ARE 5.0: PPD study materials
ARE 5.0: PPD study resources

ARE 5.0: PPD flashcards

ARE 5.0: PPD · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Solar altitude at noon
Solar altitude at solar noon equals 90 degrees minus the absolute difference between latitude and solar declination. It determines noon shadow length and overhang performance.
Summer solstice sun path
In the Northern Hemisphere the summer solstice has the highest noon sun and longest day; the sun rises north of east and sets north of west.
Heat island effect
Urban heat islands occur when dark low-albedo surfaces, sparse vegetation, and waste heat raise local air temperature above surrounding rural areas. Vegetation and high-albedo surfaces reduce it.
Daylight factor
Daylight factor is interior horizontal illuminance divided by unobstructed exterior horizontal illuminance, times 100. It excludes direct sunlight and depends on sky conditions.
Prevailing winter wind
Prevailing winter winds increase infiltration and conductive heat loss. Windbreaks and dense vegetation reduce wind speed, while summer breeze paths should remain unobstructed.
Stormwater detention
Stormwater detention temporarily stores runoff and releases it slowly, reducing peak flows. Detention, retention, bioswales, and permeable paving also improve water quality.
Floor area ratio
Floor area ratio equals total gross floor area divided by lot area. Zoning uses FAR with setbacks, height limits, and lot coverage to control density.
Exit access travel distance
Exit access travel distance is measured along the actual path from the most remote occupied point to an exit. Code limits vary by occupancy, sprinklers, and construction type.
Accessible route clear width
An accessible route generally requires 36 inches (915 millimeters) minimum clear width, with 60-inch turning spaces and 32-inch clear door width; ramps have a 1:12 maximum slope.
Egress capacity factors
Common egress capacity factors are 0.2 inch per occupant for level components and 0.3 inch per occupant for stairs. Verify the adopted code edition and occupancy.
Type of construction
Type of construction, classified I through V, sets required fire resistance for structural elements. Occupancy, height, and area thresholds determine the minimum allowed type.
Sensible versus latent load
Sensible load changes air dry-bulb temperature; latent load changes moisture content. HVAC equipment must handle both, and cooling coils remove moisture when below dew point.
Economizer cycle
An economizer uses cooler outdoor air instead of mechanical cooling when outdoor air temperature or enthalpy is below return air conditions, reducing compressor energy.
Drainage slope rule
Drainage pipes 2.5 inches and smaller typically slope 1/4 inch per foot; pipes 3 inches and larger slope 1/8 inch per foot, unless the code permits otherwise.
Voltage drop
Voltage drop is the loss of voltage along conductors caused by resistance and current. Long runs and undersized conductors increase drop and may impair equipment performance.
Fire sprinkler system
A fire sprinkler system supplies water to automatic heads that discharge when heat-sensitive elements fuse. It is an active system and may allow area or height increases.
Variable air volume
A variable air volume system changes supply air volume while holding supply temperature, matching part-load conditions. VAV boxes and controls regulate zone airflow.
Assembly U-factor
Assembly U-factor equals one divided by total thermal resistance. Total resistance sums layer R-values plus film resistances; thermal bridging reduces the effective R-value.
Thermal bridging
Thermal bridging is heat flow through highly conductive paths such as framing, shelves, or corners that bypass insulation. Continuous insulation and thermal breaks reduce it.
Vapor retarder location
In cold climates vapor retarders generally go on the warm interior side; in warm-humid climates an interior vapor barrier can trap moisture and should be avoided.
Sound transmission class
Sound transmission class rates airborne sound isolation of an assembly. Higher STC means less sound passes; mass, sealing, and decoupling improve STC.
Impact insulation class
Impact insulation class rates how well a floor assembly resists structure-borne impact sound such as footsteps. Higher IIC means better impact isolation; resilient layers improve it.
Net-to-gross ratio
Net-to-gross ratio equals net assignable area divided by gross building area. It measures planning efficiency because gross area includes circulation, walls, shafts, and mechanical space.
Adjacency matrix
An adjacency matrix scores required proximity or separation between pairs of spaces. It supports bubble diagrams and block planning before detailed room layouts.
Bubble diagram
A bubble diagram represents spaces as bubbles and relationships as connections. It tests zoning, adjacency, and circulation before dimensions and construction constraints are fixed.
Clash detection
Clash detection uses a building information model to find geometric conflicts among structure, ducts, pipes, and conduit before construction, reducing field conflicts.
Universal design
Universal design creates environments usable by people with varied abilities without adaptation. It integrates accessibility, reach ranges, clearances, and wayfinding from the start.
Life-cycle cost
Life-cycle cost is initial cost plus present value of operating, maintenance, and replacement costs, minus salvage value. It compares alternatives over the same study period.
Simple payback
Simple payback equals incremental first cost divided by annual savings. It shows how quickly savings recover the investment but ignores time value and later costs.
Design contingency
Design contingency is a budget allowance for unknown scope during design. It typically decreases as design progresses and is separate from construction and owner contingencies.
Value engineering
Value engineering analyzes function and cost to find alternatives that preserve required performance. It should not be treated as simple scope cutting or deferred maintenance.
Cost escalation
Cost escalation adjusts costs for time using construction cost indices. Location factors separately adjust for regional differences in labor and material prices.