ASSE 6010 study materials
ASSE 6010 study resources

ASSE 6010 study plan

ASSE 6010 · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Cross-Connection Control Principles and Backflow Theory

  • Define cross-connection, backflow, backsiphonage, and backpressure in your own words without notes

  • Explain how a negative or reduced pressure zone in a supply main creates a backsiphonage condition, using a numeric pressure example

  • Distinguish contamination from pollution and assign a hazard level to at least ten common building connections

  • Trace the path of a potential backflow event through a typical domestic water service, irrigation main, and boiler feed

Your checkpoint

A one-page written hazard inventory listing 15 real-world cross-connections with the backflow type (backsiphonage or backpressure) and hazard class for each, self-scored against the domain-1 outline until you reach 90% accuracy.

Week 2

Cross-Connection Control Principles and Backflow Theory & Backflow Prevention Assembly Types, Design, and Operation

  • Calculate the pressure differential that drives backflow in three given scenarios using elevation and friction-loss inputs

  • List the five assembly families (RPZ, DCVA, PVB, AVB, SVB) and state for each whether it protects against backsiphonage only or both backflow types

  • Describe the operating sequence of a reduced-pressure principle assembly from normal flow through each check and the relief valve

  • Match each assembly type to the hazard level and application it is typically required for

Your checkpoint

An eight-attribute comparison table covering all five assembly families, checked against your study references with every discrepancy corrected and annotated.

Week 3

Backflow Prevention Assembly Types, Design, and Operation

  • Identify every component of an RPZ and a double check assembly from a verbal description of the water path alone

  • Explain the function of each test cock and shutoff valve in the standard test-cock numbering scheme

  • State the installation requirements for orientation, drainability, freeze protection, and accessibility for each assembly type

  • Explain why an RPZ relief valve discharges and what conditions cause nuisance dumping

Your checkpoint

A from-memory written parts list and flow-path narrative for the RPZ, DCVA, PVB, and AVB, verified against reference material with a corrected final version submitted.

Week 4

Field Test Procedures and Equipment Use

  • Set up a differential pressure test kit and describe the purpose of each hose connection before pressurizing

  • Narrate the full field test sequence for an RPZ, including which test cock is read at each step and the accept/reject value for each reading

  • Narrate the full field test sequence for a double check assembly and identify which check failure produces which symptom

  • Distinguish gauge calibration drift from an actual assembly failure when readings are marginal

Your checkpoint

A written, step-numbered RPZ and DCVA test procedure with expected readings and pass/fail criteria recorded at each step, performed once on a training bench or simulator and logged with the actual numbers obtained.

Week 5

Field Test Procedures and Equipment Use & Troubleshooting, Repair, and Maintenance

  • Narrate the field test sequence for a pressure vacuum breaker, an atmospheric vacuum breaker, and a spill-resistant vacuum breaker

  • Explain what each test reveals about check-valve or air-inlet condition, and how a failed reading maps to a specific defective part

  • Describe gauge calibration verification and the acceptable error tolerance before a test result is valid

  • Complete a set of timed practice items on test procedures with at least 80% accuracy

Your checkpoint

A completed test-report form for all five assembly types with expected versus observed readings and a written note for each reading that failed, naming the faulty component.

Week 6

Troubleshooting, Repair, and Maintenance

  • Diagnose the six most common RPZ failures from symptoms alone and list the repair for each

  • Explain the causes of check-valve fouling, relief-valve chatter, and continuous discharge, and the corrective action for each

  • Describe a preventive maintenance routine including flushing, strainer cleaning, and inspection intervals

  • Explain how debris, water hammer, and thermal expansion each damage internal assembly components

Your checkpoint

A troubleshooting matrix of at least 12 symptom-to-cause-to-repair rows, self-quizzed until you can reproduce it from a blank page.

Week 7

Regulations, Codes, and Program Administration

  • Outline the roles of the authority having jurisdiction, the water purveyor, the tester, and the property owner in a cross-connection control program

  • Describe the typical elements of a written cross-connection control program: hazard surveys, assembly selection, testing frequency, and record retention

  • Explain the tester's administrative duties: notification, tagging, report submission, and recordkeeping

  • Compare how local requirements can differ from the model standard and where to confirm the governing rule

Your checkpoint

A one-page checklist of the administrative steps a tester must complete before, during, and after a field test, written from memory and then validated against your local program requirements.

Week 8

Cross-Connection Control Principles and Backflow Theory & Regulations, Codes, and Program Administration & Backflow Prevention Assembly Types, Design, and Operation & Field Test Procedures and Equipment Use & Troubleshooting, Repair, and Maintenance

  • Complete two full-length timed practice exams under test conditions

  • Review every missed item and write a one-sentence correction for each

  • Re-derive the RPZ, DCVA, PVB, and AVB test sequences and troubleshooting matrices from a blank page

  • Identify and close your two weakest remaining sub-areas

Your checkpoint

A scored practice exam log showing both attempts, a written error-analysis list, and a final self-assessment rating each domain 1 through 5 on a 1-to-5 confidence scale with evidence cited for each rating.

Milestones

Week 2: Explain backsiphonage versus backpressure and the operating principle of all five assembly types aloud in under five minutes with no notes.

Week 4: Walk through the complete RPZ and DCVA field test procedures, including every test-cock reading and pass/fail value, from memory without prompts.

Week 6: Reproduce the 12-row troubleshooting matrix from a blank page and score at least 80% on a timed mixed-domain practice set.

Week 8: Score 85% or higher on two consecutive full-length timed practice exams and rate every domain at 4 or 5 with supporting evidence.