High Risk Work Licence - Standard Boiler (BS) study materials
High Risk Work Licence - Standard Boiler (BS) study resources

High Risk Work Licence - Standard Boiler (BS) study plan

High Risk Work Licence - Standard Boiler (BS) · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Boiler construction, types and terminology & Boiler fittings, valves, gauges and safety devices

  • Sketch and label the main pressure parts of a shell boiler (shell, furnace, tube plates, firetubes, crown and girder stays) from memory, naming each part's function

  • Distinguish firetube from watertube construction and list three operating consequences of each arrangement

  • Explain the purpose of at least eight boiler fittings (safety valve, main steam stop, feed check, feed isolating, blowdown, water gauge glass, pressure gauge, low-water cut-out) and where each sits in the steam/water circuit

  • Define the terminology set: working pressure, design pressure, MAWP, saturation temperature, priming, foaming, carry-over, and stay pitch

Your checkpoint

A hand-drawn, fully labelled boiler cross-section with a one-line function note for every fitting shown, self-marked against the study notes with corrections listed

Week 2

Boiler fittings, valves, gauges and safety devices & Feedwater systems, pumps, injectors and water level control

  • Describe how a safety valve is set, tested and sealed, and state why it must never be gagged or isolated from the boiler

  • Sequence the correct water-level test procedure for a gauge glass, including blowing through, and explain how a low-water cut-out is proven

  • Compare feed pump types (centrifugal, reciprocating, injector) by principle of operation and typical application

  • Trace the feedwater path from storage through treatment, pump, economiser and feed check valve into the boiler

Your checkpoint

A written step-by-step procedure card (10-15 steps) for proving gauge glass and low-water cut-out correct, with the consequence of each step being skipped noted beside it

Week 3

Combustion, fuels, burners and Draft systems & Start-up, shutdown and normal operating procedures

  • Explain the combustion triangle and the three T's, and relate excess air to stack loss and CO formation

  • Identify burner components (register, swirler, pilot, flame scanner, fuel control valve) and describe a safe light-up sequence including purge and proving time

  • Differentiate natural, forced, induced and balanced draft and state how each is achieved

  • Write the normal start-up sequence from cold for a standard boiler, from pre-start checks through to putting on load

Your checkpoint

A one-page cold start-up checklist in correct order, cross-checked against the light-up sequence so no purge, scanner-prove or warm-through step is missing

Week 4

Boiler water chemistry, treatment and blowdown & Start-up, shutdown and normal operating procedures

  • Interpret the key water chemistry parameters (pH, total dissolved solids, alkalinity, hardness, dissolved oxygen, conductivity) and state the corrosion or scaling risk each controls

  • Explain the difference between bottom blowdown and surface (scum) blowdown and when each is used

  • Describe continuous and intermittent feedwater control and the operator's role in maintaining level within the normal band

  • Explain why a boiler is warmed through slowly and what thermal stress does to tube plates and stays

Your checkpoint

A timed 30-question self-test covering domains 1-6, scored, with every wrong answer rewritten as a corrected fact

Week 5

Abnormal conditions, emergencies and accident prevention & Boiler fittings, valves, gauges and safety devices

  • List the immediate actions for low water, high water, and a gauge glass that shows a false level, and justify why the low-water response is not to add feed in an unproven condition

  • Describe the correct response to a tube leak, a safety valve lifting below set pressure, and a burner flame failure

  • Explain how priming and foaming are recognised, their causes, and the corrective actions

  • Distinguish an emergency shutdown from a normal shutdown and list the conditions that force an emergency stop

Your checkpoint

A decision-tree diagram for abnormal water level (low, high, false indication) showing the check, the action and the escalation point at each branch

Week 6

Abnormal conditions, emergencies and accident prevention & Combustion, fuels, burners and Draft systems

  • Outline the actions for a furnace explosion or puff-back and the conditions that precede it

  • Describe fuel supply isolation, purge and leak-test requirements before relighting after a trip

  • Explain draft loss, high stack temperature and CO readings as early warning signs of poor combustion

  • State the reporting and isolation duties after any protective device operates

Your checkpoint

A written emergency response drill write-up for one scenario (furnace puff-back or flame failure), covering detection, immediate action, isolation, notification and return-to-service conditions

Week 7

Inspection, maintenance, testing and record keeping & Legislative and duty-of-care responsibilities for boiler operation

  • List the inspections and tests due on a standard boiler (internal and external inspection, safety valve test, pressure gauge and cut-out checks) and the typical interval for each

  • Describe what records must be kept, why they matter evidentially, and how to complete a shift log accurately

  • Explain the operator's duty of care, the concept of competent person, and the obligation to stop and report unsafe conditions

  • Identify the licence class obligations and the consequences of operating outside them

Your checkpoint

A completed sample shift log and maintenance register for one week, plus a short written statement of the operator's reporting duties when a defect is found

Week 8

Boiler construction, types and terminology & Boiler fittings, valves, gauges and safety devices & Feedwater systems, pumps, injectors and water level control & Combustion, fuels, burners and Draft systems & Boiler water chemistry, treatment and blowdown & Start-up, shutdown and normal operating procedures & Abnormal conditions, emergencies and accident prevention & Inspection, maintenance, testing and record keeping & Legislative and duty-of-care responsibilities for boiler operation

  • Revise every domain using the corrected facts gathered in weeks 1-7, prioritising the domains with the lowest practice scores

  • Complete two full-length timed practice papers under exam conditions

  • Explain aloud, without notes, the safety valve, gauge glass and low-water cut-out procedures

  • Review all decision trees and procedure cards and close any remaining gaps

Your checkpoint

Two scored practice papers with a one-page 'weak points' summary and a dated plan for the final 48 hours before the exam

Milestones

Week 2: Can name and locate every fitting on a boiler diagram and explain the gauge glass prove procedure without notes

Week 4: Scores at least 75% on the 30-question self-test across domains 1-6 and has rewritten every incorrect answer as a corrected fact

Week 6: Can state the low-water, flame failure and puff-back responses in the correct order, with escalation points, unaided

Week 8: Scores 85% or better on both full-length timed papers and has no unresolved gaps on the weak-points summary