ARE 5.0: PPD study materials
ARE 5.0: PPD study resources

ARE 5.0: PPD study plan

ARE 5.0: PPD · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Building Systems, Materials & Assemblies

  • Build a comparison matrix of four structural systems (steel, cast-in-place concrete, wood, masonry) recording typical bay spans, lateral-force-resisting strategy, and framing depth.

  • Draw a schematic building section that reserves horizontal and vertical zones for structure, supply and return air, plumbing, and power, and dimension each zone.

  • Assemble a material properties sheet for eight common finish and assembly types listing fire rating, acoustic performance, and moisture sensitivity.

  • Trace the path of a duct, a drain stack, and a conduit run from origin to termination through your section and mark every point where they fight for the same space.

Your checkpoint

A single-page systems matrix plus an annotated schematic section covering four structural systems and three distribution strategies, with span, depth, and coordination notes for each.

Week 2

Building Systems, Materials & Assemblies & Environmental Conditions & Context

  • Calculate the U-value of three different wall assemblies from layer R-values and compare each against a target value you set in advance.

  • Position the air barrier, vapor retarder, and insulation in three envelope assemblies and write a dew-point justification for each placement decision.

  • Sketch summer solstice, equinox, and winter solstice sun paths for a chosen latitude and derive shadow angles for a horizontal and a vertical shading device.

  • Classify a site by climate zone and select three passive strategies, stating the specific building feature each strategy requires.

Your checkpoint

Three annotated wall sections with complete U-value arithmetic and a one-paragraph moisture-control rationale per section, plus one shading study sketch.

Week 3

Environmental Conditions & Context

  • Analyze a hypothetical site for solar exposure, prevailing wind, drainage, noise, and access, and rank the findings by design impact.

  • Lay out a building footprint on that site that responds to orientation, setback, and stormwater run-off constraints, and justify each move in writing.

  • Size a daylighting strategy for a 30-foot-deep open office using window head height, sill height, and room depth relationships.

  • Compare two massing options for the same program and document how each changes heat gain, daylight, and usable area.

Your checkpoint

A two-page site and climate analysis package: annotated site plan, massing comparison, and a daylighting sketch with dimensions and reasoning.

Week 4

Project Integration of Program & Systems & Environmental Conditions & Context

  • Build a program adjacency matrix for a mixed-use building and derive a block-and-stack diagram from it.

  • Overlay the structural grid from week one onto the block-and-stack diagram and resolve at least three conflicts between bay size and room module.

  • Produce a reflected ceiling plan coordinating light fixtures, air diffusers, sprinkler heads, and structural framing without clashes.

  • Write a one-page sequence describing how program, structure, and building systems decisions constrain one another across design phases.

Your checkpoint

A coordinated block-and-stack diagram plus a drawn ceiling plan with a written conflict log identifying every clash found and how it was resolved.

Week 5

Project Integration of Program & Systems & Codes & Regulations

  • Determine occupancy classification and required fire separation for each tenant in a mixed-occupancy building and record the triggers that change the answer.

  • Trace exit access travel distance and path of egress travel from the farthest point of a floor plate to exit discharge and flag every point of noncompliance.

  • Select fire-rated wall and floor assemblies from a code table and enter them into a wall type schedule with hourly ratings.

  • Integrate the mechanical shaft and egress stair into the structural grid without reducing required clear width.

Your checkpoint

A one-page code and egress summary for the week-4 building with occupancy classifications, travel distances, rated assemblies, and a marked-up egress plan.

Week 6

Codes & Regulations

  • Calculate occupant load and required egress capacity for a floor plate using occupant load factors, then verify the number and width of exits.

  • Determine allowable building height and floor area from construction type and occupancy, then apply a frontage increase and show the arithmetic.

  • Apply accessibility requirements to a restroom layout and a parking layout, dimensioning clear floor space, turning radius, and accessible stall counts.

  • Map zoning constraints including setbacks, floor area ratio, and height limit onto a massing study and identify the binding constraint.

Your checkpoint

A one-page code calculation sheet showing occupant load, egress width, allowable area with frontage math, and the resulting massing envelope.

Week 7

Project Costs & Budgeting & Codes & Regulations

  • Prepare a schematic-level cost estimate for three building types using unit costs per square foot and per unit, and state the assumptions behind each number.

  • Itemize every budget line beyond hard construction cost, including contingency, escalation, soft costs, site work, and owner allowances.

  • Quantify how a change in structural system or envelope performance shifts the estimate by a defined percentage and identify which line items move.

  • Compare the twenty-year life-cycle cost of two HVAC options using first cost, energy use, and replacement intervals.

Your checkpoint

A cost model table for one building with hard costs, soft costs, contingency, escalation, and a side-by-side life-cycle comparison of two system options.

Week 8

Environmental Conditions & Context & Codes & Regulations & Building Systems, Materials & Assemblies & Project Integration of Program & Systems & Project Costs & Budgeting

  • Complete a full-length timed practice exam under test conditions and score each of the five domains separately.

  • Re-study the two lowest-scoring domains and rewrite each missed concept as a corrected one-sentence rule you can apply cold.

  • Rehearse two integrated scenarios that combine program, structural, envelope, code, and cost decisions in a single narrative.

  • Condense all eight weeks of notes into a one-page decision checklist organized by design phase.

Your checkpoint

A scored full-length practice exam with a written error log that names the cause of every miss and the corrected rule for each.

Milestones

Week 2: Score at least 80 percent on a 20-question self-quiz on structural, envelope, and MEP fundamentals that you write from your own notes, and log the reason for every miss.

Week 4: Review the coordinated ceiling and structural plan against a 15-item integration checklist and satisfy at least 12 items before moving on.

Week 6: Score at least 75 percent on a 30-question mixed quiz covering codes, egress, accessibility, and zoning, and resolve every missed item within the same week.

Week 8: Complete the full-length timed practice exam at or above your target scaled score with no individual domain below 60 percent.