Cert III Air Conditioning & Refrigeration · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Installation and Commissioning of Refrigeration and Air Conditioning Systems & Work Health and Safety and Environmental Compliance

  • Map the commissioning sequence for a split system from pre-installation site check to handover, listing each step in order

  • Identify the personal protective equipment and hazard controls required before brazing, pressure testing and refrigerant charging

  • Explain safe refrigerant cylinder handling, storage and transport rules including segregation and ventilation

  • Draft a site-specific risk assessment for a rooftop condensing unit installation with at least eight hazards and controls

Your checkpoint

A one-page commissioning checklist plus a completed risk assessment template for a rooftop install

Week 2

Installation and Commissioning of Refrigeration and Air Conditioning Systems & Refrigeration and Air Conditioning Fundamentals (Thermodynamics, Pressure-Temperature, Refrigerants)

  • Size and select copper pipe diameters and insulation thickness for two example systems using manufacturer data

  • Perform leak testing with dry nitrogen and evacuate a system to a target micron level, recording the standing vacuum result

  • Calculate superheat and subcooling from gauge and thermometer readings for a fixed-orifice and a TXV system

  • Describe correct brazing practice including nitrogen purge, flux selection and pressure test hold times

Your checkpoint

A worked installation and evacuation record for one practice system showing pressures, vacuum decay and final superheat/subcooling values

Week 3

Refrigeration and Air Conditioning Fundamentals (Thermodynamics, Pressure-Temperature, Refrigerants) & Electrical and Control Systems for Refrigeration and Air Conditioning

  • Interpret a pressure-temperature chart for at least three common refrigerants and convert gauge to absolute pressures

  • Explain the vapour-compression cycle stage by stage and locate each stage on a sketch

  • Identify refrigerant safety classifications, GWP values and ozone-depletion status for the main refrigerant families

  • Read a basic wiring diagram and trace the control circuit from thermostat through contactor to compressor

Your checkpoint

A labelled PT chart summary sheet and a hand-drawn refrigeration cycle diagram annotated with temperatures and pressures

Week 4

Electrical and Control Systems for Refrigeration and Air Conditioning & Work Health and Safety and Environmental Compliance

  • Wire and test a simulated control circuit including thermostat, contactor, overload and start capacitor

  • Measure voltage, current and resistance safely with a multimeter on a live low-voltage circuit under supervision

  • Explain electrical isolation and lock-out/tag-out procedures before servicing control panels

  • Interpret protection device ratings and select the correct fuse or breaker for a given circuit

Your checkpoint

A fault-injected control circuit diagnosed and repaired, with a written record of measured values and the isolation steps taken

Week 5

Fault Finding, Diagnosis and Repair & Refrigeration and Air Conditioning Fundamentals (Thermodynamics, Pressure-Temperature, Refrigerants)

  • Apply a systematic diagnostic sequence to at least four simulated faults covering refrigerant, airflow and electrical categories

  • Diagnose low superheat, high superheat, low subcooling and high head pressure scenarios and state the likely cause and remedy

  • Use pressure, temperature and current readings together to distinguish a restriction from an undercharge

  • Document each diagnosis with readings, reasoning and the corrective action taken

Your checkpoint

A fault-finding log of four resolved scenarios, each with initial readings, diagnosis rationale and repair outcome

Week 6

Fault Finding, Diagnosis and Repair & Maintenance, Service and Decommissioning

  • Develop a preventive maintenance schedule covering coils, filters, belts, drains and electrical connections for a commercial unit

  • Perform refrigerant recovery into a recovery cylinder and record weights before and after

  • Explain decommissioning steps including refrigerant reclaim, oil disposal and safe isolation of electrical supply

  • Identify environmental compliance obligations for refrigerant handling, record keeping and leak reporting

Your checkpoint

A completed maintenance schedule template plus a refrigerant recovery and decommissioning record for one practice unit

Week 7

Maintenance, Service and Decommissioning & Communication, Documentation and Customer Service

  • Write a service report that records work performed, readings, parts used and recommendations in clear plain language

  • Explain a technical fault and its repair to a non-technical customer in under two minutes without jargon

  • Apply workplace record-keeping requirements for refrigerant use, waste disposal and job sign-off

  • Demonstrate active listening and clarifying questions in a simulated customer complaint about repeat breakdowns

Your checkpoint

A polished service report and a two-minute recorded or role-played customer explanation of a repair

Week 8

Workplace Practice, Teamwork and Industry Compliance & Work Health and Safety and Environmental Compliance & Communication, Documentation and Customer Service

  • Consolidate weak areas by re-attempting practice questions from every domain and logging error patterns

  • Explain team roles, permit systems and escalation paths on a multi-trade installation site

  • Review industry licensing, codes of practice and environmental obligations relevant to the trade

  • Complete a timed mixed-domain practice exam under realistic conditions

Your checkpoint

A timed 60-question mixed practice exam with a scored review sheet listing every missed topic and a revision action

Milestones

Week 2: Can perform and document a nitrogen pressure test and evacuation to target vacuum without reference notes

Week 4: Can trace and repair a control circuit fault while correctly applying isolation procedures

Week 6: Can complete refrigerant recovery and a preventive maintenance schedule to a professional standard

Week 8: Scores at least 80 percent on the timed mixed practice exam with all weak topics logged