Rated capacity
The maximum load a crane may lift at a specified radius and configuration, including rigging, as stated on the load chart.
Load moment
The product of load and radius; it determines the stability and structural limit used to derive the crane's load chart.
Radius
The horizontal distance from the crane's slewing centre to the centre of gravity of the load, used to read the load chart.
Sling angle factor
A multiplier applied to sling tension based on the included angle between legs; tension increases as the angle widens.
Centre of gravity
The point where the load's weight is concentrated; it must be directly below the hook to prevent swing and unequal loading.
Pre-operational inspection
A documented check of the crane before each shift, covering structure, wire rope, hook, brakes, limits, and safety devices.
Outrigger setup
Fully extending outriggers on stable, compacted ground with spreader mats as needed, then levelling the crane before lifting.
Exclusion zone
A defined area beneath and around the load path where no person may stand, to prevent injury from falling loads or swing.
Hierarchy of control
The ranked approach to risk control: eliminate, substitute, engineer, administrate, then PPE as the last resort.
ALARP
As low as reasonably practicable; the principle that risks must be reduced until further control is grossly disproportionate to benefit.
PCBU
Person conducting a business or undertaking; has the primary duty to ensure health and safety so far as reasonably practicable.
Notifiable incident
A serious incident such as crane collapse, uncontrolled load drop, or powerline contact that must be reported to the regulator.
SWMS
Safe work method statement; a site-specific document describing hazards, controls, and sequence for high-risk construction work.
Standard hand signals
Uniform signals per AS 2550.1 used by a designated signal person to direct hoist, lower, slew, stop, and emergency stop.
Emergency stop signal
Any person may give a stop signal; the operator must stop immediately and hold the load safely until directed.
Tag line
A rope used to control load rotation without a person standing under the load; never wrap around hands or stand in the bight.
Load swing control
Using smooth accelerations, anticipating slew, and leading the load to prevent dangerous pendulum motion during travel or slewing.
Blind lift
A lift where the operator cannot see the load or path; requires a designated spotter and continuous communication.
Wire rope rejection
Criteria such as broken wires, kinks, corrosion, or diameter reduction that require the rope to be removed from service.
Hook latch
A safety device that closes the hook throat to prevent slings from slipping out; must be present and functional.
Limit switch
A safety device that stops hoist, lower, or slew motion at a set point; must be tested during pre-start inspection.
Overload protection
A system that warns or prevents lifting beyond rated capacity; must be functional and not overridden.
Dynamic risk assessment
Continuous evaluation of changing conditions during the lift, with authority to stop work if risk increases.
Ground bearing pressure
The load per unit area exerted by outriggers or rails on the ground; must be checked to prevent settlement or collapse.
Load chart
A manufacturer-supplied table or graph showing rated capacity for each radius, boom length, and configuration.
Mode factor
A multiplier from sling standards applied to the sling's WLL based on the number of legs and included angle.
Shock loading
A sudden dynamic force from jerking or dropping a load, which can exceed the static weight and overload the crane.
Emergency lowering
A manufacturer-specified procedure to lower a suspended load safely after power failure or control malfunction.
Post-incident inspection
A thorough examination by a competent person after any incident, required before the crane returns to service.
Defect tagging
Attaching a clear tag to a defective crane or component to prevent use until repaired and re-inspected.
Operator logbook
A record of crane hours, lifts, and anomalies used to support maintenance scheduling and defect tracking.
Major inspection
A comprehensive structural and mechanical examination at intervals (e.g., 10 years) set by the manufacturer or standard.