it at the end of the month.
- Issue a written additional-services authorization for owner approval. Correct answer.
- Tell the contractor to select the finishes from the approved list.
Explanation
Work outside the agreed scope should be authorized in writing before the architect performs it, so the owner understands the cost and schedule effect. A written additional-services authorization protects both parties and avoids billing disputes. The architect should then perform the evaluation once authorized.
Question 31Practice Management
An owner's proposed contract requires the architect to perform services consistent with 'the highest standard in the profession.' How should the architect respond?
- Accept the language because owners commonly request it.
- Request a higher fee to insure the added risk.
- Ask that the standard be changed to the professional standard of care. Correct answer.
- Delete all language describing the architect's standard of care.
Explanation
The professional standard of care is the degree of skill and care ordinarily exercised by architects under similar circumstances. A 'highest standard' clause can imply a warranty of perfection and exceed the architect's legal duty. Negotiating back to the standard of care aligns the contract with professional liability coverage.
Question 32Practice Management
A firm's 90-day accounts receivable has grown for three consecutive months while its backlog is unchanged. Which action best addresses the trend?
- Check invoices and pursue overdue balances Correct answer.
- Reduce the number of projects accepted
- Increase billing rates on new work
- Convert projects to lump-sum fees
Explanation
Growing receivables with stable backlog suggests billing errors, slow approvals, or weak collection practices rather than a lack of work. The firm should review invoices for accuracy and systematically follow up on overdue accounts. Rate increases or changing fee types do not address cash already owed.
Question 33Practice Management
An architect is the prime professional on a project, and the structural engineer's drawings contain an error that delays construction. Who is generally responsible to the owner for the engineer's performance?
- The owner, because the owner approved the engineer's fee
- The contractor, because the contractor builds from the drawings
- The architect, because the architect contracted with the owner for coordinated design Correct answer.
- The structural engineer, because the owner relied on the engineer's drawings
Explanation
When the architect is the prime professional, the architect contracts with the owner to provide coordinated design services and typically hires consultants as subconsultants. The owner's contractual claim generally runs to the architect, who may then seek recovery from the engineer. Privity of contract limits the owner's direct claim against the engineer in many jurisdictions.
Question 34Practice Management
An owner asks an architect for a lump-sum fee before the building program has been defined. What is the architect's best risk-management response?
- Decline the project until the owner provides a complete building program.
- Add a 10% contingency to an estimated fee and sign the contract.
- Use the fee from a recently completed project of similar size.
- Use hourly billing until the program is fixed, then set a lump sum. Correct answer.
Explanation
A lump sum is appropriate only when the scope is reasonably defined. Billing hourly during programming lets the architect be paid for the work needed to establish scope and avoids pricing unknown services. The parties can then agree on a lump sum with a defined program.
Question 35Project Management
In which project delivery method does the owner hold separate contracts with the architect and the contractor, with construction awarded to the low bidder?
- Construction management at risk
- Design-build
- Design-bid-build Correct answer.
- Integrated project delivery
Explanation
Design-bid-build is a sequential method in which the owner contracts separately with the architect for design and with the contractor for construction, typically selecting the contractor through competitive bidding. The other methods combine or restructure these relationships. This separation means construction cannot begin until design is complete and a bid is awarded.
Question 36Project Management
An activity has an early finish of day 18 and a late finish of day 24. What is its total float?
- 0 days
- 18 days
- 6 days Correct answer.
- 24 days
Explanation
Total float equals late finish minus early finish, or 24 minus 18, which is 6 days. It represents how long the activity can be delayed without delaying the project finish. Activities on the critical path have zero total float.
Question 37Project Management
During construction, a contractor requests a change that will increase the contract sum. Under a standard owner-contractor agreement, who must authorize the change order?
- The construction manager's field superintendent
- The owner Correct answer.
- The contractor's surety
- The architect alone
Explanation
A change order modifies the contract sum or contract time, so it requires the owner's authorization and the contractor's agreement. The architect typically prepares and administers the change order but does not commit the owner's funds. The surety guarantees performance and payment, not scope changes.
Question 38Project Management
Under the standard AIA owner-architect agreement, which of the following is typically included in basic services?
- Furniture and equipment selection
- Construction administration Correct answer.
- Enhanced commissioning
- Post-occupancy evaluation
Explanation
Basic services under the standard owner-architect agreement generally run from schematic design through construction administration, including submittal review and site observation. Post-occupancy evaluation, furniture selection, and enhanced commissioning are commonly additional services. Additional services require separate authorization and compensation.
Question 39Project Management
Which scheduling tool displays activities as horizontal bars against a calendar timeline but does not by itself show logical dependencies or float?
- Line-of-balance chart
- PERT network
- Gantt bar chart Correct answer.
- Critical path network diagram
Explanation
A simple Gantt bar chart shows activity duration and timing along a calendar, making it easy to read but limited in showing logic or float. Network diagrams such as CPM or PERT explicitly model dependencies and calculate float. Line-of-balance charts are used for repetitive work such as high-rise construction.
Question 40Project Management
Which estimate is typically prepared at the end of schematic design to establish the project budget, with an expected accuracy of roughly plus or minus 10 to 15 percent?
