Portal boom crane

A crane whose slewing upper structure, including the boom, is mounted on a portal frame with legs that straddle a roadway, rail line, or stockpile so loads can pass beneath the structure.

Related: Portal frame, Slew ring, Rated capacity
Portal frame

The leg-and-girder structure that carries the crane's slewing assembly and travels on rails or wheels, transferring load and overturning forces into the ground or track.

Related: Portal boom crane, Rail clamp, Stability
Slew ring

The large bearing that connects the crane's upper structure to the portal frame and allows it to rotate, transmitting vertical, horizontal, and tilting forces between the two.

Related: Slewing, Portal boom crane, Slew brake
Rated capacity

The maximum load a crane may lift at a stated radius and configuration, as shown on the load chart and reduced by any applicable deductions such as hook block or attachments.

Related: Load chart, Working radius, Deduction
Load chart

The manufacturer's table or graph giving safe working loads for each boom length, radius, and configuration, including any capacity reductions for outriggers, track condition, or special setups.

Related: Rated capacity, Working radius, Boom length
Working radius

The horizontal distance from the crane's slewing centre to the vertical line through the load's centre of gravity, measured with the boom in the position used for the lift.

Related: Load chart, Rated capacity, Load moment
Load moment

The turning effect of a load about the crane's tipping line, calculated as load multiplied by radius; it determines how much of the crane's capacity is used and whether tipping is a risk.

Related: Working radius, Stability, Rated capacity
Boom length

The distance from the boom foot pin to the boom head, which changes with telescoping or lattice sections and affects the radius and capacity available for a lift.

Related: Load chart, Working radius, Boom angle
Boom angle

The angle between the boom's centreline and the horizontal, used with boom length to find working radius and to judge how capacity changes as the boom is raised or lowered.

Related: Boom length, Working radius, Rated capacity
Deduction

A weight subtracted from the gross load or chart capacity, such as the hook block, slings, spreader beam, or any lifting gear attached below the boom head.

Related: Rated capacity, Gross load, Sling
Gross load

The total weight being lifted, including the load itself plus all slings, shackles, spreaders, and other rigging attached to the hook, which must not exceed the rated capacity.

Related: Deduction, Net load, Rated capacity
Net load

The weight of the actual object being lifted, excluding slings and rigging; it is used with rigging weights to calculate gross load before checking the load chart.

Related: Gross load, Deduction, Load estimation
Load estimation

The process of determining a load's weight and centre of gravity from markings, drawings, calculations, or weighing, rather than guessing, before selecting lifting gear and checking capacity.

Related: Centre of gravity, Net load, Load chart
Centre of gravity

The point at which a load's weight is considered to act; if it is not directly below the hook, the load will tilt and the effective radius and sling tensions will change.

Related: Load estimation, Sling angle, Working radius
Sling angle

The angle between a sling leg and the horizontal, which determines the tension in each leg; flatter angles increase tension and reduce the safe working load of the sling assembly.

Related: Sling, Centre of gravity, Shackle
Sling

A flexible lifting component such as chain, wire rope, or synthetic webbing used to connect the load to the hook, chosen and rated for the load, angle, and environment.

Related: Sling angle, Shackle, Tag line
Shackle

A U-shaped connector with a pin or bolt used to join slings, hooks, and lifting points, rated for a stated working load limit and marked accordingly.

Related: Sling, Rigging, Hook block
Rigging

The arrangement of slings, shackles, spreaders, and fittings used to attach a load to the crane hook, planned so the load stays stable and within rated capacities.

Related: Sling, Shackle, Tag line
Tag line

A rope attached to a load and controlled by a person on the ground to prevent rotation or swinging during a lift, keeping that person clear of the load's path.

Related: Slewing, Load control, Dogger
Dogger

A licensed person who selects and attaches lifting gear, calculates sling loads, and directs the crane operator, often acting as the spotter or signal person during a lift.

Related: Rigger, Signal person, Tag line
Rigger

A person qualified to prepare and attach loads and lifting gear, inspect rigging, and ensure the load is balanced and secure before the operator takes the weight.

Related: Dogger, Rigging, Pre-lift check
Signal person

The designated person who relays hand, whistle, or radio signals between the load and the operator, and whose signals must be obeyed except for a stop signal from anyone.

Related: Dogger, Emergency stop signal, Radio communication
Emergency stop signal

A signal, commonly an arm raised with palm out or a shouted stop, that any person may give and that the operator must obey immediately regardless of who gave it.

Related: Signal person, Emergency lowering, Radio communication
Radio communication

Two-way voice contact between the operator and the signal person, using agreed channels and phrases, with a backup method agreed before the lift begins.

Related: Signal person, Blind lift, Emergency stop signal
Blind lift

A lift where the operator cannot see the load or its landing area and must rely on a signal person or spotter, requiring agreed signals and clear communication throughout.

Related: Radio communication, Signal person, Tag line
Pre-operational inspection

The checks made before each shift, covering structures, ropes, brakes, hooks, limit switches, alarms, and safety devices, with defects recorded and the crane taken out of service if unsafe.

Related: Defect reporting, Inspection record, Daily inspection
Daily inspection

The routine visual and functional checks completed at the start of a shift or after a change of conditions, confirming the crane is fit for use before any lift is attempted.