- Bid estimate
- Order-of-magnitude estimate
- Preliminary design estimate Correct answer.
- Construction documents estimate
Explanation
A preliminary design estimate is prepared as design develops, often at the end of schematic design, and is used to set or confirm the project budget. Its accuracy is commonly around plus or minus 10 to 15 percent. Order-of-magnitude estimates are earlier and less precise, while construction documents and bid estimates are more precise and later.
Question 41Project Management
An addendum is issued during the bidding period. What is the architect's standard responsibility?
- Issue it only to the apparent low bidder
- Extend the bid date only if the owner requests it
- Send it to all bidders before bid opening Correct answer.
- Incorporate it into the contract after award only
Explanation
An addendum modifies the bidding documents and must be issued to every party that received those documents, sufficiently before bid opening for bidders to account for it. Bidders typically acknowledge addenda in their proposals. If an addendum substantially changes the scope, the bid date may need to be extended.
Question 42Project Management
Which contract type places the greatest risk of cost overrun on the contractor?
- Time and materials
- Firm fixed price Correct answer.
- Cost plus fixed fee
- Cost plus percentage of cost
Explanation
Under a firm fixed price, often called lump sum, the contractor commits to a price for the defined scope and absorbs cost overruns unless changes are authorized. Cost-reimbursable arrangements shift more cost risk to the owner. Time and materials similarly pay actual costs plus a markup.
Question 43Project Management
Which risk response is being used when an owner purchases builder's risk insurance for a renovation project?
- Risk avoidance
- Risk acceptance
- Risk transfer Correct answer.
- Risk exploitation
Explanation
Purchasing insurance transfers the financial consequence of a risk to the insurer in exchange for a premium. Risk avoidance would eliminate the activity that creates the risk, and acceptance would retain the exposure without transferring it. Exploitation is a strategy for positive risks, not threats.
Question 44Project Management
Which activity is an example of quality assurance rather than quality control?
- Testing a window mock-up for air infiltration
- Recording a punch-list item for a damaged door
- Inspecting a concrete pour for slump on site
- Auditing standard details for code compliance Correct answer.
Explanation
Quality assurance is process-oriented and preventive, such as auditing standard details or procedures to confirm they meet requirements before work occurs. Quality control is product-oriented and checks completed work through inspection and testing. The other choices are inspections or observations of installed work.
Question 45Project Management
Which document confirms that a completed building complies with applicable codes and is approved for occupancy?
- Certificate of occupancy Correct answer.
- Notice of completion
- Certificate of substantial completion
- Building permit
Explanation
A certificate of occupancy is issued by the authority having jurisdiction after required inspections confirm that the building complies with applicable codes and may be occupied. A building permit authorizes construction, not occupancy. Substantial completion and notice of completion are contractual or statutory milestones, not code occupancy approvals.
Question 46Project Management
What is the primary purpose of the architect's review of a contractor's submittal?
- To verify conformance with the contract documents Correct answer.
- To transfer design responsibility to the contractor
- To guarantee the contractor's schedule
- To approve the contractor's means and methods
Explanation
The architect reviews submittals to check that the contractor's proposed products, materials, and shop drawings conform to the design concept and contract documents. Review does not approve the contractor's means and methods or relieve the contractor of responsibility for meeting the contract. It also does not guarantee the schedule.
Question 47Project Management
A contractor submits a request for information during construction. What is the architect's most appropriate response?
- Issue a change order automatically
- Direct the contractor verbally to proceed
- Clarify the contract documents in writing Correct answer.
- Ignore it if the answer is shown on a drawing
Explanation
The architect should respond to an RFI in writing so that the clarification becomes part of the project record and is distributed consistently. A verbal direction creates ambiguity and should be confirmed in writing. An RFI may lead to a change order, but only if the answer changes cost or time.
Question 48Project Management
Substantial completion is best described as which of the following?
- The date the owner first occupies any portion of the project
- The date the contractor's final payment application is approved
- The date all retainage is released
- When work is sufficiently complete for its intended use Correct answer.
Explanation
Substantial completion occurs when the work is sufficiently complete in accordance with the contract documents that the owner can occupy or use the project for its intended purpose, even if minor items remain. It typically triggers warranty periods and changes insurance and payment obligations. Final completion and retainage release come later.
Question 49Project Management
What is the primary purpose of retainage on a construction contract?
- To prepay the contractor's insurance premiums
- To pay for permits and inspections
- To ensure completion and correction of defects Correct answer.
- To fund the architect's construction administration fee
Explanation
Retainage withholds a percentage of progress payments to protect the owner until the work is complete and defects are corrected. It provides leverage for completion and can also protect against liens. It is not a fee fund or an insurance prepayment.
Question 50Project Management
An owner wants to reduce the overall project duration by overlapping design and construction. Which delivery approach best supports this?
- Design-bid-build with a single lump-sum bid
- Design-build with a price fixed only after complete documents
- Construction management at risk with early bid packages Correct answer.
- Design-bid-build with pre-qualified bidders
Explanation
Construction management at risk allows the owner to procure a construction manager early and bid trade packages in phases while design continues, overlapping design and construction. Design-bid-build generally requires complete documents before a single bid. A design-build price fixed only after complete documents eliminates much of the schedule benefit.