Related: Pre-operational inspection, Inspection record, Defect reporting
Inspection record

A written or electronic log of inspections, tests, and maintenance, including dates, findings, and actions taken, kept as evidence that the crane has been maintained and checked.

Related: Daily inspection, Defect reporting, Maintenance schedule
Defect reporting

The process of recording and notifying the responsible person of any fault, damage, or worn component found on the crane or lifting gear, and tagging out equipment until repaired.

Related: Inspection record, Out of service tag, Maintenance schedule
Out of service tag

A tag attached to a defective crane or item of lifting gear to warn others that it must not be used until the fault is repaired and the tag is removed by an authorised person.

Related: Defect reporting, Lockout tagout, Inspection record
Maintenance schedule

The manufacturer's or owner's plan of periodic servicing, lubrication, and component replacement, used to keep the crane within its design limits and support inspection records.

Related: Inspection record, Defect reporting, Wire rope inspection
Stability

The crane's resistance to tipping or overturning, affected by load moment, ground bearing capacity, track condition, wind, and the position of the slew and boom.

Related: Load moment, Ground bearing pressure, Rail clamp
Ground bearing pressure

The pressure a crane's feet, wheels, or outriggers apply to the ground, which must be within the ground's capacity, using pads or spreader mats where needed.

Related: Stability, Outrigger, Track condition
Rail clamp

A device that grips the rail to hold the portal crane in position, especially in wind, and must be released before travel and applied when the crane is parked.

Related: Portal frame, Wind load, Travel
Track condition

The state of the rails or runway, including alignment, gauge, level, and obstructions, which affects travel safety and the crane's stability during lifting and moving.

Related: Rail clamp, Ground bearing pressure, Travel
Slewing

Rotating the crane's upper structure about its vertical axis; it must be done smoothly, with the load controlled by tag lines, to limit swing and dynamic forces.

Related: Slew brake, Tag line, Load control
Slew brake

The brake that holds or slows the slewing motion, used to stop rotation smoothly and to hold the upper structure in position when the crane is parked.

Related: Slewing, Load control, Rail clamp
Load control

Managing a load's movement by smooth acceleration, braking, and slewing so it does not swing, rotate, or contact people and structures, using tag lines and planned signals.

Related: Slewing, Tag line, Swing
Travel

Moving the portal crane along its runway, which is normally done without a suspended load unless the manufacturer permits it and the route and load are controlled.

Related: Rail clamp, Track condition, Load control
Wind load

The force wind exerts on the boom, load, and portal frame, which increases with sail area and can reduce capacity or require the lift to stop at set wind speeds.

Related: Stability, Rail clamp, Load chart
Lockout tagout

The procedure of isolating energy sources and fitting locks and tags before maintenance or repair, preventing accidental start-up or movement of the crane.

Related: Out of service tag, Defect reporting, Maintenance schedule
Emergency lowering

A controlled procedure for landing a suspended load when power or controls fail, using backup systems and following the manufacturer's instructions while keeping people clear.

Related: Emergency stop signal, Incident response, Load control
Incident response

The actions taken after a near miss, contact, dropped load, or injury: stop work, secure the area, render first aid, notify supervisors, and preserve evidence for investigation.

Related: Emergency lowering, Defect reporting, Shutdown procedure
Shutdown procedure

The sequence for parking and securing the crane at the end of a shift, including landing the load, applying brakes and rail clamps, and isolating power as required.

Related: Rail clamp, Slew brake, Incident response
Pre-lift check

The final confirmation before lifting that the load is rigged correctly, the area is clear, the load chart is satisfied, and communication and escape routes are in place.

Related: Rigger, Load chart, Signal person
Duty of care

The legal obligation of employers, supervisors, and workers to take reasonable steps to protect the health and safety of themselves and others affected by their work.

Related: Risk assessment, Hierarchy of control, Safe work method statement
Risk assessment

A structured process of identifying hazards, judging the likelihood and severity of harm, and deciding controls before work begins, reviewed when conditions change.

Related: Hierarchy of control, Hazard identification, Safe work method statement
Hierarchy of control

The order of preference for managing risk: eliminate the hazard, then substitute, engineer, administrate, and finally use personal protective equipment as the last line.

Related: Risk assessment, Duty of care, Safe work method statement
Safe work method statement

A written document describing how high-risk work will be done, the hazards and controls, and the sequence of steps, kept available and followed on site.

Related: Risk assessment, Duty of care, Pre-lift check
Hazard identification

The ongoing process of spotting anything with potential to cause harm, such as powerlines, unstable ground, defective gear, poor lighting, or people in the lifting area.

Related: Risk assessment, Exclusion zone, Hierarchy of control
Exclusion zone

A marked area beneath and around the lift where only essential personnel may enter, keeping people clear of suspended loads and swing paths.

Related: Hazard identification, Tag line, Load control
Hook block

The assembly of hook, sheaves, and frame that hangs from the boom ropes, carries the load, and is included in the gross load when checking capacity.

Related: Deduction, Gross load, Sling
Limit switch

A device that stops a crane motion, such as hoisting up or lowering, at a set point to prevent damage or rope slack, and must be tested during inspection.

Related: Pre-operational inspection, Daily inspection, Defect reporting
Wire rope inspection

Checking a crane rope for broken wires, corrosion, kinks, birdcaging, and wear against rejection criteria, with results recorded and the rope replaced when condemned.

Related: Maintenance schedule, Inspection record, Defect reporting